- Page 1 and 2: Directive 065 Revised edition March
- Page 3 and 4: Unit 6 - Gas and Ethane Removal ...
- Page 5 and 6: How to Use This Directive Introduct
- Page 7 and 8: − The decision tree criterion tha
- Page 9 and 10: Resolving significant differences,
- Page 11: Figure 1. Resources Applications Pr
- Page 16 and 17: SUBMISSION STATUS SUBMISSION ID CRE
- Page 18 and 19: Consequences of Incomplete Notifica
- Page 20 and 21: Table 2. Minimum notification requi
- Page 22 and 23: 1.1.4 Requirements for an Applicati
- Page 24 and 25: Requirements Comments 7) Where drai
- Page 26 and 27: 1.2 Application for a Common Purcha
- Page 28 and 29: Requirements Comments a) the point
- Page 30 and 31: Requirements Comments c) estimates
- Page 32 and 33: Requirements Comments 14) If you ar
- Page 34 and 35: If there is a dispute as to the tar
- Page 36 and 37: Requirements Comments b) an outline
- Page 38 and 39: Requirements Comments b) an estimat
- Page 40 and 41: Requirements Comments 15) If you ar
- Page 42 and 43: typically also includes requests un
- Page 44 and 45: Requirements Comments 5) A map show
- Page 46 and 47: Requirements Comments production, y
- Page 48 and 49: Requirements Comments a) the steps
- Page 50 and 51: Except in cases involving missing a
- Page 52 and 53: Requirements Comments 8) If there i
- Page 54 and 55: Requirements Comments costs within
- Page 56 and 57: No Is this a waterflood scheme? (Qu
- Page 58 and 59: confirmation that both the ER schem
- Page 60 and 61: B) Design Stage • In waterfloods,
- Page 62 and 63:
• Resources Applications Schedule
- Page 64 and 65:
Proposed Injection Well Locations a
- Page 66 and 67:
NO means that the proposed approval
- Page 68 and 69:
NO means that an associated gas cap
- Page 70 and 71:
• within the notification area sp
- Page 72 and 73:
2) interpretation of fluid interfac
- Page 74 and 75:
) a correlation of injection fluid
- Page 76 and 77:
2.4 Application for Concurrent Prod
- Page 78 and 79:
Requirements Comments d) the suppor
- Page 80 and 81:
2.5 Application for Pool Delineatio
- Page 82 and 83:
Requirements Comments c) an interpr
- Page 84 and 85:
• a good understanding of the res
- Page 86 and 87:
• qualify to use the DE or SD pro
- Page 88 and 89:
3.1.4 Determination of Commingling
- Page 90 and 91:
Figure 3.2. Decision Tree for the C
- Page 92 and 93:
For additional information, refer t
- Page 94 and 95:
Figure 3.4. Decision Tree to Determ
- Page 96 and 97:
If it is anticipated that water vol
- Page 98 and 99:
contact the ERCB for resolution. Af
- Page 100 and 101:
commingling must remain segregated
- Page 102 and 103:
An application for approval to comm
- Page 104 and 105:
Requirements Comments mineral owner
- Page 106 and 107:
Requirements Comments a) a net pay
- Page 108 and 109:
Requirements Comments • 90 per ce
- Page 110 and 111:
Requirements Comments pressures, to
- Page 112 and 113:
3.3 Application for Good Production
- Page 114 and 115:
Requirements Comments 4) Analysis,
- Page 116 and 117:
3.4 Application for Gas-Oil Ratio P
- Page 118 and 119:
3.6 Application to Amend or Rescind
- Page 120 and 121:
Conservation Requirements Comments
- Page 122 and 123:
Requirements Comments c) the effect
- Page 124 and 125:
3-42 • ERCB Directive 065: Resour
- Page 126 and 127:
Requirements Comments d) disposal f
- Page 128 and 129:
Requirements Comments 3) Discussion
- Page 130 and 131:
Requirements Comments d) a copy of
