Government of Jharkhand.<br />

<strong>Road</strong> <strong>Construction</strong> <strong>Department</strong><br />

<strong>Road</strong> Circle Dumka<br />

Bill of Quantity<br />

Name of work :- M/R to Jama-Jamtatra-Rupnarainpur <strong>Road</strong> from<br />

86 88(600),89,90,91(500),93(500),94(500),95(500),96(500),<br />

97(500),98(500),99(500),100,101,102(500),103(400), Km.<br />

for the Year 10-11.<br />

OFFICE OF THE EXECUTIVE ENGINEER,<br />

ROAD CONSTRUCTION DEPARTMENT,JHARKHAND<br />

ROAD DIVISON,JAMTAA.


Tender paper for filling rates by the tenderes on the basis of enclosed approved bill of<br />

quantity for the work of M/R to Jama-Jamtatra-Rupnarainpur <strong>Road</strong> from 86<br />

,87,88(600),89,90,91(500),93(500),94(500),95(500),96(500),97(500),98(500),99(500),100,<br />

101,102(500),103(400), Km. for the Year 10-11.<br />

1.Estimated Cost:- Rs. 1173369.00<br />

2.Amount of E.M. to be deposited:- Rs. 23500.00<br />

3.Cost of bill of Quantity:- Rs. 2500.00<br />

4.Time of Completion:- 35 Days<br />

5.Last Date of sale of bill of Quantity:- 02.12.10 up to 3.00 P.M.<br />

6.Date & time of receiving tender:- 03.12.10 up to 3.00 P.M.<br />

7.Date & time of Opening the tender:- 03.12.10 At. 3.30 P.M<br />

8.Authority receiving tender:-<br />

C.E. (C) S.E. E.E. A.E.,R.C.D.,<br />

R.C.D., Ranchi R.C.D., Dumka R.C.D., Jamtara Jamtara / Nala /Masalia<br />

9.Tenderer is to quote his rate on percentage basic of enclosed bill of quantity rates both in<br />

words & figures in the noted columns (Note:- Cross (X) below the other rates which does<br />

not apply him.<br />

10.<br />

Percentage above the<br />

enclosed B.O.Q. Rates<br />

on all item of work<br />

(i) In figure:-<br />

(ii)In words:-<br />

11.Issued to Sri ……………………….<br />

12.Name & Complete postal address of<br />

tenderer:-<br />

13.Registration Number:-<br />

14.Amount of E.M. deposited by the<br />

tenderer in shape of :-<br />

15.Time of Completion as quoted by the<br />

tenderer:-<br />

16.Whether T.C.C., I.T.C., enclosed on<br />

not.:-<br />

17.Labour Registration on number:-<br />

18.Total number of sheets tender sheet<br />

including this sheet submitted by<br />

the tenderer :-<br />

Percentage below the<br />

enclosed B.O.Q. rates on<br />

all item of work<br />

At the enclosed bill<br />

of quantity rates on<br />

all item.<br />

REMARKS<br />

Date, Sign. of tenderer. Executive Engineer ,<br />

R.C.D., <strong>Road</strong> Division,<br />

Jamtara.


BOQ for ordinary repair for M/R to Jama-Jamtatra-Rupnarainpur <strong>Road</strong> from 86 ,87,<br />

88(600),89,90,91(500),93(500),94(500),95(500),96(500),97(500),98(500),99(500),100,101,<br />

