TRANSITIONAL SCHOOL SPACE REPORT - BoardDocs

TRANSITIONAL SCHOOL SPACE REPORT - BoardDocs

TRANSITIONAL SCHOOL SPACE REPORT - BoardDocs

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>TRANSITIONAL</strong><br />

<strong>SCHOOL</strong><br />

<strong>SPACE</strong><br />

<strong>REPORT</strong><br />

Volume III<br />

March 2006


Table of Contents<br />

Section(s): Title(s) Page #<br />

I. Introduction 4<br />

II. Methodology 8<br />

III. Data 9<br />

IV. Findings 12<br />

V. Recommendations 25<br />

VI. Summary & Conclusion 29<br />

VII. Projected/Estimated Cost 30<br />

-2-


Transitional School Space Committee Members:<br />

Chairperson: Raymond Healey<br />

Members: John Brophy<br />

Dennis Dengel<br />

Karen Lynch<br />

Michele Moloney<br />

Louis Rodriquez<br />

Thomas Rosato<br />

Jennifer Simmons<br />

-3-


I. Introduction<br />

“The object is not to see through one another,<br />

but to see one another through.”<br />

Objective: To identify the District’s schools experiencing a space problem<br />

and recommending a corrective action until such time as the<br />

District’s Master Plan is operationalized.<br />

Overview: This is the third report of an eight (8) member committee<br />

pertaining to transitional instructional space in the Wappingers<br />

Schools. The first report was submitted on October 18, 2003,<br />

and presented to the School Board at its December, 2003<br />

meeting. The second report was submitted November 12, 2004,<br />

and presented to the School Board at its December 2004<br />

meeting.<br />

The enclosed report is presented in seven sections as follows:<br />

(1) Introduction – overviews the contents of the report, presents the<br />

background and rationale for studying each target school’s classroom<br />

capacity to effectively accommodate students, outlines the<br />

establishment of the committee, and describes the tasks the committee<br />

was charged to complete.<br />

(2) Methodology – describes the manner and method pertinent information<br />

and/or data was compiled and analyzed.<br />

(3) Data - describes the Data collected.<br />

(Note: Also See 10/18/03 & 11/12/04 Reports)<br />

(4) Findings – presents the outcome and/or findings in relationship<br />

to the Superintendent’s charge to the committee.<br />

(5) Recommendations – presents the committee’s recommendation(s)<br />

to address the issue/problem of school overcrowding<br />

(6) Summary – summarizes the report findings and presents the<br />

committee’s strategies to address the problem.<br />

(7) Estimated cost.<br />

-4-


Tasks Given to the Committee:<br />

The Committee’s task(s) were twofold: First, to study instructional and<br />

general* school space and its capacity to effectively accommodate both<br />

present and projected (e.g., two to three years) student and staff enrollment.<br />

Second, to submit short term recommendation(s) to the Superintendent<br />

designed to insure that adequate and appropriate space is available to<br />

students and staff prior to the implementation of the District’s Master Plan.<br />

Background & Rationale for Study:<br />

In August 2003, Mr. Powell (Superintendent of Schools) directed Dr. Raymond<br />

Healey (Assistant Superintendent of Special Education & Student Services) to<br />

conduct a study of classroom and/or instructional space, including its capacity to<br />

accommodate enrollment, and to develop a short-term plan to address identified<br />

issues/problems.<br />

In response to Superintendent Powell’s direction, in August 2003, a six-member<br />

Transitional Instruction Committee was formed. Toward that end, a transitional<br />

short-term plan to identify high priority issues/problems was presented to the<br />

Superintendent in October 2003 and subsequently presented to the School Board<br />

in December 2003. The plan identified four high priority schools:<br />

(1) Van Wyck,<br />

(2) Gayhead,<br />

(3) Fishkill and<br />

(4) Vassar Road,<br />

along with corresponding recommendations and/or strategies to address their<br />

space problem.<br />

In response to the report, the School Department implemented the following<br />

initiatives during the 2004-05 school year:<br />

(1) Gayhead Elementary School: two modular (e.g., four classrooms) were<br />

installed in late August, along with a wireless computer system.<br />

(2) Fishkill Elementary School: computer lab was converted to a full-size<br />

classroom and a wireless computer system was installed for the entire<br />

school.<br />

(3) Van Wyck Junior High School: two modulars (e.g., four classrooms)<br />

were installed December.<br />

*cafeteria, library, auditorium, corridors, bathrooms, staircases, offices, conference rooms etc.<br />

-5-


As a follow-up to the aforementioned initiatives, a questionnaire measuring the<br />

level of satisfaction of key stakeholders (e.g., Fishkill & Gayhead) was sent to<br />

over 130 randomly selected parents and 18 staff in early November 2004.<br />

Feedback from the 42% of surveys received was highly positive.<br />

In September 2004, Mr. Powell again requested that the Transitional Space<br />

Committee conduct a second study of classroom/school space to determine:<br />

(1) the efficacy of the 2003-2004 school year recommendations,<br />

(2) present school conditions and if any, emerging high priority schools,<br />

(3) provide recommendations to address high priority schools.<br />

Mr. Powell recognized that the short timeframe for the submittal of the report did<br />

not lend itself to detailed research and analysis. However, anticipating the<br />

possibility that should the committee recommend temporary building construction<br />

(e.g., modulars) or building leasing, it was imperative that he receive the report at<br />

least seven months prior to the opening of school in September 2005. Such lead<br />

time would be required in order for the District to receive State Department of<br />

