25.07.2013 Views

204027 WVU Facilities - West Virginia University

204027 WVU Facilities - West Virginia University

204027 WVU Facilities - West Virginia University

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>WVU</strong> Tech Map<br />

<strong>WVU</strong> Tech — Located in Montgomery, WV, just 30 minutes outside the state capitol of Charleston. In June 2007, <strong>WVU</strong> Tech will become a division of <strong>West</strong><br />

<strong>Virginia</strong> <strong>University</strong>. The Tech campus is rich in history and heritage with over 100 years of dedication to higher education and academic excellence through<br />

nationally-recognized programs of study. The campus has 30 buildings on 169 acres.<br />

<strong>WVU</strong> Tech<br />

<strong>WVU</strong> Tech completed a Master Plan in 1992 and<br />

a Campus Community Development Plan in 2002.<br />

The goals for the 2002 plan are as follows.<br />

1. Achieve greater campus unity and beautification.<br />

2. Improve vehicular and pedestrian traffic<br />

circulation systems.<br />

3. Increase campus identity by improving entrances<br />

and gateways to <strong>WVU</strong> Tech.<br />

4. Achieve greater campus safety and accessibility.<br />

5. Identify current facility/land use patterns and<br />

develop optimum plans for facility/land usage in<br />

the future.<br />

36<br />

6. Develop guidelines to enhance the current and<br />

future technology infrastructure.<br />

The 2002 plan also contains information on enrollment,<br />

residence hall figures, facility usage, and<br />

maintenance and property acquisition.<br />

The following projects are in various phases:<br />

a) Engineering Lab reroofing. Half of the roof was<br />

completed—$175,000<br />

b) Physical Education Building reroofing (except for<br />

pool area), completed—$200,000<br />

c) Gymnasium floor refinishing, completed—$20,000<br />

d) Maclin Hall heating renovation, completed—<br />

$7,300<br />

e) Old Main sprinkler and fire alarm, in design—<br />

$1,150,000<br />

f) Engineering Classroom Building sprinkler and<br />

fire alarm, in design— $250,000<br />

g) Engineering Lab ADA, in design—$200,000<br />

h) Vining Library roof, in design—$150,000<br />

i) Engineering Lab roof, in design—$225,000<br />

j) Orndorff Hall ventilation, in design—$300,000<br />

k) ADA overall campus, future—$250,000<br />

l) Davis Hall, Community Tech School HVAC,<br />

waterproofing, ACM (asbestos control<br />

management), future—$800,000

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!