27.06.2013 Views

Effiziente Prozesskopplung im Requirements ... - REConf 2009

Effiziente Prozesskopplung im Requirements ... - REConf 2009

Effiziente Prozesskopplung im Requirements ... - REConf 2009

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Lösungen in der Praxis - Bosch<br />

© <strong>2009</strong>. Vector Informatik GmbH. All rights reserved. Any distribution or copying is subject to prior written approval by Vector.<br />

Slide: 12<br />

Anforderungsmanagementprozess<br />

1. Colleting the requirements of all stakeholders<br />

Spec. (LH) / <strong>Requirements</strong> (unstructured)<br />

Spec. (LH)<br />

(unstructered)<br />

RIF<br />

Complete system<br />

FC2<br />

FC1<br />

Complete Spec.<br />

R<br />

R<br />

4. Development & Validation of products<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

2. Break down in component specifications<br />

5. Changehandling<br />

Component Spec. (FC1)<br />

R1‘<br />

R2‘<br />

R5‘<br />

R6‘<br />

ISSUE<br />

ISSUE<br />

2<br />

2<br />

ISSUE<br />

ISSUE<br />

1<br />

1<br />

R3‘<br />

R4‘<br />

R7‘<br />

R8‘<br />

ISSUE<br />

ISSUE<br />

2.1<br />

2.1<br />

ISSUE<br />

ISSUE<br />

1.1<br />

1.1<br />

ISSUE<br />

ISSUE<br />

1.1<br />

1.1<br />

Comp. Spec. (FC2)<br />

3. Identification & Commissioning of relevant changes

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!