102(500),103(400), Km. for the Year 10-11.<br />

Sl.No Item of work Quantity Unit Rate<br />

1 2 3 4 5<br />

1 Providing stone metal grade-III (53mm to<br />

22.4mm size) with screening materials<br />

crushable type such as moorum in road<br />

embankment in proper grade camber<br />

superelevation lead loose in thickness (1.33<br />

times the desired completed thickness)<br />

complete by soil road roller with cost of wagte<br />

all lead & lift including hire charge road roller all<br />

complete job and as per direction of E/I.<br />

K.M. 86,87,93,94,95 96.37 M 3 1392.70<br />

2 Providing 50mm thick compacted built up spray<br />

grout over W.B.M. surface in proper grade<br />

,camber and superelevation with stone metal<br />

grade -III (53mm to 22.4mm size)@ 0.66M 3 and<br />

screening type B(10mm size) @0.13M 3 and<br />

bitumen @25 Kg. (including tack coat @10 Kg.)<br />

all per 10M 2 surface including cost of cleaning<br />

the surface properly with iron brush and broom<br />

,cost of heating bitumen to required temp. with<br />

cost of fuel, rolling, providing light, barrier,<br />

danger signal, chowkidar, returning the empty<br />

bitumen drums in good condition to the<br />

godown and hire charge of roller as per<br />

specification and direction of E/I.(with packed<br />

bitumen)<br />

K.M. 86,87,93,94,95 1285.00 M 2 181.90<br />

3 Providing 50mm thick compacted built up spray<br />

grout over bitumenous(old) surface in proper<br />

grade ,camber and superelevation with stone<br />

metal grade -III (20mm to 37mm size)@ 0.66M3<br />

key stone or screening materials of size 12mm<br />

ungraded @ 0.13 M3and bitumen @20 Kg.<br />

(including tack coat @5 Kg.) all per 10M2<br />

surface including cost of cleaning the surface<br />

properly with iron brush and broom ,cost of<br />

heating bitumen to required temp. with cost of<br />

fuel ,rolling,providing light,barrier,danger<br />

signal,chowkidar,returning the empty bitumen<br />

drums in good condition to the godown and hire<br />

charge of roller as per specification and


direction of E/I.(with packd bitumen)<br />

K.M.<br />

86,87,88,89,90,91,93,94,95,96,97,98,99,100,102,103 2285.57<br />

M2 162.72<br />

Sl.No Item of work Quantity Unit Rate<br />

1 2 3 4 5<br />

4 Providing 20mm. Thick open graded premix<br />

carpet over bitumenous surface in proper grade<br />

.camber and superelevation with stone chips of<br />

13.2mm and 11.2mm size in ratio of (2:1) @<br />

0.27M 3 and bitumen @ 19.6Kg. Including tack<br />

coat @ 5Kg. All per 10 M 2 surface including cost<br />

of cleaning the surface properly with iron brush<br />

and broom ,cost of heating bitumen to required<br />

temp. with cost of fuel,rolling,providing<br />

light,barrier,danger signal,chowkidar,returning<br />

the empty bitumen drums in good condition to<br />

the godown and hire charge of roller as per<br />

specification and direction of E/I.<br />

K.M.<br />

86,87,88,89,90,91,93,94,95,96,97,98,99,100,102,103 3641.98<br />

M2 119.03<br />

Executive Engineer,<br />

R.C.D.,<strong>Road</strong> Division,Jamtara


OFFICE OF THE EXECUTIVE ENGINEER<br />

ROAD DIVISION,JAMTARA(JHARKHAND)<br />

SPECIAL CONDITION<br />

1. Tenderers must examine the site and the various aspect likely to affect the construction and cost<br />

and then quote with full knowledge of site conditions.<br />

2. The work must be carried out strictly as per P.W.D.& M.O.S.T., specification.<br />

3. All rates quoted on the tender should be for completed job including all carriage royalty, Sales<br />

tax, income tax and other taxes, the payment of which will be whole responsibility of the<br />

contractor.<br />

4 Rules laid down in Motors vehicle Act will have also to be followed if any vehicles are used by<br />

the contractor in <strong>Department</strong> works.<br />

5. Labour Rules fixed from time to time have also to be followed and quoted rates should include<br />

for all such items.<br />

6. Stone Chips, Stone metal, lime, bricks and jhama should be got approved by the Engineer-incharge<br />

before use. The contractor will have to remove all dust foreign materials and unapproved<br />

materials at his own cost.<br />

7. Tenderers have to made his complete arrangements for all accessories plants and machineries<br />

required for the execution of work.<br />

8. The Contractor shall not be entitled to claim any compensation for the loss suffered by him onaccount<br />

of (i) failure or delay by or on behalf of Govt. In the supply of materials of stores which<br />

the Govt. may have under taken (ii) natural calamities, (iii) transport and procurements<br />

difficulties,(iv) Circumstances beyond the control of Govt.<br />

9. <strong>Department</strong> materials should be used in works strictly in accordance with the actual requirement<br />

and for any differences the cost will be recovered at panel rates which will be double the issue<br />

rate. The contractor should also maintain proper accounts for such materials and should be in a<br />

position to submit the same when ever required.<br />

10. The Contractor will be full responsibility for watch and ward of the materials supplied by or to<br />

the <strong>Department</strong> and the materials will bne open to inspection by the <strong>Department</strong>al Officer No<br />

claim will be entertained in the case of theft, damages of materials at site till completion of the<br />

work.<br />

11. Contractors has to maintain necessary technical organisation for proper execution of works and<br />

should employ only such persons who arte skilled and experienced in the similar nature of works<br />

