- Page 1 and 2: Directive 065 Revised edition March
- Page 3 and 4: Unit 6 - Gas and Ethane Removal ...
- Page 5 and 6: How to Use This Directive Introduct
- Page 7 and 8: − The decision tree criterion tha
- Page 9 and 10: Resolving significant differences,
- Page 11 and 12: Figure 1. Resources Applications Pr
- Page 13: Figure 3. Well Spacing Applications
- Page 17 and 18: Resources Applications Notification
- Page 19 and 20: Table 1. Minimum notification requi
- Page 21 and 22: Unit 1 Equity 1.1 Application for a
- Page 23 and 24: Requirements Comments ii) interpret
- Page 25 and 26: Requirements Comments It is not usu
- Page 27 and 28: 51(4)(b), 55(2), and 56, although e
- Page 29 and 30: Requirements Comments vi) the scale
- Page 31 and 32: Requirements Comments b) a statemen
- Page 33 and 34: 1.3 Application for a Common Carrie
- Page 35 and 36: Requirements Comments b) the name o
- Page 37 and 38: Requirements Comments iii) completi
- Page 39 and 40: Requirements Comments b) a statemen
- Page 41 and 42: 1.4 Application for a Common Proces
- Page 43 and 44: Requirements Comments 2) A statemen
- Page 45 and 46: Requirements Comments wellbore(s),
- Page 47 and 48: Requirements Comments into an alloc
- Page 49 and 50: 1.5 Application for a Compulsory Po
- Page 51 and 52: Requirements Comments 3) A statemen
- Page 53 and 54: Requirements Comments ii) interpret
- Page 55 and 56: Unit 2 Conservation 2.1 Application
- Page 57 and 58: The ERCB will issue its disposition
- Page 59 and 60: • The holder of the ER approval m
- Page 61 and 62: • The proposed injection wells ha
- Page 63 and 64: Add injection well location(s): Sel
- Page 65 and 66:
Multiple injection fluids may be se
- Page 67 and 68:
Scheme Details 16) Is the scheme ar
- Page 69 and 70:
7) the type, composition, and sourc
- Page 71 and 72:
4) the reservoir area, average net
- Page 73 and 74:
Amend Approval Area Provide a writt
- Page 75 and 76:
2.1.4 ER Related Processes 2.1.4.1
- Page 77 and 78:
Requirements Comments i) stratigrap
- Page 79 and 80:
Requirements Comments 10) An estima
- Page 81 and 82:
2.5.3 How the ERCB Processes the Ap
- Page 83 and 84:
Unit 3 Production Control 3.1 Commi
- Page 85 and 86:
3.1.3.3 Data Collection Data collec
- Page 87 and 88:
Table 3.1 Notification Requirements
- Page 89 and 90:
non-producing wellbores. That is, a
- Page 91 and 92:
3.1.6 SD Unsegregated Production If
- Page 93 and 94:
3.1.6.2 Requirements for SD Comming
- Page 95 and 96:
3.1.7 Explanatory Notes to Determin
- Page 97 and 98:
Closure pressure is the pressure ne
- Page 99 and 100:
the well licensee may then review t
- Page 101 and 102:
Table 3.2 Summary of Requirements f
- Page 103 and 104:
Requirements Comments between the p
- Page 105 and 106:
Requirements Comments 5) a) Identif
- Page 107 and 108:
Requirements Comments b) if a well
- Page 109 and 110:
Requirements Comments pools), and i
- Page 111 and 112:
3.2 Background to Good Production P
- Page 113 and 114:
Requirements Comments d) a tabulati
- Page 115 and 116:
Requirements Comments b) identify t
- Page 117 and 118:
3.5 Application for Special Maximum
- Page 119 and 120:
3.6.3 How the ERCB Processes the Ap
- Page 121 and 122:
Requirements Comments b) the predic
- Page 123 and 124:
Requirements Comments 2) A list of
- Page 125 and 126:
Unit 4 Disposal/Storage 4.1 Applica
- Page 127 and 128:
Requirements Comments c) porosity a
- Page 129 and 130:
Requirements Comments 11) A tabulat
- Page 131 and 132:
Equity—Class II-IV Only Disposal