Education approval on an application of new construction.<br />

In response to Superintendent Powell’s direction in September 2004, a six<br />

member Transitional Instruction Team was reassembled. Toward that end, a<br />

second transitional short-term plan to identify high priority issues/problems was<br />

presented to the Superintendent in November 2004, and subsequently presented<br />

to the School Board the following month. The Plan identified four high priority<br />

schools:<br />

(1) Van Wyck Junior High School,<br />

(2) Fishkill Elementary School,<br />

(3) Roy C. Ketcham High School and<br />

(4) Orchard View Alternative High School.<br />

along with corresponding recommendations and/or strategies to address their<br />

space problem.<br />

-6-


In response to the report, the school District implemented the following during the<br />

2005-06 school year:<br />

1. (a) Roy C. Ketcham High School converted area previously occupied<br />

by Technology (e.g., moved to Laerdal Building) into a much<br />

needed multi-purpose instruction center/room,<br />

(b) reclaimed the school’s north wing that was previously dedicated<br />

to the Orchard View Alternative High School<br />

2. Orchard View Alternative High School was moved to spacious and<br />

attractive area of the Laerdal Building, thereby providing the school<br />

with its own separate facility. In addition, the school was put on an<br />

AM schedule which allowed staff to access evening graduate schools<br />

and, made the program more attractive to potential applicants from<br />

Roy C. Ketcham and John Jay High Schools.<br />

3. A 6 th Grade lunch period was added at Van Wyck Junior High School<br />

to alleviate cafeteria congestion.<br />

-7-


II. Methodology<br />

Methodology employed in this study did not reflect the rigor and comprehensive<br />

analysis of data that was undertaken in the reports submitted the past two years.<br />

However, information acquired from these studies when appropriate has been<br />

incorporated into this report. In addition, the following was employed in this study:<br />

• on-site visits/observations to targeted schools including interviews with<br />

key stakeholders<br />

• comparative analysis of 2005 BEDS Report with those of the past 10<br />

years<br />

• District housing growth and projected enrollment by area<br />

• review of 6/04 Long Range Facilities Plan<br />

• individual school enrollment since 1979-80 school year<br />

• inspection of Building Capacity Reports since 1997 concerning<br />

the size of each school, maximum number of students that could be<br />

accommodated and for what purposes building space is used<br />

• figures for employment of full-time teachers and other professionals<br />

taken from 1996 through 2005 BEDS Reports<br />

• data on the number of Teaching Assistants and Teacher Aides from<br />

1980, 1990, 2000, 2003, 2004 and 2005 was provided by the Office of<br />

Human Resources<br />

• the Committee met on three occasions to evaluate the data, recommend<br />

those schools most in need of space relief and brainstorm possible<br />

solutions<br />

• four schools had walk-through visits to verify some of the perceptives<br />

discussed in committee sessions on which schools need the most<br />

relief.<br />

• 10/7/05 WCSD K through 6 average class size report.<br />

• 12/05 WCSD Elementary School Utilization Chart.<br />

• 12/06 updated facts, enrollment projection 2006-2025.<br />

-8-


III. Data<br />

This section presents the results of selected data collected and is divided into<br />

subsections dealing with:<br />

1. Enrollment numbers<br />

2. Population trends<br />

3. Building utilization<br />

4. Miscellaneous notes from interviews<br />

For additional, more comprehensive information see 10/18/03 report,<br />

Section III, Data pages 9-33.<br />

Enrollment<br />

Year Enrollment<br />

1979 14,187<br />

1980 13,701<br />

1985 11,387<br />

1990 10,849<br />

1995 11,324<br />

2000 11,836<br />

2003 12,137<br />

2004 12,312<br />

2005 12,400<br />

Enrollment declined through the 1980’s to a low point in 1990-91 – then<br />

rebounded. The present enrollment is similar to that of 1983.<br />

Twenty-two years ago in February 1982, the District did a study on how to<br />

deal with declining student enrollment. At the time, the District’s enrollment<br />

was larger then it is now. Approximately a decade later, Kinry Road School<br />

was closed for three years (e.g., September 1991-September 1994).<br />

However, there has been a recent increase in enrollment. For example,<br />

the District has increased by 564 students or approximately 4.8% since<br />

September 2000, as reported in the BEDS data. The majority of the<br />

enrollment increase during this time period took place in three schools as<br />

follows:<br />

RCK<br />

Van Wyck<br />

John Jay<br />

-9-


The District’s enrollment grew by 88 students over the past year with eight of the<br />

fifteen schools reporting an increase. It is important to note that two schools,<br />

Van Wyck Junior High (minus -9) and Gayhead Elementary (minus -7), although<br />

still operating above enrollment capacity, experienced a decline for the first time<br />

in several years. Schools showing enrollment increases in descending order<br />

are:<br />

1. Orchard View - 12 students or 30.0%<br />

2. Brinckerhoff - 29 students or 5.0%<br />

3. Fishkill - 20 students or 4.4%<br />

4. Wappingers Jr. High - 40 students or 4.2%<br />

5. RCK - 70 students or 3.6%<br />

6. Fishkill Plains - 23 students or 3.6%.<br />

7. John Jay - 67 students or 3.4%<br />

8. Vassar - 5 students or 0.1%<br />

It is worthy to note that while the secondary schools collectively gained 185<br />

students since last year, the 10 elementary schools overall lost 97 students.<br />

Toward that end, the schools with the greatest enrollment decreases were<br />

Myers Corners (- 92), Oak Grove ( -21), Evans (-21), Sheafe (-14), Kinry (-14).<br />

Population Growth/Trends:<br />

(For details see October 2005 Facts Enrollment Projection Report)<br />

• Presently over 30 new housing developments have commenced or come<br />

on line in the District.<br />

• Growth is concentrated in the Fishkill/East Fishkill corridor.<br />

• Average size households declined in the District (see Facts Report)<br />

and the number of school age children per household declined, which<br />

probably accounts for enrollment increase for the past decade<br />

concentrated in the secondary schools.<br />

-10-


Building Utilization:<br />

The list below shows the school/building capacity as indicated in 1999, the<br />

