27.06.2013 Views

Effiziente Prozesskopplung im Requirements ... - REConf 2009

Effiziente Prozesskopplung im Requirements ... - REConf 2009

Effiziente Prozesskopplung im Requirements ... - REConf 2009

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Lösungen in der Praxis - Bosch<br />

© <strong>2009</strong>. Vector Informatik GmbH. All rights reserved. Any distribution or copying is subject to prior written approval by Vector.<br />

Slide: 14<br />

Anforderungsmanagementprozess<br />

1. Colleting the requirements of all stakeholders<br />

Spec. (LH) / <strong>Requirements</strong> (unstructured)<br />

Spec. (LH)<br />

(unstructered)<br />

RIF<br />

Complete system<br />

FC2<br />

FC1<br />

Complete Spec.<br />

R<br />

R<br />

4. Development & Validation of products<br />

eASEE.hscm<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

2. Break down in component specifications<br />

5. Changehandling<br />

Component Spec. (FC1)<br />

R1‘<br />

R2‘<br />

R5‘<br />

R6‘<br />

ISSUE<br />

ISSUE<br />

2<br />

2<br />

ISSUE<br />

ISSUE<br />

1<br />

1<br />

R3‘<br />

R4‘<br />

R7‘<br />

R8‘<br />

ISSUE<br />

ISSUE<br />

2.1<br />

2.1<br />

ISSUE<br />

ISSUE<br />

1.1<br />

1.1<br />

ISSUE<br />

ISSUE<br />

1.1<br />

1.1<br />

eASEE.rqm<br />

Comp. Spec. (FC2)<br />

3. Identification & Commissioning of relevant changes<br />

eASEE.chm

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!