APPENDIX C.4 Vessel <strong>Culebra</strong> <strong>II</strong> Condition Survey<br />
M/V <strong>Culebra</strong> <strong>II</strong><br />
ON. D10411850<br />
CARGO & 523 PASSENGERS<br />
CONDITION SURVEY<br />
CS-01-March/15/2011<br />
Inspection Date: February 28, 2011<br />
Condition Survey Date: March 15, 2011<br />
Inspected by: Eng. Carlos E. Claudio<br />
Location: Fajardo Terminal, Playa Puerto Real, Puerto Rico<br />
Built: 1996<br />
LOA: 150, NET/GR Ton: 61/90<br />
Hull: Aluminum<br />
Propulsion/Gear: Detroit Diesel (4 ) 16V92 TI/Twin Disc<br />
Actual Status: Out of service, Dry dock expired<br />
Next Annual COI expired<br />
1<br />
Confidential
Index:<br />
Scope of Work<br />
Analysis<br />
Condition Survey Report<br />
2<br />
Confidential
Scope of Work:<br />
The purpose of this report is to present actual operating conditions of<br />
M/V Cayo Norte as per owner’s instruction after a visual inspection of<br />
on board equipment.<br />
Pictures and comments report presentation of outstanding items to be<br />
correct in way to reinstall vessel in operating conditions.<br />
Analysis and recommendations on immediate and long terms<br />
maintenance projections included.<br />
3<br />
Confidential
Analysis:<br />
Vessel in bad condition with a lot maintenance work, dry dock is schedule for<br />
March 2011.<br />
Dry docking work to be accomplish:<br />
Haul in/out<br />
Blocks set up<br />
Lay days<br />
Hull scrape<br />
Hull press wash<br />
Hull sand blasting<br />
Hull epoxy paint system application<br />
Name and draft marks<br />
Propulsion system removal and reinstall<br />
Rudder removal and reinstall<br />
Propulsion cutlass bearings renewal<br />
Rudders cutlass bearings, carrier bearings, and packing to be renew<br />
Propellers repair, re pitch, and balance<br />
Top sides press wash and painting<br />
Antifouling paint system application<br />
Sea valves open for inspection and reinstall<br />
Zinc anodes removal and renewal<br />
4<br />
Confidential
Condition Survey Report<br />
Vessel: <strong>Culebra</strong> <strong>II</strong><br />
Report Date: March 15, 2011<br />
Inspection Date: February 28, 2011<br />
Report: Condition Survey, CS-01-March/15/2011<br />
By: Carlos E. Claudio<br />
Pressure wash and epoxy paint system application to upper structure, top sides, and<br />
underwater hull.<br />
Hull painting. Crop and renew stern corners P & S.<br />
5<br />
Confidential
Transom press wash and paint. Upper structure crack repairs fwd doors.<br />
6<br />
Confidential
Forward deck press wash and paint. Forward structure press wash and paint.<br />
Void vents maintain. Collision bulkhead valve and rod missing.<br />
7<br />
Confidential
Fore Peak Tank full of rain water. Remove water and dry.<br />
8<br />
Confidential
Void No. 1 Bow Thruster remove water. Bow Thruster electric motor remove.<br />
Bow Thruster overhaul and test.<br />
Inside spaces clean and paint as required through entire vessel.<br />
9<br />
Confidential
Passenger forward.<br />
Handicap bathroom.<br />
10<br />
Confidential
Passenger aft. Passenger aft.<br />
11<br />
Confidential
Passenger aft. Bathrooms.<br />
Doors locks. Broken lock.<br />
12<br />
Confidential
Bathroom doors. Inside bathrooms.<br />
13<br />
Confidential
Bathroom divisions. Bathroom graffiti.<br />
Manhole cover. Sewage tank maintain.<br />
14<br />
Confidential
Sewage bilges clean. Sewage / water pumps contactors maintain<br />
15<br />
Confidential
Bathroom grafity. Upper deck access stairs maintain.<br />
Passenger area aft. Passengers area aft.<br />
16<br />
Confidential
Fire damper test. Fire dampers open for inspection.<br />
17<br />
Confidential
Fire damper test. Fire damper open for inspection.<br />
A/C air handling units maintain. Water tight door closing assembly test.<br />
Water tight door test for operation. Water tight door closing assembly test.<br />
Rudders removal, maintain rudders packing area, re pack, and reinstallation.<br />
18<br />
Confidential
Port side rudder assembly. Stbd side rudder assembly.<br />
Rudder angle indicator test.<br />
19<br />
Confidential
Generator No. 1 maintain. Generator No. 2 maintain.<br />
20<br />
Confidential
Main Engine No. 1 Clean and maintain. Main Engine No. 2 Clean and maintain.<br />
Main Engine No. 3 Clean and maintain. Main Engine No. 4 Clean and maintain.<br />
21<br />
Confidential
Remove fin stabilizers unit not in use. Remove sprinklers, bilge, fire pumps and repair.<br />
22<br />
Confidential
Maintain bilges suction pipes. ` Maintain fire damper assembly.<br />
Air dampers grill renew. Sprinkler pump repair.<br />
23<br />
Confidential
Fire pump repair. Bilge pump repair.<br />
Air compressor renewal. Fire damper maintain.<br />
24<br />
Confidential
Fire damper grill renew. Control system wiring removal.<br />
Packing box No. 1 maintain. Packing box No. 2 maintain.<br />
25<br />
Confidential
Packing box No. 3 maintain. Packing box No. 4 maintain.<br />
26<br />
Confidential
Bilges waste oil removal and cleaning. Bilges waste oil removal and cleaning.<br />
Battery bank test, clean, and maintain. Battery bank test, clean, and maintain.<br />
Battery bank test, clean, and maintain. Battery bank test, clean, and maintain.<br />
27<br />
Confidential
Exhaust mufflers water leaks repairs. Exhaust mufflers insulate.<br />
Exhaust flex repairs and insulate. Exhaust muffler insulate.<br />
28<br />
Confidential
Exhaust mufflers water leaks repair. Exhaust mufflers insulate.<br />
29<br />
Confidential
Ventilation fans maintain. Do not use graffito packing<br />
Security cameras test and maintain. Upper deck access stair clean and paint.<br />
Upper passengers area clean and paint. Upper passengers area clean and paint.<br />
30<br />
Confidential
Lights assembly repairs. Upper passengers area clean and paint.<br />
31<br />
Confidential
Level 03 access gate maintain. Upper passengers area clean and paint.<br />
Upper passengers area clean and paint. Upper passengers area clean and paint.<br />
32<br />
Confidential
Upper passengers area clean and paint. Upper passengers area clean and paint.<br />
33<br />
Confidential
Upper passengers area clean and paint. Upper passengers area clean and paint.<br />
03 Level press wash and paint. 03 Level press wash and paint.<br />
34<br />
Confidential
03 Level press wash and paint. 03 Level press wash and paint.<br />
35<br />
Confidential
Pilot house clean and paint. Instrumentation test for operation.<br />
Wiper assemblies test and repair. Remote steering stations test.<br />
36<br />
Confidential
Fire Alarm system service and certify. Test alarms signals.<br />
37<br />
Confidential
Outside canopy renew. Outside canopy repairs.<br />
38<br />
Confidential