25.04.2013 Views

Directive 065 - Energy Resources Conservation Board

Directive 065 - Energy Resources Conservation Board

Directive 065 - Energy Resources Conservation Board

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Requirements Comments<br />

ii) interpretation of fluid interfaces<br />

present,<br />

iii) completions and treatments to the<br />

wellbore(s), with dates,<br />

iv) cumulative production,<br />

v) finished drilling date and kelly<br />

bushing (KB) elevation, and<br />

vi) the scale of the log readings, and<br />

c) a tabulation of the interpreted net pay,<br />

porosity, and water saturation for each<br />

well in the pool, along with the cutoffs,<br />

methodology, formulas, and constants<br />

used.<br />

5) An evaluation of the oil and gas reserves for<br />

the pool and for your lands, including<br />

a) an estimate of the initial oil volume and<br />

gas volume in place,<br />

b) an estimate of the oil and gas recovery<br />

factors,<br />

c) a description of the methods used in<br />

determining (a) and (b) above (e.g.,<br />

material balance, volumetric analysis,<br />

model study, a comparison of analog<br />

pools), and<br />

d) the supporting data used in determining<br />

(a) and (b) above and the sources of the<br />

data (i.e., pressure/volume/temperature<br />

(PVT) properties and source, pressure<br />

data and source).<br />

6) Deliverability test data showing that your<br />

well is capable of producing at an economic<br />

rate from the pool to which the proposed<br />

order would apply.<br />

This allows the ERCB to assess your<br />

mapping and reserves calculation requested<br />

in the following item. In addition, these data<br />

may be used to allocate production (see item<br />

8 below).<br />

The reserves estimates confirm that there are<br />

reserves available for production.<br />

All data used in obtaining the reserves<br />

estimates should be provided so that your<br />

analysis can be duplicated using information<br />

supplied in this application.<br />

A summary of the deliverability test data<br />

may be used provided the detailed test data<br />

have been filed in accordance with ERCB<br />

<strong>Directive</strong> 040.<br />

ERCB <strong>Directive</strong> <strong>065</strong>: <strong>Resources</strong> Applications / Rateable Take (March 2012) • 1-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!