Effiziente Prozesskopplung im Requirements ... - REConf 2009
Effiziente Prozesskopplung im Requirements ... - REConf 2009
Effiziente Prozesskopplung im Requirements ... - REConf 2009
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Lösungen in der Praxis - Bosch<br />
© <strong>2009</strong>. Vector Informatik GmbH. All rights reserved. Any distribution or copying is subject to prior written approval by Vector.<br />
Slide: 14<br />
Anforderungsmanagementprozess<br />
1. Colleting the requirements of all stakeholders<br />
Spec. (LH) / <strong>Requirements</strong> (unstructured)<br />
Spec. (LH)<br />
(unstructered)<br />
RIF<br />
Complete system<br />
FC2<br />
FC1<br />
Complete Spec.<br />
R<br />
R<br />
4. Development & Validation of products<br />
eASEE.hscm<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
2. Break down in component specifications<br />
5. Changehandling<br />
Component Spec. (FC1)<br />
R1‘<br />
R2‘<br />
R5‘<br />
R6‘<br />
ISSUE<br />
ISSUE<br />
2<br />
2<br />
ISSUE<br />
ISSUE<br />
1<br />
1<br />
R3‘<br />
R4‘<br />
R7‘<br />
R8‘<br />
ISSUE<br />
ISSUE<br />
2.1<br />
2.1<br />
ISSUE<br />
ISSUE<br />
1.1<br />
1.1<br />
ISSUE<br />
ISSUE<br />
1.1<br />
1.1<br />
eASEE.rqm<br />
Comp. Spec. (FC2)<br />
3. Identification & Commissioning of relevant changes<br />
eASEE.chm