& the Executive Engineer shall be at liberty of object and enquire the contractor who in his<br />

opinion mis-conducts him self or is incompetent or neglegent in perfermens of his duties and<br />

such persons shall not be employed by the contractor without permission of the Executive<br />

Engineer.<br />

12. No Conditional tender will be accepted.<br />

13 Stone chips & Stone metal as per requirement will have to collected in full quantity in advance<br />

and stacked as per direction of E/I and be verified before consumption in be the work.<br />

14. Leveling dressing and clearing of the site will be done after completion of works as per direction<br />

of Engineer-in-Charge.<br />

15. Empty drums shall be returned by the contractor to the <strong>Department</strong> in good condition at P.W.D.<br />

Godown at their own cost. In case of loss of empty drums the cost will be recovered from the<br />

contractor @ Rs 160.00 per drum & for empty cement bags @ Rs 3.00 per bag.<br />

16. The letters sent to the contractor at the address give in the agreement and returned undelivered<br />

will be treated as to have been served.<br />

17. The Contractor invariably in all kinds of works will have to maintain a site order book at his<br />

own cost duly certified by the S.D.O. or Executive Engineer. The site order book should always<br />

be kept at site and should be produced properly when demanded by inspecting officer for loss of<br />

the book the contractor will be wholly responsible.


18. Entries in the site order Book will not be made by any officer les then the rank of S.D.O.,R.C.D<br />

But the site order book will be the property of the department.<br />

19. Any addition or alteration in the work must be done under the order of competent authority for<br />

which contractor should get order written on order book duly certified by Gazetted officer of the<br />

<strong>Department</strong>. the site order book should always be kept at the work sites.<br />

20. Royalty and cess will be recovered from each on account bill in case contractor will fail to<br />

produce royalty clearance certificate at this time of passing of bills.<br />

21. The value of work to be done should not exceed the agreement amount without the proper<br />

permission of the competent authority.<br />

22. Payment will be made subject to the availability of fund.<br />

23. It the contractor supply boulder, stone metal moorum gravel, bricks etc from less distance than<br />

those mentioned in the Bill of quantity then their rates will be reduced proportionately on basis<br />

of the approved rate of the contractor if the contractors are required to supply the materials from<br />

longer distance then prior approved of the officer who has approved the tender shall have to be<br />

obtained.<br />

24. In case of sectional measurement of earth work, the initial long and cross section of existing<br />

ground will be taken by the <strong>Department</strong>al officer in presence of the contractor of their<br />

authorized agent and graphs papers will be prepared showing existing ground level and<br />

proposed formation level which with also from part of the agreement the section plotted on<br />

graphs will entered in measurement book and the contractor will have to sign both the graphs<br />

sheets and measurement book for taken of his acceptance before commencement of the work.<br />

25. Earth work in filling be dones in the layers not exceeding 225mm layers. The surface of the unrolled<br />

earth will be made as per designed grades and cross section after breaking the coldness to<br />

the maximum size of 63mm rolling will be done after censuring that the earth to be rolled have<br />

moisture content within the permissible limit of the optimum moisture content. The subsequent<br />

layer of earth on the roller surface will be put only after ensuring that the earth roller has<br />

achieved the designed density at the designed moisture content. In order to ensure the proper<br />

compaction the test result of the compaction will have to be get seen by the Engineer-in-Charge<br />

of the work or his authorized representative.<br />

26. The Item of roller and competion includes the work of breaking the clouds to a maximum to 63<br />

mm, cube and placing the earth in layers not exceeding 225 mm thick and shaping and dressing<br />

the earth in required grades and profile.<br />

27. The deduction of sale tax will be made from the contractor bill as per order of Jharkhand Govt.<br />

from time to time (Conlained in Bihar F.D.(Coml. taxes) No.2138 dt.19-1-84 will be binding on<br />

the contractor.)<br />

28. The rate quoted less than 15% of estimated cost including Government materials will not be<br />

entertained & the rate to be quoted after decimal point should but not more than two digits.<br />