September 2005 enrollment, the % of change for each school the past four<br />

years and the % of building capacity presently being used.<br />

Pupil Sept. 2005 % of % of Change<br />

Building<br />

Capacity Enrollment Capacity Past 4 Years<br />

Brinckerhoff 651 616 94.6 + 9.8<br />

Evans 483 342 70.8 -10.0<br />

Gayhead 1,043 1,036 99.3 - 7.4<br />

Fishkill 510 481 94.3 - 0.2<br />

Fishkill Plains 670 634 94.6 + 2.0<br />

Myers Corners 1,072 849 79.1 0<br />

Oak Grove 602 473 78.5 - 4.8<br />

Kinry Road 564 451 80.0 - 6.6<br />

Sheafe Road 649 556 85.6 - 3.1<br />

Vassar Road 493 459 93.1 + 4.0<br />

Van Wyck JHS 1,427 1,444 101.1 + 4.9<br />

Wappingers JHS 775 1,001 129.1 + 3.2<br />

Roy C. Ketcham HS 1,556 1,933 124.2 +18.6<br />

John Jay HS 1,863 2,073 111.2 + 8.0<br />

Orchard View AHS ------- 52 + 40.3<br />

Note:<br />

• The capacity estimates for John Jay and Roy C. Ketcham High Schools<br />

do not reflect the space gained when the science wings were opened in<br />

the Spring of 2003 or the RCK multi-purpose instructional room<br />

constructed in 2005-06 as a result of the relocation of the Technology<br />

offices to 167 Myers Corners Road. The Science wings were only for<br />

Science and as such had a marginal effect relative to gaining<br />

instructional space for other disciplines.<br />

• Except for Orchard View all secondary schools have more students then<br />

their indicated capacity.<br />

Student enrollment in and of itself is not a strong indicator of actual building<br />

congestion. Interaction of student enrollment, building usage (e.g., Special<br />

Classes/Services) and staff is a much stronger indicator.<br />

-11-


Introduction:<br />

IV. Findings<br />

The following section summarizes the present space conditions in high priority<br />

schools, examines the factors contributing to such conditions and presents<br />

outcome and/or findings of an interactive analyses of these factors.<br />

Present Space Conditions:<br />

As depicted in the previous section, as of January 1, 2006, there currently exists<br />

to varying degrees an “overcrowding” in select Wappingers Schools. While the<br />

implementation the past two school years of<br />

(1.) modular units at Van Wyck Junior High and Gayhead Elementary<br />

Schools,<br />

(2.) wireless computer systems at Gayhead and Fishkill Elementary<br />

Schools,<br />

(3.) construction of a large multi-purpose instructional room and cafeteria<br />

expansion at Roy C. Ketcham High School, and<br />

(4.) relocation of Orchard View Alternative High School and the<br />

Department of Technology to 167 Myers Corners Road,<br />

have significantly alleviated instructional/classroom space at these schools.<br />

Further it would appear that Gayhead, the District’s largest elementary school,<br />

enrollment has stabilized (see previous section). Having said that, however<br />

problems of overcrowding continue to persist in select schools. To understand<br />

why such conditions exist, it is necessary to analyze the interaction of the<br />

following variables and their influence on classroom space.<br />

Student Enrollment:<br />

Wappingers Central School District’s student enrollment has modulated over the<br />

past 25 years from a high of 14,200+ in the late 70’s to a low of 10,800 in the<br />

early 90’s to today’s 12,400. Thus, if today’s student enrollment is almost 1,800<br />

less than it was 25 years ago, why is the District experiencing a classroom<br />

space problem? The following sections address this anomaly.<br />

Special Population Growth:<br />

Beginning in the mid-to-late 80’s when Wappingers enrollment was approaching<br />

its ebb (10,800) and classroom space was readily available, the District initiated<br />

actions that resulted in several specialized programs being placed in the<br />

schools to meet the educational, social and emotional needs of a growing<br />

diverse population of learners. Such actions included moving art and music into<br />

full-size classes, and the implementation of new programs such as Primary<br />

Mental Health, Intensive and Remedial Reading and Study Skills.<br />

-12-


Furthermore, additional “special population programs” continued through the<br />

90’s, and right up to the present day (e.g., computer labs, LIT, 504,<br />

Developmental Learning Specialist, Enrichment, AIS, Special Education<br />

Coordinators’ offices, computer instruction support, discipline rooms, etc.).<br />

As these programs moved from paper to reality, a corresponding need for<br />

additional space for support staff, as well as conference rooms, also took place.<br />

Staff Increase:<br />

Since SY 1979-1980, student enrollment has decreased approximately 1,800<br />

students or about 20%, but instructional staff * has increased by an estimated<br />

33%. For example, Van Wyck Junior High School had a student enrollment 35<br />

years ago of 1,200 and a staff of 70. Today, that same school has an<br />

enrollment of 1,444 students (20% increase) and a staff of 125 (78% increase).<br />

Moreover, since 1980 Teaching Assistants/Teacher Aides, which is included in<br />

the aforementioned instructional staff figure, has increased district wide from 61<br />

to 225 or 270%.<br />

Evolving Educational Environment:<br />

School district actions to initiate new programs and services for special<br />

populations were influenced by Legislation and advancements in medical<br />

technology. However, when the overall student enrollment began to increase in<br />

the late 1990’s, the instructional room that existed 15 years prior, was no longer<br />

available. Thus, the mid 80’s movement toward specialized instruction<br />

intersected with other factors that, when combined, resulted in a significant<br />

demand for school space. For example, during this timeframe (mid 80’s to<br />

present day) the District witnessed an increase in the number of low birth weight<br />

infants and children who survived birth trauma. Similarly, there was an increase<br />

in the number of students who required ambulatory assistance (e.g., walkers,<br />

wheelchairs, braces). Moreover, there was an increase in the number of<br />

students born into low-income families (Title I), sometimes having had<br />

inadequate prenatal care and nutrition. These students often do not display<br />

appropriate developmental readiness for learning. The number of cocaine or<br />

“crack” babies was growing, as is the number of infants born who suffer the<br />

effects of Fetal Alcohol Syndrome. Consequently, these societal phenomena<br />

necessitate that the District service many special populations that present<br />

educational challenges including the need for classroom space.<br />

In addition to these students with complex health care needs, the membership<br />

of the District was becoming increasingly diverse due to socio-cultural factors.<br />

