Table 1 Minimum Notification Requirements Required Prior to Filing Application ...............19<br />

Table 2 Minimum Notification Requirements Required Prior to ERCB Decision....................20<br />

Unit 1 – Equity ................................................................................................................................. 1-1<br />

1.1 Application for a Rateable Take Order ................................................................................ 1-1<br />

1.2 Application for a Common Purchaser Order........................................................................ 1-6<br />

1.3 Application for a Common Carrier Order .......................................................................... 1-13<br />

1.4 Application for a Common Processor Order ...................................................................... 1-21<br />

1.5 Application for a Compulsory Pooling Order .................................................................... 1-29<br />

1.6 Special Drilling Spacing Unit..................................................................................... rescinded<br />

Unit 2 – <strong>Conservation</strong>........................................................................................................................ 2-1<br />

2.1 Application for an Enhanced Recovery Scheme .................................................................. 2-1<br />

Figure 2.1 Decision Tree for Quick Enhanced Recovery Application Process ................. 2-2<br />

2.2 Enhanced Oil Recovery Project.................................................................................. rescinded<br />

2.3 Enhanced Recovery Recognition and Good Production Practice for Enhanced and<br />

Oil Recovery Schemes ............................................................................................... rescinded<br />

2.4 Application for Concurrent Production.............................................................................. 2-22<br />

2.5 Application for Pool Delineation and Ultimate Reserves .................................................. 2-26<br />

Unit 3 – Production Control .............................................................................................................. 3-1<br />

3.1 Commingled Production.......................................................................................................3-1<br />

Figure 3.1 Decision Tree to Determine Process to Commingle Production ...................... 3-6<br />

Figure 3.2 Decision Tree for the Commingling of Gas Production from Intervals<br />

Within a Development Entity (DE) .................................................................. 3-8<br />

Figure 3.3 Decision Tree to Determine If the Proposed Commingling Is a Candidate<br />

for Self-Declared Gas Commingling in a Well............................................... 3-10<br />

Figure 3.4 Decision Tree to Determine If the Proposed Commingling Is a Candidate<br />

for Self-Declared Oil Commingling in a Well................................................ 3-12<br />

Table 3.1 Notification Requirements for Commingling Applications.............................. 3-5<br />

Table 3.2 Summary of Requirements for Commingling on a Well, Pool, or<br />

Area Basis....................................................................................................... 3-19<br />

3.2 Background to Good Production Practice, Gas-Oil Ratio Penalty Relief, and<br />

Special Maximum Rate Limitation .................................................................................... 3-29<br />

3.3 Application for Good Production Practice—Primary Depletion Pools ............................. 3-30<br />

3.4 Application for Gas-Oil Ratio Penalty Relief .................................................................... 3-34<br />

3.5 Application for Special Maximum Rate Limitation (MRL)............................................... 3-35<br />

3.6 Application to Amend or Rescind a Gas Allowable Order ................................................ 3-36<br />

Unit 4 – Disposal/Storage.................................................................................................................. 4-1<br />

4.1 Application for Class I–IV Disposal ................................................................................... 4-1<br />

4.2 Application for Acid Gas Disposal..................................................................................... 4-10<br />

4.3 Application for Underground Gas Storage......................................................................... 4-16<br />

Unit 5 – Corporate Changes .............................................................................................................. 5-1<br />

5.1 Change in Name of Approval Holder................................................................................... 5-1<br />

5.2 Change of Approval Holder ................................................................................................. 5-2<br />

2 • ERCB <strong>Directive</strong> <strong>065</strong>: <strong>Resources</strong> Applications / Contents (March 2012)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!