Directive 065 - Energy Resources Conservation Board
Directive 065 - Energy Resources Conservation Board
Directive 065 - Energy Resources Conservation Board
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Requirements Comments<br />
vi) the scale of the log readings, and<br />
d) a tabulation of the interpreted net pay,<br />
porosity, and water saturation for each well<br />
in the pool, along with the cutoffs,<br />
methodology, formulas, and constants used.<br />
5) Data showing that the well is completed and<br />
capable of producing at an economic rate from<br />
the pool to which the common purchaser order<br />
is to apply.<br />
6) An evaluation of the oil and gas reserves for the<br />
pool and for your lands, including<br />
a) an estimate of the initial oil volume and gas<br />
volume in place,<br />
b) an estimate of the oil and gas recovery<br />
factors,<br />
c) a description of the methods used in<br />
determining (a) and (b) above (i.e., material<br />
balance, volumetric analysis, model study,<br />
a comparison of analog pools), and<br />
d) the supporting data used in determining (a)<br />
and (b) above and the sources of the data<br />
(i.e., pressure/volume/temperature [PVT]<br />
properties and source, pressure data and<br />
source).<br />
7) A discussion of drainage, including<br />
a) evidence showing that the reserves<br />
underlying your lands have been drained<br />
subsequent to the completion of your well<br />
in the pool,<br />
b) an estimate of the total amount of drainage<br />
that has occurred from your lands since<br />
your well was completed in the pool,<br />
together with details of how the drainage<br />
was calculated, and<br />
These data allow the ERCB to assess your<br />
mapping and reserves calculations requested in<br />
the following item. In addition, these data may<br />
be used to allocate production (see item 13).<br />
The reserves estimates confirm that there are<br />
reserves available for production.<br />
You should provide all data used in obtaining<br />
the reserves estimates so that your analysis can<br />
be duplicated.<br />
Drainage should be confirmed by summarizing<br />
at least two pressure tests obtained from the<br />
well.<br />
ERCB <strong>Directive</strong> <strong>065</strong>: <strong>Resources</strong> Applications / Common Purchaser (March 2012) • 1-9