The School District has over the past 15 years seen an increase in the number<br />

of immigrants from other nations requiring ESL (English as a Second Language)<br />

services. Couple a language barrier with special learning needs, and the<br />

resultant student has a spectrum of issues to address, all of which impacts<br />

instructional space, programs, services, and correspondingly, office’s and<br />

conference areas.<br />

(* A high % of increase is in Special Services) -13-


Finally, since SY 2000-2001 the District has returned over sixty Special<br />

Education students from BOCES and Private Day School placements. While<br />

the return of these high cost students has saved the District a significant amount<br />

of money previously allotted for tuitions and transportation, they have also<br />

contributed to the increase in demand of classroom space and additionally<br />

staffing needs. Consequently, the aforementioned factors, when combined,<br />

dramatically changed the “landscape” relative to available classroom space.<br />

Capital Improvement:<br />

The last new school built in Wappingers was in the late 60‘s. With the exception<br />

of new high school science wings completed in SY 2002-2003,<br />

the last major renovations/additions to our schools was in the early 1970’s.<br />

Legislative Impact:<br />

In the past twenty-five years, Federal and State Legislative initiatives and<br />

judicial rulings have impacted classroom space availability. Changes have<br />

occurred particularly among special populations in the age range and severity<br />

of service, the environments which services must be provided, and the<br />

supplemental supports provided to students. For example, the impact of<br />

No Child Left Behind (NCLB) continues to reverberate in school budgets<br />

and delivery practices throughout the country.<br />

How Does Student Behavior & Violence Impact Classroom Space:<br />

Problems of disruptive and violent youth behavior are a national concern<br />

affecting every school district. Increasing expulsion rates, suspension rates,<br />

and crimes of violence adjudicated before Juvenile Court are reflections of these<br />

charges. Research evidence shows that overcrowded school areas (e.g.,<br />

cafeteria, library, classrooms) often times enhances the possibility of disruptive<br />

and/or violent student behavior. Attending to the students at risk<br />

for such behavior has increased the needs for support from student services<br />

personnel (e.g., social worker, psychologist, guidance counselor, in-house<br />

suspension) and concomitantly space.<br />

Technology Impact:<br />

Wappingers Central School District students need access to computers whether<br />

for general use, adapted access, speech synthesis, or written output,<br />

accessibility is critical. Computer labs, like support services and workstations,<br />

consume school space.<br />

-14-


Medical Technology:<br />

In recent years, advances in medical technology have enabled children with<br />

medical complications to survive birth trauma and post-traumatic periods and<br />

present ongoing needs for intensive health care services.<br />

This phenomenon not only impacts the number of students identified for early<br />

Intervention and preschool programs, but also raises issues for school staff in<br />

managing these complex health care needs in the school setting. Such<br />

complex health care procedures present challenging situations for<br />

administrators, teachers, teaching assistants, and other school personnel.<br />

Serving this population of students requires allocation of appropriate resources,<br />

staff training needs and school space.<br />

While in the past many medically fragile students with complex health care<br />

needs have traditionally been concentrated in out-of-district programs, there is<br />

an increasing trend to have these students included in our schools in both<br />

general and special education classrooms, particularly students with severe<br />

disabilities. These children often present medical needs that are more intense<br />

than those traditionally dealt with, and may include children dependent on<br />

medical technology, such as tube feeding, ventilation, suctioning catheterization,<br />

air quality management and audible technology<br />

New Housing:<br />

The recent FACTS Report (1/28/2006) Findings reinforces the accelerating<br />

enrollment growth patterns that were presented to the School Board by the<br />

Director of Administration. With over thirty new housing developments having<br />

commenced or coming-on-line in the District and with the five to seven year<br />

projected occupancy build-outs the report indicates continued enrollment growth<br />

over the next several years especially at the secondary level. In addition, to the<br />

high schools the impact of new housing in the schools located in the Fishkill and<br />

East Fishkill corridor will be most pronounced.<br />

-15-


Synthesis of Findings:<br />

While the District witnessed an approximate 4% increase in student enrollment<br />

over the past four years, seven (all elementary level) of our schools decreased<br />

in enrollment during this time frame. The schools with the greatest increase<br />

were:<br />

(1.) Orchard View Alternative High School<br />

(2.) Roy C. Ketcham High School<br />

(3.) Brinckerhoff Elementary School<br />

(4.) John Jay High School<br />

Conversely, the schools with the sharpest decrease were:<br />

(1.) Evans Elementary School<br />

(2.) Kinry Road Elementary School<br />

(3.) Oak Grove Elementary School<br />

However, when taking into account the interaction of student and staff<br />

enrollment , grade alignment, class sizes, special populations, school capacity,<br />

medical technology, new hiring, and building configuration, a clearer “picture”<br />

emerges that explains why certain schools continue to experience a space<br />

shortage.<br />

The number of ways in which space is used in all schools has increased<br />

dramatically since the mid 90’s. This has resulted in classroom space being<br />