29. In case of tender filled by registered firm of company character certificate should be enclosed of<br />

all members.<br />

30. Quantities given in Bill of quantity are subject to variation and no claim of this score will be<br />

entertained.<br />

31. All other terms an conditions contained in vigilance department letter no.1/Est.27/83-2347<br />

T.E.C., Patna dt. 31.12.83 will be binding on the contractors.<br />

32. Vide Engr.-in – Chief Memo No. 2553 (E) dt. 4-5-90 the supply of Materials of different sizes<br />

and grated should be stacked at work site with proper size and for which no claim will be<br />

entertained.<br />

Mode of Measurement:<br />

Stone Chips & Moorum - 1.5 M x 1.5 M x 0.45 M<br />

To be taken to 1 M 3<br />

Stone Metal Grade-I 1.5 M x 1.5 M x 0.55 M<br />

To be taken to 1 M 3<br />

Stone Metal Gr.-II & III 1.5 M x 1.5 M x 0.52 M<br />

Should be taken to 1 M 3<br />

33. For mantaining temperature Every agency must have their own rate thermometer during the<br />

execution of bitumen work.<br />

34. The contractor will be responsible for making good to the <strong>Road</strong>/Bridge/Culvert repaired by him<br />

of any damage or failure occurs in the road on his own cost up to period of one years………….<br />

From the date of completion.


35. Contractor must have to be establish a quality control laboratory at the work site at his own cost.<br />

As per direction of MOST & Quality Control. The Agency will have to submit time to time the<br />

quality control test reports of the materials and the work done with the bill.<br />

36. Payment will be done only after finding Satisfactory test reports of the work done.<br />

37. Agreement for work will be done after acquisition of land for purpose approach road.<br />

Executive Engineer,<br />

R.C.D.,<strong>Road</strong> Division,Jamtara<br />

dk;Zikyd vfHk;ark dk dk;kZy;]<br />

iFk fuekZ.k foHkkx] iFk izeaMy] tkerkM+kA<br />

fufonk vkea=.k lwpuk<br />

1- foKkiunkrk dk uke %& dk;Zikyd vfHk;ark]<br />

iFk fuekZ.k foHkkx]iFk izeaMy] tkerkM+k A<br />

2- ifjek.k foi= dh fodzh dh frfFk ,oa le;%& fnukad 02-12-10 ]3-00 cts vijkgu~<br />