- Page 132 and 133:
Oilfield or Industrial Waste Fluid
- Page 134 and 135:
4.2 Application for Acid Gas Dispos
- Page 136 and 137:
Requirements Comments 4) Migration
- Page 138 and 139:
Requirements Comments 3) If request
- Page 140 and 141:
4.3 Application for Underground Gas
- Page 142 and 143:
Requirements Comments a) for the st
- Page 144 and 145:
Equity Equity is an important issue
- Page 146 and 147:
Requirements Comments 4) When submi
- Page 148 and 149:
5.2 Change of Approval Holder 5.2.1
- Page 150 and 151:
6.3.1 Short-Term Gas Removal Applic
- Page 152 and 153:
company holding the permit, or its
- Page 154 and 155:
Requirements Comments d) For a requ
- Page 156 and 157:
Requirements Comments 3) Permit(s)
- Page 158 and 159:
Requirements Comments 10) Attach a
- Page 160 and 161:
Requirements Comments b) If a third
- Page 162 and 163:
Requirements Comments 7) Are transp
- Page 165 and 166:
Unit 7 Application for Special Well
- Page 167 and 168:
Oil The baseline well density for o
- Page 169 and 170:
A well that was drilled in accordan
- Page 171 and 172:
The ERCB validates all applications
- Page 173 and 174:
zone for the area. This type of req
- Page 175 and 176:
7.3.1.6 Common Ownership As defined
- Page 177 and 178:
formation-specific production infor
- Page 179 and 180:
Figure 7.5. Quick application path
- Page 181 and 182:
7.4.4 Processing Paths for Differen
- Page 183 and 184:
7.5 Attachments Required for a Spec
- Page 185 and 186:
4) Are there any outstanding object
- Page 187 and 188:
production data for each applied-fo
- Page 189:
Table 7.2. Production and volumetri
- Page 192 and 193:
Unit 2—Conservation 2.1 Enhanced
- Page 194 and 195:
A-4 • ERCB Directive 065: Resourc
- Page 196 and 197:
Sample Template of Company-to-Compa
- Page 198 and 199:
Application for Gas-Oil Ratio (GOR)
- Page 200 and 201:
A-10 • ERCB Directive 065: Resour
- Page 202 and 203:
A-12 • ERCB Directive 65: Resourc
- Page 204 and 205:
A-14 • ERCB Directive 065: Resour
- Page 206 and 207:
2 OWNERSHIP AND NOTIFICATION INFORM
- Page 208 and 209:
4 PROPOSED APPROVAL AREA 13. Is the
- Page 210 and 211:
A-20 • ERCB Directive 065: Resour
- Page 212 and 213:
5. Term of permit Existing term and
- Page 214 and 215:
Long-Term Gas Removal Application (
- Page 216 and 217:
Short-Term Ethane Removal Applicati
- Page 218 and 219:
DATE YR/MO/DAY │ │ │ │ │
- Page 220 and 221:
A-30 • ERCB Directive 065: Resour
- Page 222 and 223:
A-32 • ERCB Directive 065: Resour
- Page 224 and 225:
6) Is the proposed well density les
- Page 226 and 227:
A-36 • ERCB Directive 065: Resour
- Page 228 and 229:
A-38 • ERCB Directive 065: Resour
- Page 230 and 231:
A-40 • ERCB Directive 065: Resour
- Page 232 and 233:
A-42 • ERCB Directive 065: Resour
- Page 234 and 235:
4a) If YES, enter the interwell dis
- Page 236 and 237:
A-46 • ERCB Directive 065: Resour
- Page 238 and 239:
A-48 • ERCB Directive 065: Resour
- Page 240 and 241:
A-50 • ERCB Directive 065: Resour
- Page 242 and 243:
• 1 Legal Subdivision • 2 Legal
- Page 244 and 245:
Lessees and Unleased Freehold Notif
- Page 246 and 247:
Leased Individual Freehold Notifica
- Page 248 and 249:
A-58 • ERCB Directive 065: Resour
- Page 250 and 251:
Lessor Map and Notification Area Sh
- Page 252 and 253:
Mineral Rights Ownership and Notifi
- Page 254 and 255:
Examples of Development on Multiple
- Page 256 and 257:
A-66 • ERCB Directive 065: Resour
- Page 258 and 259:
DECLARATION OF COMMON OWNERSHIP ___