reduced or subdivided, storage space reduced, and a juggling act for<br />

administrators trying to accommodate the need for classroom space, small<br />

group instruction space, therapy space, testing space, office space and<br />

conference rooms.<br />

Three trends have combined to produce space shortages in buildings:<br />

First, over a twenty year period, enrollment has declined, and then<br />

increased again. While enrollment was on the decline, classroom<br />

space was dedicated to programs that were previously un-housed<br />

(e.g., Art & Music classes on rolling carts) or did not exist (computer<br />

labs, Bridge, AIS, etc.).<br />

-16-


Secondly, the buildings today have much larger staffs to provide more<br />

mandated specialized programs, services and accommodations within an<br />

inclusive setting.<br />

Third, there are often larger cohorts at one particular grade level in one<br />

building. In a small school, where the number of classrooms are fixed,<br />

this can result in students being sent out of their home schools for a year;<br />

and this practice has created imbalances in class size. Thus, at different<br />

levels over the past twenty years, the District has had to redistrict<br />

students at various grade levels and schools to accommodate population<br />

shifts and classroom availability.<br />

More importantly, there are considerably more teachers, professionals and<br />

paraprofessionals working in each building than twenty years ago and in a<br />

sense, competing for the available space.<br />

For example, each person who works in a building: lunch monitor, teacher aide,<br />

hall monitor, instructional music teacher, police officer, etc., needs to have a<br />

space to safely hang their coats and belongings.<br />

Staff in positions, where confidentiality and legality are issues, must have a<br />

private area in which to communicate with students, parents, other staff, and<br />

outside agencies, as well as a secure area in which to keep notes, records and<br />

documentation private and confidential.<br />

There is little flexibility in where to put classes, staff, and storage in some<br />

schools.<br />

An analysis of the interaction of the aforementioned factors in the past two years<br />

resulted in the following schools being identified as being high priority relative to<br />

classroom space needs:<br />

SY 03-04:<br />

SY 04-05:<br />

1. Van Wyck Junior High School<br />

2. Fishkill Elementary School<br />

3. Gayhead Elementary School<br />

4. Vassar Road Elementary School<br />

1. Van Wyck Junior High School<br />

2. Roy C. Ketcham High School<br />

3. Fishkill Plains Elementary School<br />

4. Orchard View Alternative High School<br />

-17-


In response to the above, the District undertook several initiatives designed to<br />

alleviate on a temporary basis (e.g., two to three years) space needs at five of<br />

the seven aforementioned schools.<br />

Toward that end, two modular units (e.g., four classrooms) were installed in<br />

August 2004) at the Gayhead Elementary School and two modular units (four<br />

classrooms) were also installed in January 2005 at Van Wyck Junior High<br />

School. In additional a wireless computer system was put in place in the fall of<br />

2005 at Fishkill and Gayhead Elementary Schools, thereby allowing the<br />

computer lab to be converted into instructional area (e.g., Special Education<br />

classroom Fishkill). In addition, the relocation of Orchard View Alternative High<br />

School and TSS from Roy C. Ketcham High School to 167 Myers Corners Road<br />

benefited all three. For example, RCK not only reclaimed the north wing<br />

previously occupied by Orchard View, but was able to convert the old TSS area<br />

into a large multi-purpose instructional classroom similar to one in use at John<br />

Jay. Finally, the upgrade/modification to the RCK cafeteria this past year was<br />

highly beneficial.<br />

Therefore, with respect to school/instructional space needs as of January 2006,<br />

an analysis of the interaction of key factors indicates that four schools have high<br />

priority building space needs as follows:<br />

Name of School:<br />

1. Roy C. Ketcham High School<br />

2. John Jay High School<br />

3. Fishkill Elementary School<br />

4. Van Wyck Junior High School<br />

-18-


Rationale for High Priority Schools:<br />

1. Roy C. Ketcham High School<br />

Roy C. Ketcham High School is viewed as the District’s highest priority school<br />

with respect to space needs. Although several highly beneficial initiatives<br />

(e.g., Science Wing, cafeteria renovation, relocation of TSS and Orchard View,<br />

new multi-purpose instructional room, etc.) have been taken over the past three<br />

years to address space needs, the school still ranks as the highest priority need<br />

among the District’s schools.<br />

Roy C. Ketcham, the secondary ESL Center, is the Districts fastest growing<br />

school having increased in enrollment by 18.6% over the past four years.<br />

Further, it is presently at 124.2% of building capacity prior to the science wings<br />

being built. The resultant is the school is experiencing congestion and<br />

overcrowding in several common locations (e.g., hallways, staircases, offices,<br />

library, bathrooms) as well as in need of additional classrooms and/or<br />

instructional space. For example, there are<br />

(1.) no breakout rooms available for small group instruction and<br />

adaptive testing,<br />

(2.) insufficient room for Resource Room Programs,<br />

(3.) BOCES hearing impaired teacher shares the same space (at the<br />

same time) as the District’s Speech & Occupational Therapists,<br />

(4.) Basic Help Program room is undersized,<br />

(5.) Social Worker shares office with support staff<br />

Thus, due to enrollment growth, and most importantly projected enrollment<br />

growth (see January 2006 FACTS Report) over the next five to seven years,<br />

there is a need to create more instructional space, while concomitantly<br />

effectively dealing with a diversified population that requires more specialized<br />

services (e.g., Special Education, AIS, Substance Abuse Counselor, Guidance,<br />

Social Work, In-school Suspension, ESL Interpreters for family members, etc.).<br />

Conversely, the school is not without potential resources. For example, a<br />

sizeable portion of the “basement area” directly beneath the science labs, is<br />

presently being used for storage. This area, the Committee believes, if modified<br />

in conjunction with reconfiguration of select offices/classes can provide the<br />

school with at least two additional general education classrooms by September<br />

