the new reclamation group footprint - Alive2green
the new reclamation group footprint - Alive2green
the new reclamation group footprint - Alive2green
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
The New Reclamation Group<br />
OPERATION EQUIPMENT<br />
Reclam has a large number of processing equipment, including <strong>the</strong> following:<br />
Four Fragmentisers (or Shredders) located at <strong>the</strong> main industrial centers in South Africa.<br />
(These Fragmentisers are capable of processing 50 tons of steel per hour each).<br />
In excess of one hundred high density ferrous and non-ferrous balers.<br />
Various mobile balers for processing in remote areas or construction sites.<br />
Over five hundred static shears,<br />
mobile shears, croppers, raspers,<br />
grinders, briquetting machines,<br />
choppers, granulators, cable strippers<br />
and a range of o<strong>the</strong>r processing and<br />
cutting equipment.