2. Description Of Management units •.......••...•..•....•.•... 2 3. Current ...
2. Description Of Management units •.......••...•..•....•.•... 2 3. Current ...
2. Description Of Management units •.......••...•..•....•.•... 2 3. Current ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
AREA 8 WEEKLY MANAGEMENT PLAN<br />
TARGET SPECIES: Chinook<br />
FOR WEEKLY FISHING PERIOD: Sun Jun 14 Sat Jun 20/92 WEEK ff 25<br />
MANAGEMENT ACTIONS FOR THE CURRENT WEEK<br />
<strong>Management</strong> Objectives: To test stock strength and harvest Atnarko<br />
River Chinook.<br />
Date and Time Open: Mon Jun 15 @ 18:00 Hours.<br />
Anticipated Date and Time Closed: Tue Jun 16 @ 18:00 Hours.<br />
Subareas Open and Gear Type: 8-10, 8-11, 8-12 (North of Bensins<br />
Island), 8-13 (North of Restoration<br />
Bay) & 8-15 for Gill nets only<br />
Gear Restrictions: 203 mm minimum mesh restriction<br />
Extensions: None<br />
CURRENT WEEK MANAGEMENT INFORMATION<br />
- The fishery this week was opened<br />
established at the Central Coast<br />
1991 <strong>•</strong><br />
up as per the preseason fishing plan<br />
Advisory Meeting held in December,<br />
85 gill nets averaged 5 Chinooks for the 24 hour fishery<br />
The Bella Coola River IFF catch is ahead of 1990 and 1991/<br />
Week 24, 1990 - 390 drifts for 679 Chinooks (1.7 Ch/drift)<br />
1991 - 364 drifts for 690 Chinooks (1.9 Ch/drift)<br />
1992 - 496 drifts for 1064 Chinooks (<strong>2.</strong>2 Ch/drift)<br />
The IFF Chinook regression model is predicting an escapement of<br />
Chinooks for Week 24.<br />
23000<br />
- The gear in operating in 8-13 was separated from the rest of the Bella<br />
Coola Gill Net Area. 11 gill nets operated in 8-13 catching 81<br />
Chinook for the fishery. The majority of the fish caught in this area<br />
were were packed in separate totes to be sampled separately from the<br />
rest of the Chinook by Port Samplers in Vancouver.<br />
CURRENT WEEK RECOMMENDATION<br />
Tuesday June 16<br />
- To close the fishery as scheduled at 1800 hours June 16th.<br />
- The Chinook surplus can be harvested in an orderly manner by fishing<br />
1 day per week<br />
NEXT WEEK'S RECOMMENDATION<br />
Thursday, June 18<br />
-To open for 24 hours in the same location as this week.<br />
Recommendation accepted.<br />
21