2006.<br />

-19-


In summary, RCK despite the recent aforementioned additions and<br />

modifications rates as a high need school due to the following interrelated<br />

factors:<br />

Conclusion:<br />

(1.) Student enrollment as listed by the BEDS Report, increased this<br />

past year by 79. Further, since SY 2001-2002 enrollments has<br />

increased by 303 students or 18.6%<br />

(2.) The past five years has witnessed an increase in Special Programs<br />

including AIS, Special Education, Guidance, Social Work and<br />

In-house Suspension, Technology, ESL, Substance Abuse<br />

Counseling.<br />

(3.) Hallways, library, corridors and staircases are congested and could<br />

lead to student dissonance and disruptive behaviors.<br />

(4.) The school services a highly diversified student body that includes<br />

ESL, economically disadvantaged, students residing in group<br />

homes, as well as students residing in affluent neighborhoods.<br />

(5.) Inadequate conference and/or meeting rooms (e.g., testing, etc.).<br />

RCK is a school whose diversified student enrollment has increased by close to<br />

19% over the past four years and 26% over the past eight years. It is a school<br />

where common areas (e.g., auditorium, stairs, hallways, etc.) are congested and<br />

a potential contributor to disruptive behavior. RCK is also a school with<br />

potential classroom space that presently is underused as a storage area. Thus,<br />

with modifications and select classroom realignment, it would be possible to<br />

create at least two additional full size classrooms by September 2006.<br />

-20-


2. Van Wyck Junior High School<br />

The Van Wyck Junior High School remains a high priority school primarily due<br />

to infrastructure issues and/or concerns. While student over-enrollment<br />

continues to be a concern, especially congestion in the school’s common areas<br />

(e.g., cafeteria, hallway, staircases, library, etc.). The installation of classroom<br />

modulars and the added 6 th Grade lunch period, combined with a slight<br />

decrease in enrollment has alleviated pressure and/or congestion on<br />

instructional and common (e.g., cafeteria) areas.<br />

Briefly stated Van Wyck was built forty years ago for about 1,000 students and<br />

70 or so faculty. Today, the school services 1,444 students and around 125<br />

staff and although as stated classroom instructional space is in reasonably good<br />

shape, the school’s infrastructure (e.g., mechanical systems, utilities, water<br />

supply, septic system, HVAC/air exchange) are under great stress. Moreover<br />

given the most recent FACTS Report that projects a enrollment growth in the<br />

East Fishkill corridor for the next five to seven years; the “situation” at Van Wyck<br />

becomes even more problematic.<br />

* School is operating at 101% student capacity.<br />

-21-


Factors to consider regarding the over-enrollment at Van Wyck are as follows:<br />

• Building design and common areas – This facility, its mechanical systems<br />

and utilities were designed and built in 1965 to accommodate1,000<br />

occupants. In 1968 an addition was added without upgrade to the<br />

mechanical systems and utilities. We are currently operating with a student<br />

population of 1,444 plus staff.<br />

• Water supply – Water for all uses, including potable water, is supplied by<br />

one District owned well. At the beginning of the 2004/2005 school year this<br />

well failed requiring the District to provide tanker truck supplied water for an<br />

extended period of time. The well capacity was restored using a hydro surge<br />

process; however, it is currently supplying water at a significantly greater<br />

rate then its designed capacity.<br />

• Septic system – This facility is served by an in-ground septic system<br />

designed in 1965 to accommodate the flow rate using 1,000 occupants as<br />

its design parameters. An increase of more than 50% of flow stresses the<br />

system and makes it vulnerable to failure. When flow rates for the current<br />

occupancy are calculated the District may also be required to maintain a<br />

State Pollution Discharge Elimination System (SPDES) permit. The<br />

requirements for the SPDES permit may in turn require upgrade to the<br />

system and/or the installation of a sewer water treatment plant.<br />

• HVAC/Air exchange – Over pollution of this facility places considerable<br />

stress on the design parameters of the HVAC systems and its ability to<br />

supply fresh outside air.<br />

-22-


3. John Jay High School<br />

Although space needs are not as acute as RCK, John Jay High School was<br />

seen by the committee as a school experiencing congestion and/or<br />

overcrowding in common areas, most notably its cafeteria, hallways and<br />

stairways. Moreover, while Jay’s 8% enrollment increase over the past four<br />

years has not matched that of RCK, it nevertheless represents a significant<br />

growth. Further, given the most recent FACTS Report, it is projected Jay will<br />

experience enrollment increase for the next five to eight years. Taken into<br />

account that the school is presently experiencing 111% capacity (granted this<br />

does not take into account the new science wing). However, the science wing<br />

does not alleviate problems in common areas, such as cafeteria, corridors,<br />

hallways, library and bathrooms; nor does it impact other instruction areas<br />

outside the wing, which are also experiencing some overcrowding. For example<br />

an on-site inspection showed the following:<br />

Conclusion:<br />

• Cafeteria is inadequate and highly congested when in use,<br />

particularly when students are entering and leaving the<br />

lunch counter section.<br />

• Library is inadequate & congested when in use.<br />

• Hallways & staircases during periods &/or lunch transition are<br />

congested, especially directly outside the gym/cafeteria area.<br />

• Offices for support staff (e.g., social worker, speech, OT, PT) and<br />

remedial staff are inadequate. Note: many therapies share the<br />

same office and instructional space.<br />

• Lack of break-out rooms for small group instructions & adaptive<br />

testing.<br />

John Jay a school with over 2,000 students will witness enrollment growth for<br />

the next five to eight years. Presently, the main concern is congestion in<br />

common areas, most notably its cafeteria. However, as enrollment increases<br />

instructional areas outside the science wing will become more congested.<br />

-23-


4. Fishkill Elementary School<br />

Fishkill Elementary School has an enrollment of 481 students, which translates<br />

