17.07.2013 Views

Kemira Oyj/Kemira M&I ABSTRACT Vesa Kettunen ... - Svenskt Vatten

Kemira Oyj/Kemira M&I ABSTRACT Vesa Kettunen ... - Svenskt Vatten

Kemira Oyj/Kemira M&I ABSTRACT Vesa Kettunen ... - Svenskt Vatten

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PDF-XChange<br />

w w w.tracker-software.co m<br />

Click to buy NOW!<br />

Wastewater Overflow Reduction Project in Vantaa River Catchment Area<br />

Aninka Urho, project coordinator, Helsinki Region Environmental Services<br />

Authority<br />

Aninka.urho@hsy.fi, Platform presentation in English<br />

Vantaa River catchment area is located in the most densely populated area of Finland. Wastewater overflows<br />

into the river have been a matter of great public interest of great interest recently. The current method of<br />

leading untreated wastewater into the nearest watercourse when there is a fault or overload in the sewer<br />

system has faced strong resistance among environmentalists.<br />

There are 9 participating organisations in this project:<br />

Helsinki Region Environmental Services Authority, Project coordination<br />

Municipal utilities from Riihimäki, Hyvinkää, Nurmijärvi, Kerava, Tuusula and Järvenpää<br />

Keski-Uusimaa Joint Municipal Board for Water Pollution Control (KUVES)<br />

The Water Protection Association of the River Vantaa and Helsinki Region<br />

This cooperation project is financed by Regional Development Fund of Uusimaa (national allowance) and<br />

Water Utilities Development Fund. Project duration is 2 years (2012-2013) and total budget 170 000 €.<br />

The aim of the project is to decrease wastewater overflows by various means:<br />

1. The project was started by defining a Vision, a Strategy and an Action Plan for stopping<br />

wastewater discharges into the Vantaa River. The vision is: “No untreated wastewater spills into<br />

waters”. Significant investments and an attitude change within the utilities are demanded to reach<br />

this challenging vision.<br />

The Strategy and Action programme is divided into three themes: a) Reliable pumping stations, b)<br />

adequate condition and correct sizing of wastewater networks c) I/I control management. The cost<br />

impacts of the Action Plan will be assessed by consultant.<br />

2. Reliable pumping stations are the key aspect when fighting against sewer overflows. In this project<br />

the pumping specialists from the utilities defined together the best practices concerning a) pumping<br />

station equipment and b) operation and maintenance procedures.<br />

3. The performance of utilities can be enhanced by developing staff training, interest group<br />

cooperation and customer guidance. Small pilot projects related to these topics are to be launched<br />

during 2013.<br />

PDF-XChange<br />

w w w.tracker-software.co m<br />

Click to buy NOW!

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!