rd<br />

3- fufonk izkfIr dh vafre frfFk ,oa le; % 03-12-10 ]3-00 cts vijkgu rd<br />

4- fufonk [kksyus dh frfFk ,oa le;%& fnukad 03-12-10 ] 3-30 cts<br />

vijkgu<br />

5- ifjek.k foi= fodzh dk LFkku %& 1- eq[; vfHk;ark ¼;k0½]iFk<br />

fuekZ.k foHkkx]<br />

dk dk;kZy; lh0,e0ih0Mh0vkbZ<br />

ifjlj dkWds] jksM] jkWaphA<br />

2- v/kh{k.k vfHk;ark ] iFk fuekZ.k<br />

foHkkx<br />

iFk vapy ] nqedk dk dk;kZy; A<br />

3- uxj Fkkuk ifjlj ]tkerkM+kA<br />

6-fufonk izkfIr ,oa [kksyus dk LFkku %& dzekad 5 esa n”kkZ;k x;s<br />

dk;kZy; esaA<br />

7-dk;Z dh fooj.kh fuEu izdkj gS%&<br />

dz0<br />

dk;Z dk uke izkDdfyr<br />

jkf”k<br />

¼:0 esa<br />

½<br />

vxz/ku<br />

dh jkf”k<br />

¼:0½<br />

Ikfjek.k<br />

foi= dk<br />

eqY;<br />

¼:0½<br />

dk;Z<br />

lekfIr<br />

dh<br />

vof/kA<br />

1 2 3 4 5 6<br />

1 Tkkek&tkerkM+k&:iukjk;.kiqj iFk ds<br />

fd0<br />

eh08688(600),89,90,91(500),93(500),94<br />

(500),95(500),96(500),97(500),98(500),<br />

99(500),100,101,102(500),103(400),rd<br />

lk/kkj.k ejeefr dk;ZA<br />

2 Tkkek&tkerkM+k&:iukjk;.kiqj iFk ds<br />

fd0 eh0 92 ,93(500), 95(500), 96(500),<br />

97(500), 98(500), 99(500), 102(500),<br />

103(500), 104(300) rd lrg uohdj.k<br />

dk;ZA<br />

1173369-<br />

00<br />

8330883-<br />

00<br />

23500-<br />

00<br />

167000-<br />

00<br />

2500-<br />

00<br />

10000-<br />

00<br />

35 fnu<br />

45 fnu<br />

3 eqxkZcuh&jktuxj&dq.Mfgr iFk esa 61520-00 1300-00 500-00 45 fnu


fd0 eh0 iksLV xM+kbZ ,oa jaxkbZ<br />

fy[kkbZ dk;Z A¼foosdk/khu en ls½<br />

8- ifjek.k foi= ds dz; gsrq vkosnu i= ds lkFk iFk fuekZ.k foHkkx ds leqfpr Js.kh esa<br />

fuca/ku Js.kh esa fuca/ku izek.k&i= ] v|ru vk;dj lQk;k izek.k i= ] okf.kT; dj fuca/ku<br />

izek.k i=] v|ru Je okf.kT; dj lQk;k izek.k i= ] v|ru Je vuqKfIr ] v|ru pfj= izek.k i= dh Nk;k<br />

izfr ¼vfHkizekf.kr½ ,oa ifjek.k foi= dk eqY; ¼tks yksVk;k ugha tk;sxk½ ds lerqY; cSad<br />

MªkIV tks dk;Zikyd vfHk;ark ] iFk fuekZ.k foHkkx] iFk izeaMy] tkerkM+k ds inuke ls<br />

Hkkjrh; LVsV cSad] tkerkM+k esa gh Hkqxrs; gks] dks layXu djuk vfuok;Z gksxk A<br />

9- fufonk dh vU; fo”ks’k “kRrsZ fufonk i= ds lkFk layXu jgsxk tks fufonnkrkvksa dks<br />

ekU; gksxh A<br />

10-fcuk dkj.k crk;s foHkkx dks fdlh ;k lHkh fufonk dks j} djus @ LFkfxr djus dk vf/kdkj<br />

lqjf{kr gSA<br />

11-fufonknkrk }kjk ifjek.k foi= esa ;Fkk vafdr jkf”k ds vuqlkj fufonk vfHkys[k ds lkFk<br />

N% o’khZ; cpr izek.k i= ¼8okW fuxZe½ ;k ikWp o’khZ; Mkd/kj lkof/k tek ] tks >kj[kaM<br />

jkT; ds fdlh Hkh Mkd/kj ls fuxZr gks ] ds :Ik esa dk;Zikyd vfHk;ark ] iFk fuekZ.k<br />

foHkkx] iFk izeaMy] tkerkM+k ds inuke ls fof/kor izfrKIr djk dj tek djuk vfuok;Z gksxk<br />

A<br />

12-fufonk fu’iknu ds ,d lIrkg ds vUnj laosnd dks ,djkjukek djds dk;Z izkjaHk dj nsuk<br />

vfuok;Z gksxk A vU;Fkk nqljs U;wure nj nkrk dks dk;Z vkoafVr dj fn;k tk;sxk A<br />

13-“krZ;qDr fufonk ekU; ugha gksxh A<br />

14-fufonkdkj ftu dk;Z ds fy, fufonk ns jgs gS os Loa; LFkyh; fLFkrh ns[kdj larq’V<br />

gksus ds ckn gh fufonk nj vafdr djsa A ckn esa dksbZ Hkh nkok ekU; ugh gksxk A<br />

15-izkDdfyr jkf”k /kV c


21- fufonkrk dh “kkrZ www.jharkhand.gov.in ls Bid Document download dj Hkh fufonk<br />

tek dj ldrs gS ,oa bldk ewY; vyx funsf”kr Lo:Ik esa ls fufonk Mkyrs le; tek djsxsaA<br />

22-fufonk dh “krksa dks www.jharkhand.gov.in ,oa v/kksgLrk{kjh ] dk;kZy; ds lwpuk iV~<br />

ij ns[kk tk ldrk gSA<br />

23-fdlh dkj.ko”k fcdzh ,oa izkfIr dh frfFk dks vodk”k /kksf’kr gksus ij dze”k% vxys dk;Z<br />

fnol dks fcdzh ,oa izkfIr dh frfFk c


Bill of Quantity<br />

Name of work :- Surface renewal to Jama-Jamtatra- Rupnarainpur<br />

<strong>Road</strong> from 92 ,93(500), 95(500), 96(500), 97(500),<br />

98(500), 99(500), 102(500), 103(500), 104(300) K.M<br />

for the Year 10-11<br />

OFFICE OF THE EXECUTIVE ENGINEER,<br />

ROAD CONSTRUCTION DEPARTMENT,JHARKHAND<br />

ROAD DIVISON,JAMTAA.<br />

Tender paper for filling rates by the tenderes on the basis of enclosed approved bill of<br />

quantity for the work of Surface renewal to Jama-Jamtatra- Rupnarainpur <strong>Road</strong> from 92<br />