to 94.3% of building capacity. It is a school that experienced a relatively modest<br />

increase of 4% in student enrollment over the past year, but virtually no change<br />

over the past four years. So why then is Fishkill Elementary seen as a needy<br />

school? The answer lies in its building configuration, which makes flexibility<br />

and/or adaptability to enrollment variances difficult. A problem which has<br />

resulted over the past three years in students being redistricted due to class<br />

overage. Further, the school woefully lacks space for offices, conference rooms<br />

and support programs.<br />

Thus, while Fishkill has benefited by the installation of a wireless communication<br />

system lab, it is still In need of reclaiming additional general education<br />

classrooms, increasing space for support services (PMHP, psychologist,<br />

reading) as well as conference area for breakout & testing.<br />

Conclusion:<br />

Fishkill Elementary School continues to experience congestion in common area<br />

locations and a shortage of separate instructional classroom space as follows:<br />

• Kindergarten rooms are undersized (e.g., about 4/5 of standard<br />

classroom).<br />

• Grade 1 classrooms have class-size reduction TA, because of<br />

high numbers 22 – 27 – 27<br />

• Grade 4 is relatively high 27 – 28 – 28 – 26<br />

• Lunch periods are staggered, starting at 11:10 a. m and lasting<br />

until 2:00 p. m. due to the cafeteria being unable to handle the<br />

volume of students<br />

• All assemblies are staggered because the entire school cannot<br />

be in the cafeteria at the same time.<br />

• OT, PT, and part-time Resource Room Teacher share a room.<br />

• AIS shares room with Support Services.<br />

• Social Worker, DLS, Assistant Coordinator & Psychologist share<br />

one room.<br />

-24-


I. Roy C. Ketcham High School<br />

V. Recommendations<br />

The following actions would create additional full-sized general education<br />

classrooms for SY 2006-07.<br />

• Modify & convert the basement area into three (3) rooms and relocate<br />

rooms 233 (Wood CAD), 229 (DDP Computers) and a small adjacent<br />

office to that area. The third room would be occupied after-school hours<br />

by the boys’ wrestling team. Net gain is two (2) full size classrooms.<br />

• Partition room 239 into two (2) resource rooms.<br />

• Vacate room 129 (now a learning center) and transfer the program to the<br />

present faculty room as an after-school voluntary support service. Net<br />

gain is one (1) full-sized classroom.<br />

• Install a door to room 233 and construct a dividing wall to create two (2)<br />

separate and independent instructional rooms.<br />

• Present faculty room 287 (sparsely used) be relocated downstairs to<br />

tunnel area (e.g., on the right as you approach from the lobby, presently<br />

used as storage for old &/or damaged desks, chairs, etc.). Room 287<br />

then becomes available as a small in-restriction room.<br />

• Expand doorway to weight room in basement area by installing 36” x 72”<br />

window to allow natural light to enter room.<br />

• Clean up TSS storage room (e.g., adjacent assistant principal’s office) by<br />

removing damaged and/or outdated computers and other non-usable<br />

equipment. Insert shelving and use as storage area for both TSS and<br />

Physical Education.<br />

-25-


Campus Plan<br />

A campus and/or extended day scheduling model is recommended to<br />

reduce student traffic and/or congestion in common school areas such as the<br />

cafeteria, corridors, and stairwells. This would be recommended for select<br />

juniors and seniors on a flex period day (e.g., 7:00 a. m. to 5:00 p. m.) as<br />

follows:<br />

(a.) Extend an eight (8) period day to twelve (12) periods as an “opt in”<br />

for Juniors and Seniors.<br />

(b.) extended school day courses and/or subjects could include<br />

PIG/Economics, English, Art, etc., which are offered more than<br />

once at different times in the day to allow options for students<br />

participating in after school activities.<br />

(c.) Teachers from Departments involved in the extended school day<br />

would be given the option of a flex schedule. For example, in the Art<br />

Department, three teachers could remain on the regular day<br />

schedule (e.g., 7:00 a. m. to 2:00 p. m.) while one could be on a<br />

9:00 a. m. to 4:00 p. m. schedule, another on a 10:00 a. m. to<br />

5:00 p. m. schedule.<br />

(d.) While many students would transport themselves transportation<br />

services would be available at 4:00 p. m. and 5:00 p. m.<br />

(e.) Students would have the option of:<br />

(1.) leaving the school &/or Campus and returning latter to take<br />

a class or classes or<br />

(2.) remaining in school and be assigned to Study Hall until<br />

their class is in session.<br />

-26-


IV. Van Wyck Junior High School<br />

Van Wyck is a school whose common areas are highly congested (e.g.,<br />

cafeteria) and whose infrastructure is under considerable stress. Thus, while<br />

instructional space concerns have been somewhat alleviated due to:<br />

Note:<br />

(1.) The recent installation of two (2) modular units.<br />

(2.) The addition of a 6 th grade lunch period.<br />

(3.) The leveling off of enrollment.<br />

The committee recommends the following to address the aforementioned<br />

immediate infrastructure needs by:<br />

(a.)Replace the HVAC Unit Ventilators with proper sized units<br />

and/or upper grades for rooms 101,129, 206,220, 231<br />

Technology II and the library.<br />

(b.)Repaint all surfaces using “Summer-help”<br />

The Committee gave serious consideration to recommend a plan which would<br />

reduce the schools SY 2006-07 enrollment by approximately 120 students and<br />

10 staff by redirecting/redistricting Fishkill Plains students to Myers Corners.<br />

