17.06.2013 Views

Wind Energy

Wind Energy

Wind Energy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

OffshOre #2 | The Magazine<br />

2<br />

Next generation vessels: Loading, Transporting<br />

and Installing offshore—all in one<br />

State of the art technology: the joint<br />

venture partners HOCHTIEF Construction<br />

and project and heavy lift<br />

cargo carrier Beluga Shipping are<br />

developing a new type of vessel enabling<br />

installation and maintenance<br />

of offshore facilities with overall<br />

heights of more than 120 meters in<br />

water depths of up to 50 meters.<br />

Power and mobility: 8,000 tons<br />

loading capacity, 1,700 tons crane<br />

capacity, 12 knots service speed—<br />

these special lifting vessels can be<br />

operated flexibly and around the<br />

clock on every single day of the year.<br />

The offshore market is booming,<br />

whereas capacities and adequate<br />

tonnage are short at the moment.<br />

But we have the answer: the first<br />

allround vessel of the next generation<br />

will be launched in 2012.<br />

www.beluga-hochtief-offshore.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!