,93(500), 95(500), 96(500), 97(500), 98(500), 99(500), 102(500), 103(500), 104(300) for the<br />

Year 10-11<br />

1.Estimated Cost:- Rs. 8330883.00<br />

2.Amount of E.M. to be deposited:- Rs. 167000.00<br />

3.Cost of bill of Quantity:- Rs. 10000.00<br />

4.Time of Completion:- 45 Days<br />

5.Last Date of sale of bill of Quantity:- 02.12.10 up to 3.00 P.M.<br />

6.Date & time of receiving tender:- 03.12.10 up to 3.00 P.M.<br />

7.Date & time of Opening the tender:- 03.12.10 At. 3.30 P.M<br />

8.Authority receiving tender:-<br />

C.E. (C) S.E. E.E. A.E.,R.C.D.,<br />

R.C.D., Ranchi R.C.D., Dumka R.C.D., Jamtara Jamtara / Nala /Masalia<br />

9.Tenderer is to quote his rate on percentage basic of enclosed bill of quantity rates both in<br />

words & figures in the noted columns (Note:- Cross (X) below the other rates which does<br />

not apply him.


10.<br />

Percentage above the<br />

enclosed B.O.Q. Rates<br />

on all item of work<br />

(i) In figure:-<br />

(ii)In words:-<br />

11.Issued to Sri ……………………….<br />

12.Name & Complete postal address of<br />

tenderer:-<br />

13.Registration Number:-<br />

14.Amount of E.M. deposited by the<br />

tenderer in shape of :-<br />

15.Time of Completion as quoted by the<br />

tenderer:-<br />

16.Whether T.C.C., I.T.C., enclosed on<br />

not.:-<br />

17.Labour Registration on number:-<br />

18.Total number of sheets tender sheet<br />

including this sheet submitted by<br />

the tenderer :-<br />

Percentage below the<br />

enclosed B.O.Q. rates on<br />

all item of work<br />

At the enclosed bill<br />

of quantity rates on<br />

all item.<br />

REMARKS<br />

Date, Sign. of tenderer. Executive Engineer ,<br />

R.C.D., <strong>Road</strong> Division,<br />

Jamtara.


BOQ For Surface renewal to Jama-Jamtatra- Rupnarainpur <strong>Road</strong> from 92<br />

