19.04.2013 Views

Geotechnical and Materials Engineering Standards for Bridge ...

Geotechnical and Materials Engineering Standards for Bridge ...

Geotechnical and Materials Engineering Standards for Bridge ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PLOT :<br />

B - BOUNDARY<br />

- defines defined material boundary <strong>and</strong> depth<br />

Cm> -<br />

DB - DASHED BOUNDARY<br />

- shows approximate material boundary <strong>and</strong> depth<br />

(m> *<br />

JB1 <strong>and</strong> JB2 - JOGGED BOUNDARY<br />

- deftnes material boundary <strong>and</strong> depth (m) with<br />

extra space <strong>for</strong> description.<br />

VT-M - Water Table Measured<br />

WT-E - Water Table Estimated<br />

WT-A - Water Table with two text lines <strong>for</strong> Artesian Source<br />

- shows water table <strong>and</strong> date.<br />

D - DESCRIPTION<br />

- inserts 4 Lines of text <strong>for</strong> describing material typc,<br />

approximately 35 characters per line.<br />

BL - BLOWCOUNT DETAILS<br />

- sub heading <strong>for</strong> Drilling Details column when blowcounts<br />

are greater than 100.<br />

FOR EDITING BLOCKS<br />

set var - ATTDIR (1)<br />

comm<strong>and</strong> - DDATTE<br />

1 - 1 (freeze unwanted layers)<br />

- PLOT VIEW 0 8.5" x 11" plot<br />

- WWCK <strong>for</strong> insertion onto AT sizes drawing.<br />

- Pen sizes are:<br />

red - 0.25<br />

yellow - 0.35<br />

green - 0.50<br />

cyan - 0.70

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!