04.06.2013 Views

Corporate HRD and Skills Development for ... - Unesco-Unevoc

Corporate HRD and Skills Development for ... - Unesco-Unevoc

Corporate HRD and Skills Development for ... - Unesco-Unevoc

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(6) Expectations of Small- <strong>and</strong> Medium-Sized<br />

Enterprises (SME) Towards their Employees<br />

as a Means of Improving Vocational Training<br />

(System, Institutions, Teacher, Curriculum)<br />

Bima Hermastho<br />

<strong>HRD</strong> Indonesia<br />

Multi Bintang Indonesia’s (MBI) mission is to reach the first rank of BOEM (Brewery<br />

Operational Excellent Model) in Asia Pacific with the highest productivity <strong>and</strong> the lowest<br />

production cost PT. MBI has been applying the TPM (Total Productivity Management)<br />

programme. It consists of the following steps:<br />

– PM Pillar (Planned Maintenance): contribute to time loss reduction caused by such things<br />

as broken bottles, power cuts, shut down censors, belt changes, lager, loose bolt, etc.<br />

– AM Pillar (Autonomous Maintenance): to reduce time loss caused by the CILT (Cleaning,<br />

Inspection, Lubrication, <strong>and</strong> Tightening) process by searching the most practical,<br />

economical, <strong>and</strong> quickest way to improve it.<br />

– FI (Focus Improvement): effective treatment to improve productivity.<br />

– PQ (Progressive Quality): continually improving quality control.<br />

– ET (Education & Training): improve the operator/technician’s competence through<br />

training activities which are aimed at machinery specifications of MBI.<br />

– SHE (Safety, Health, <strong>and</strong> Environment): aimed at the development of work safety <strong>and</strong><br />

fitness (K3 / Kesehatan dan Keselamatan Kerja).<br />

The objectives of ET are:<br />

– To improve (old <strong>and</strong> new) the technician’s knowledge, skills, <strong>and</strong> concentration in relation<br />

to the maintenance & repair activities of all equipment installed in Multi Bintang<br />

Indonesia Mojokerto. It should also minimize the breakdown time <strong>and</strong> CILT time of all<br />

equipment installed to be used <strong>for</strong> the production process of MBI Mojokerto.<br />

– Set up within the factory neighborhood, controlled by the ENT Pillar, <strong>and</strong> managed by<br />

instructors from MBI Mojokerto.<br />

– Identifying the training module which refers to the frequency of breakdown time <strong>and</strong><br />

CILT time component.<br />

– Preparing the teaching materials <strong>and</strong> multimedia according to the chosen training module.<br />

44

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!