DM has prepared a flood relief plan outlining duties of various officers. M.S.Bhattacharya<br />

who was here today for deposing in a case, felt it was just the elementary framework and that<br />

what would happened during the flood could not be put down on paper. Amar Singh (my<br />

batch mate in Burdwan), he said, had sent off his paper on the district plan already and that he<br />

comes for an hour to office and pushes off. I wish I had that much time and could write a few<br />

articles!<br />

In the meeting on tubewell sinking with BDOs, EB got a bang for its 22 two only and DM<br />

clearly said that De, the former BDO, had not given it top priority and the rest must be sunk<br />

by 15 th . Trunk call came that CM, Power Minister and PU minister are coming on 14 th and<br />

leaving on 15 th night by train. They wanted us to give a vehicle for PU minister to go to W.<br />

Dinajpur so we told them this was impossible as CM and Power Min would be here and that<br />

DM Balurghat be asked to send one.<br />

BDOs wanted AROs’ services so that lists of loan defaulters could be drawn up without<br />

which Cattle Purchase and Fertiliser loans could not be distributed. Now some AROs are<br />

doing accounts in evacuee office and other stay put in town instead of the blocks. When DM<br />

asked SDO where AROs were, he said, “If, Sir, you dispose their services in other depts<br />

without telling me, I can’t say where they are.” DM:”You needn’t talk to me like that. It is<br />

your business to know my order when I pass one.” SDO shrivelled up! He was all “Sir, Sir”<br />

thenceforth. DM said he would see to it that AROs were placed in the blocks. TP Ghosh who<br />

ought to have sent a copy of the order to SDO looked a duffer and escaped by saying that it<br />

had been routed through OS.<br />

Bamangola and other Barind BDOs were told to finish sinking very fast as CM would be<br />

furious. But even CM can’t provide us with rigs to break through rocks!<br />

After the meeting, Kar and I went to N. Bhattacharya, AE PWD, for sanitation schemes. He<br />

could not give any without surveys but suggested we could budget 10 lakhs for drainage plus<br />

converting service latrines into sanitary ones @ 1000 for a family of 15 (750 such in EB). We<br />

left telling him not to tell SDO that we had come!<br />

Old <strong>Malda</strong> municipality sent its drainage schemes coming to Rs.2.5 lakhs.<br />

No rain in most blocks. It is a scandal how the relief office has not yet sent CARE the reports<br />

for May and June. Every time Ghosh is pressed, he refers to DM FCI not supplying reports<br />

and sits back. DM and ADM are not anxious either. Result is CARE will stop wheat<br />

shipments from 12 th . All that is needed is sending a man to the 5 godowns and get details!<br />

11.7.1972<br />

Work done<br />

District plan 9.30 a.m. to 12 noon<br />

DPC meeting 3-7 p.m.<br />

Museum 8 a.m.<br />

Information<br />

At 8 a.m. I went to the museum where 20 coolies took nearly an hour to put the Vishnu statue<br />

on its “vedi”. Weighs about 30 mds! Left instructions with Mali to thoroughly clean the mud<br />

so that a good photograph could be taken next Sunday.<br />

Bimal Chakravarty, Kar and I went to DM’s at 9.30 a.m. and there we re-did the total<br />

employment and costs. Eng. Bazar Municipality plans SDO gave us at 3.30 pm. So all was<br />

ready for completing the plan now.<br />

In the meeting only 5 MLAs out of 10 came—Shamsuddin Ahmed, Jakhilal Mondol, Niren<br />

Singh, Mohababul Haque and Bimal Das. We finished at 7 p.m. including a plan by SOTW<br />

for SC and ST. MLAs were very critical of RLI schemes not working and the EE merely<br />

asked his AE to answer! Costs for many projects were changed by EE PWD, so a lot of<br />

cancellation and correction will be needed. DM should have not stencilled so early and<br />

waited till after the meeting. Lack of experience. Tomorrow at 9 a.m. we meet again.