Bard 5.0<br />

5 MW<br />

122 metres<br />

280 tons<br />

75 tons<br />

3<br />

1 nearshore<br />

80 Bard Offshore 1<br />

3,000 MW<br />

Offshore<br />

REpower<br />

Type 5 M<br />

Capacity 5 MW<br />

Rotor diameter 126 metres<br />

Weight of nacelle without rotor blades 380 tons<br />

Weight of three rotor blades 54 tons<br />

Installed turbines 17<br />

number of offshore turbines 2 Beatrice,<br />

6 Thornton Bank<br />

Planned for construction by end of 2009 6<br />

Offshore turbines<br />

84<br />

planned for 2010/2011<br />

Type Offshore and onshore<br />

REpower<br />

Type 6 M<br />

Capacity 6 MW<br />

Rotor diameter 126 metres<br />

Weight of nacelle without rotor blades 380 tons<br />

Weight of three rotor blades 54 tons<br />

Installed turbines 3 in WP Westre<br />

VESTAS<br />

Type V90<br />

Capacity 3 MW<br />

Rotor diameter 90 metres<br />

Weight of nacelle without rotor blades 70 tons<br />

Weight of three rotor blades 41 tons<br />

Installed turbines 500<br />

OffshOre #2 | The Magazine<br />

number of offshore turbines 126<br />

Planned for construction<br />

210<br />

by end of 2010/2011<br />

Type Offshore and onshore<br />

number of offshore turbines 0<br />

Planned for construction<br />

-<br />

by end of 2009<br />

Type Offshore and onshore Note: Offshore turbines with less than 3.0 MW<br />

output power have not been taken into consideration.<br />

At the time of going to press no data was<br />

available for the larger turbines planned by Bard<br />

and Clipper.<br />