Conservation Management Plan - Tamworth Borough Council
Conservation Management Plan - Tamworth Borough Council
Conservation Management Plan - Tamworth Borough Council
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Costed 10 year Action <strong>Plan</strong><br />
• Arrangements for annual inspection<br />
• Detailed list of items for inspection and maintenance for short and long term<br />
• Timing of work<br />
• Resources<br />
• Arrangements for Record Keeping<br />
2.5.4 Adoption, Implementation and Review<br />
It is recommended that the <strong>Conservation</strong> <strong>Plan</strong> is formally adopted by the Local <strong>Plan</strong>ning Authority as<br />
Supplementary <strong>Plan</strong>ning Guidance.<br />
It can also be used as the basis for a Heritage Partnership Agreement, drawn up with English Heritage to agree<br />
consents for routine maintenance.<br />
The plan should be reviewed in 5 years and the gazetteer periodically updated after significant new discoveries<br />
during works on site.<br />
A copy of this document and the gazetteer should be lodged in the castle archive along with the management and<br />
maintenance plan and records of past interventions.<br />
<strong>Tamworth</strong> <strong>Borough</strong> <strong>Council</strong> have commissioned this document as a sign of their commitment to the maintenance of<br />
the significance of the Castle for current and future residents of <strong>Tamworth</strong>.<br />
114 Part 2 www.marionblockley.co.uk <strong>Tamworth</strong> Castle <strong>Conservation</strong> <strong>Management</strong> <strong>Plan</strong>