- Page 1 and 2:
Tamworth Castle Conservation Manage
- Page 3 and 4:
Plate 20. Romantic Watercolour of T
- Page 5 and 6:
Conservation Policies (Vol. 1) Afte
- Page 7 and 8:
Polices for the Conservation of Tam
- Page 9 and 10:
F Engagement Policy F1: Re-engage w
- Page 11 and 12:
J Site Management Policy J 1: Meet
- Page 13 and 14:
Introduction The Brief The Tamworth
- Page 15 and 16:
This document takes account of the
- Page 17 and 18:
Cabinet members were given an eveni
- Page 19 and 20:
Understanding and Significance (Vol
- Page 21 and 22:
1.2 Historical Overview 1.2.1 Topog
- Page 23 and 24:
From the place name evidence the la
- Page 25 and 26:
An alternative theory is postulated
- Page 27 and 28:
A widely promulgated theory is that
- Page 29 and 30:
It formed the main approach to the
- Page 31 and 32:
Phase 5 The Tudor and Jacobean Cast
- Page 33 and 34:
Royal Visits We know that the enhan
- Page 35 and 36:
Holloway Lodge was built as a suita
- Page 37 and 38:
The modernist concrete bridge over
- Page 39 and 40:
The setting of the Castle, dominate
- Page 41 and 42:
However, on the accession of Edward
- Page 43 and 44:
Name Born Acquired castle Died Robe
- Page 45 and 46:
1.2.6 The Castle Collections The Ca
- Page 47 and 48:
1.3 Assessment of significance 1.3.
- Page 49 and 50:
the claim to power of new regime. A
- Page 51 and 52:
The Castle and the town There is no
- Page 53 and 54:
It is important to note that the el
- Page 55 and 56:
1.3.4.1 Significance of the Medieva
- Page 57 and 58:
1.3.5 Contemporary Significance Bec
- Page 59:
The horse chestnut tree at the foot
- Page 62 and 63:
Introduction The second part of the
- Page 64 and 65:
2.3 Issues affecting significance T
- Page 66 and 67:
Assessing the implications of chang
- Page 68 and 69:
2.3.4 Monitoring structural crackin
- Page 70 and 71:
Likewise the plaster ceilings of ro
- Page 72 and 73: 2.3.13 Collation of information on
- Page 74 and 75: 2.3.18 Presentation of the motte an
- Page 76 and 77: 2.3.22 Park Management/ protecting
- Page 78 and 79: understanding of the need to provid
- Page 80 and 81: 2.3.28 Ecological Potential The eco
- Page 82 and 83: It is clear that some items held wi
- Page 84 and 85: The current entrance up the Norman
- Page 86 and 87: The roof of the tower provides an e
- Page 88 and 89: This could be activated by blue too
- Page 90 and 91: 2.3.47 Systems to safeguard the col
- Page 92 and 93: Items on display are not stored in
- Page 94 and 95: 2.3.52 Documentation and Collection
- Page 96 and 97: Key risk areas: • Areas where cat
- Page 98 and 99: The Policies A principles and appro
- Page 100 and 101: Policy B3.6 An archive documenting
- Page 102 and 103: Policy C3 To observe effective regi
- Page 104 and 105: Policy C6 Understand and protect th
- Page 106 and 107: F Policies Engagement Policy F1: Re
- Page 108 and 109: Policy G12: Develop Tamworth Castle
- Page 110 and 111: Policy H4.7 A brief annual monitori
- Page 112 and 113: J Policies Site Management These po
- Page 114 and 115: Costed 10 year Action Plan • Arra
- Page 116 and 117: Sources Technical Baker, Shepherd,
- Page 118 and 119: Rahtz P and Meeson R 1992 An Anglo-
- Page 120 and 121: Appendix 1 120 Part 2 www.marionblo
- Page 124 and 125: Tamworth Castle Conservation Manage
- Page 126 and 127: Tamworth Castle Conservation Manage
- Page 128 and 129: Tamworth Castle Conservation Manage
- Page 130: Appendix 3 A map of that part of th