Such a scenario would involve redirecting Evans and Fishkill 6 th grade students<br />

from Myers to Evans and thereby freeing up space to accept Fishkill Plains<br />

students. Due to enrollment decrease, the relocation of its Special Education<br />

self-contained classroom and Special Education’s area office, it is possible to<br />

create enough space at Evans to house both its and Fishkill’s 6 th grade classes<br />

for SY 06-07. However, the committee ruled out such a scenario on the basis it<br />

would cause too much disruption to students’ schedules.<br />

-29-


II. Fishkill Elementary School<br />

The only viable short term remedy the committee saw to alleviate the present<br />

congestion at Fishkill Elementary school is as follows:<br />

• Relocate Fishkill’s Special Education Self-contained classroom to<br />

Evans Elementary School<br />

III. John Jay High School<br />

The following actions would create additional two and one-half (2 ½) full size<br />

classrooms for SY 2006-07<br />

• Relocate the Coordinator of Art and Music (room) to Evans<br />

Elementary School and convert this room into a general education<br />

instructional classroom.<br />

• Convert Room 135 and 102 to general education classrooms.<br />

Presently Rooms 135 and 133 are used as the Math Department<br />

faculty area. Thus, the Math faculty will be assigned only Room<br />

133. Furthermore, Rooms 102 and 100 are presently used as the<br />

English Department faculty area. Thus, the English faculty will be<br />

assigned only Room 100.<br />

• Math and English Faculty Rooms turn into two (2) classrooms.<br />

• Convert half-size adjacent rooms 189 and 190 to a full size<br />

instructional classroom by eliminating wall. Music string lessons<br />

being provided in room 190 (5 & 8 periods) relocate to auditorium.<br />

Adult monitors now in Room 189 would be relocated to a site<br />

identified by the principal. (note recommendation: defer to next<br />

year due to anticipated high construction costs.<br />

• Relocate Project SEA from full size classroom 242 to half-size<br />

room 241. SEA would remain in full size room 240 and thereby<br />

go from 2 full size classrooms to ½ full-size classrooms. Thus,<br />

room 242 would then be used as a full-size instructional room<br />

resulting in a ½ room instructional gain in general education.<br />

• To relieve cafeteria congestion consider releasing students by<br />

table during lunch periods, 3 to 5 minute prior to the change of<br />

period bell.<br />

-27-


• To relieve cafeteria congestion consider implementing a food court<br />

style system with various stations devoted to a theme such as the<br />

Italian line (e.g., pizza, meatball wedges, pasta) or a line for a Deli<br />

bar etc. Students place the order on their line of choice, pay and<br />

the food is assembled and served by the cashier/server<br />

• Enhance coordination between administration and faculty relative<br />

to visibility in hallways and moving students along between<br />

periods (e.g., not tolerating any loitering or stopping to talk, etc.).<br />

• Using campus model (see RCK for details).<br />

-28-


VI. Summary & Conclusion<br />

The Committee’s review of instructional and common area space shows that<br />

three schools, Roy C. Ketcham High School, Fishkill Elementary School and<br />

John Jay High School require corrective actions to address overcrowding.<br />

The most pressing area(s) of concern are the common areas, such as cafeteria,<br />

corridors, stairwells, auditoriums, restrooms and special support programs. In<br />

addition a fourth school, Van Wyck Junior High School was identified primarily<br />

due to concerns over the stress on its infrastructure (e.g., water pressure, septic<br />

system, HVAC system, etc.).<br />

Roy C. Ketcham High School was viewed as a school with a diversified and<br />

rapidly growing enrollment experiencing congestion in common areas, such as<br />

corridors, stairwells and library, as well as instructional and support services<br />

space outside the schools Science Wings. Recommendations designed to<br />

favorably position the school in three to five years include modifying the<br />

unoccupied basement area to permit the relocation of technical type<br />

classrooms. The result would be an additional two (2) classrooms that would<br />

become available to the school in September 2006. Further, an extended day<br />

and/or campus scheduling model was recommended for both Roy C. Ketcham<br />

and John Jay High Schools juniors and seniors. Such a format would be in an<br />

opt-in basis and would extend the day for several students and thereby reduce<br />

pressure on the schools’ common areas.<br />

The recommendation of relocating Fishkill Elementary School’s sole Special<br />

Education Self-Contained classroom to Evans Elementary School was made to<br />

provide the former with a much needed additional general education instruction<br />

classroom.<br />

Strategies given to address John Jay High School’s space needs included the<br />

relocation of rooms to create additional general education instructional space<br />

and more effective management of student flow in and out of the schools<br />

cafeteria.<br />

Finally, recommendations were made to improve Van Wyck Junior High<br />

School’s HVAC system, due to concerns over the large number of occupants<br />

impact on the school’s infrastructure.<br />

-30-


School(s)<br />

I. Roy C. Ketcham<br />

High School<br />

II. Fishkill Elementary<br />

School<br />

III. John Jay<br />

High School<br />

IV. Van Wyck Junior<br />

High School<br />

VII. Projected/Estimated Cost(s)<br />

Projects<br />

Estimated<br />

Cost(s)<br />

Modify & convert basement area<br />

$128,000.00<br />

Install door/construct wall (Room 233) 6,500.00<br />

Partition room 239 No cost<br />

Modify & convert tunnel area room 5,000.00<br />

Construct Weight Room door/window 28,000.00<br />

Install shelving & clean out TSS Storage 500.00<br />

Total cost RCK $168,000.00<br />

Relocate Special Education Classroom<br />

$ 500.00<br />

Total cost Fishkill $ 500.00<br />

Relocate Coordinator’s office to Evans<br />

$ 2,500.00<br />

Convert Rooms 135 & 102 2,500.00<br />

Total cost John Jay $ 5,000.00<br />

HVAC – 7 rooms<br />

$ 55,000.00<br />

Paint 5,000.00<br />

Total cost Van Wyck $60,000.00<br />

TOTAL COSTS RECOMMENDED $233,500.00<br />