- Page 133 and 134:
Requirements Comments 5) A discussi
- Page 135 and 136:
Requirements Comments 2) For boundi
- Page 137 and 138:
Requirements Comments 2) For non-H2
- Page 139 and 140:
Notification—Equity and Safety Re
- Page 141 and 142:
Requirements Comments i) stratigrap
- Page 143 and 144:
Pool Reserves and Deliverability In
- Page 145 and 146:
Environment and Safety The ERCB is
- Page 147 and 148:
Unit 5 Corporate Changes 5.1 Change
- Page 149 and 150:
Unit 6 Gas and Ethane Removal 6.1 B
- Page 151 and 152:
ERCB receives objections to an appl
- Page 153 and 154:
Requirements Comments c) Maximum te
- Page 155 and 156:
Requirements Comments a) For each p
- Page 157 and 158:
Requirements Comments 6) Name of pr
- Page 159 and 160:
Requirements Comments 11) Attach a
- Page 161 and 162:
Requirements Comments 5) Term of pe
- Page 163:
Requirements Comments b) If a third
- Page 166 and 167:
Figure 7.1. OGCR Schedule 13A Basel
- Page 168 and 169:
Any approved special well spacing s
- Page 170 and 171:
If a horizontal well is drilled fro
- Page 172 and 173:
Applications for special DSUs will
- Page 174 and 175:
Note that for applications to resci
- Page 176 and 177:
the entire area of application and
- Page 178 and 179:
volumetric reserves data have been
- Page 180 and 181:
Figure 7.6. Standard application pa
- Page 182 and 183:
7.4.6 ERCB Spacing Application Deci
- Page 184 and 185:
7.6 Explanatory Notes for Applicati
- Page 186 and 187:
7.6.2.4 Application Details 1) What
- Page 188 and 189:
Table 7.2. Production and volumetri
- Page 191 and 192:
Appendix A References How to Use Th
- Page 193 and 194:
Unit 4—Disposal/Storage 4.1 Class
- Page 195 and 196:
Appendix B Notification Template Sa
- Page 197 and 198:
Appendix C Application for Gas-Oil
- Page 199 and 200:
Appendix D Transfer of Approval AGR
- Page 201 and 202:
Appendix E ERCB Staff Contacts* UNI
- Page 203 and 204:
Appendix F Enhanced Recovery (ER) S
- Page 205 and 206:
DAY MONTH YEAR Resources Enhanced R
- Page 207 and 208:
10. Provide the following for the p
- Page 209 and 210:
Appendix G Gas and Ethane Removal F
- Page 211 and 212:
This application is made under Sect
- Page 213 and 214:
Long-Term Gas Removal Application (
- Page 215 and 216:
This application is made under Sect
- Page 217 and 218:
Appendix H Gas Reserve Data Sheet E
- Page 219 and 220:
Appendix I EAS Well Spacing Applica
- Page 221 and 222:
New Spacing Application—Holdings
- Page 223 and 224:
Completing the New Spacing Applicat
- Page 225 and 226:
• 1 Section • Limited by Buffer
- Page 227 and 228:
New Spacing Application—Special D
- Page 229 and 230:
Completing the New Spacing Applicat
- Page 231 and 232:
Rescind Spacing Application—Holdi
- Page 233 and 234:
Completing the Rescind Spacing Appl
- Page 235 and 236:
Rescind Spacing Application—Speci
- Page 237 and 238:
Completing the Rescind Spacing Appl
- Page 239 and 240:
Modify Spacing Application—Holdin
- Page 241 and 242:
Completing the Modify Spacing Appli
- Page 243 and 244:
Appendix J Special Well Spacing Not
- Page 245 and 246:
ERCB that you do not want to appear
- Page 247 and 248:
OR As [Company] is the lessee of yo
- Page 249 and 250:
Appendix K Special Well Spacing Att
- Page 251 and 252:
Lessee Map and Notification Area Sh
- Page 253 and 254:
Appendix L Standard Target Areas an
- Page 255 and 256:
Appendix M Target Area Descriptions
- Page 257 and 258:
Appendix N Special Well Spacing Dec
- Page 259:
DECLARATION OF NOTIFICATION _______