,93(500), 95(500), 96(500), 97(500), 98(500), 99(500), 102(500), 103(500),<br />

104(300) for the Year 10-11<br />

Sl.No Item of work Quantity Unit Rate<br />

1 2 3 4 5<br />

1<br />

6.3.22(a)<br />

Providing 50mm thick compacted built<br />

up spray grout over bitumenous(old)<br />

surface in proper grade ,camber and<br />

superelevation with stone metal grade<br />

-III (20mm to 37mm size)@ 0.66M3 key<br />

stone or screening materials of size<br />

12mm ungraded @ 0.13 M3and<br />

bitumen @20 Kg. (including tack coat<br />

@5 Kg.) all per 10M2 surface including<br />

cost of cleaning the surface properly<br />

with iron brush and broom ,cost of<br />

heating bitumen to required temp.<br />

with cost of fuel ,rolling,providing<br />

light,barrier,danger<br />

signal,chowkidar,returning the empty<br />

bitumen drums in good condition to<br />

the godown and hire charge of roller as<br />

per specification and direction of<br />

E/I.(with packd bitumen)<br />

92,93,95,96,97,98,99,102,103,104 4991.00<br />

M2<br />

163.22<br />

2<br />

NH 5.2<br />

Providing and applying tack coat with<br />

bitumen emulsion using emulsion<br />

pressure distributor at the rate of 0.20<br />

kg per sqm on the prepared<br />

bituminous/granular surface cleaned<br />

with mechanical broom.<br />

92,93,95,96,97,98,99,102,103,104 38213.00 M 2 7.17<br />

3<br />

NH 7(ii)<br />

Providing and laying 25mm thick semi<br />

dense bituminous concrete with 100-<br />

120 TPH batch type HMP producing an<br />

average output of 75 tones per hour<br />

using crushed aggregates of specified<br />

grading, premixed with bituminous<br />

binder @ 4.5 to 5 per cent of mix and<br />

filler, transporting the hot mix to work<br />

site, laying with a hydrostatic paver<br />

finisher with sensor control to the<br />

required grade, level and alignment,<br />

rolling with smooth wheeled, vibratory<br />

and tandem rollers to achieve the<br />

desired compaction as per MoRTH


specification clause No. 508 complete<br />

in all respects<br />

92,93,95,96,97,98,99,102,103,104 955.325 M 3 7130.40<br />

Sl.No Item of work Quantity Unit Rate<br />

1 2 3 4 5<br />

4<br />

6.1.02<br />

5<br />

6.1.14<br />

6<br />

6.4.5<br />

Earth work in road embankment and<br />

shoulders with ordinary soil (vide<br />

classification of soil item-A) obtained<br />

from borrow pits or any other source<br />

free from logs,slumps,roots,rubbish or<br />

any other ingredients likely to<br />

deteriorate or effect the stability of the<br />

embankment including breaking the<br />

clods maximum to 60mm. cube<br />

,placing the earth in layers not<br />

exceeding 225mm in loose<br />

thickness,rough dressing,including cost<br />

of cutting and removing shrubs and<br />

roots falling in borrow area,all<br />

complete as per approved<br />

design,specification and direction of<br />

E/I.<br />

92,93,95,96,97,98,99,102,103,104 2440.00 M 3 36.10<br />

Rolling and compaction of road<br />

embankment in all kinds of soil<br />

including hard gravelly soil mixed with<br />

boulders by road roller in layers not<br />

exceeding 225mm.in loose thickness<br />

do to achieve 90 to 95% maximum dry<br />

density of O.M.C. uniformly including<br />

mixing of requried quantity of water<br />

including cost of supply and carriage of<br />

water with all leads and lifts,finishing<br />

the surface to proper grade,camber or<br />

superelevation including cost of hire<br />

charges of road roller,providing light<br />

barriers danger signals,chowkidars all<br />

complete as per specification and<br />

direction of E/I.<br />

92,93,95,96,97,98,99,102,103,104 2440.00 M 3 9.65<br />

Providing and fixing at site perecast<br />

RCC (1:2:4) ordinary Km Post (350mm<br />

×250mm×1110) with 20 size stone<br />

aggregate and clean coarse sand fixing<br />

the post in cement concrete (1:4:8) all<br />

with 40mm approved quality or stone<br />

aggregagte and including cost<br />

shuttering,curing,carriage ,fiishing,<br />

making, platform icluding brending,<br />

bidin and cost of reinforcement all<br />

complete as I.R.C. specification and<br />

direction of E/I.


Sl.No<br />

8 No.s 8 Each 1145.45<br />

Item of work<br />

Quantity<br />

Unit<br />

1 2 3 4 5<br />

7<br />

6.4.4<br />

8<br />

6.4.9<br />

9<br />

NH 8.3<br />

Providing and fixing at site perecast<br />

RCC (1:2:4) 5th Km Post (500mm<br />

×250mm×1525) with 20 size stone<br />

aggregate and clean coarse sand fixing<br />

the post in cement concrete (1:4:8) do<br />

all with 40mm approved quality or<br />

stone aggregagte and including cost<br />

shuttering,curing,carriage ,fiishing,<br />

making, platform icluding brending,<br />

bidin and cost of reinforcement all<br />

complete as I.R.C. specification and<br />

direction of E/I.<br />

Rate<br />

(a) 5th Km post 3.00 Each 1804.45<br />

Painting , Numbering and writing posts<br />

with two coats of enamel paints of<br />

approved shade and make after<br />

cleaning the surface thoroughly and<br />

writing with necessary information at<br />

site all complte as per I.R.C.<br />

specification and direction of E/I.<br />

Km post – 12 Nos. 12 Each 195.05<br />

5th Km post – 3 Nos.<br />

Providing & laying of hot applied<br />

thermoplastic compound 2.5 mm thick<br />

including refloctorised glass beads @<br />

250gms/sqm as per IRC-35 do do all<br />

complete job as per MOSRT & H Sp. C.I.<br />

No. 803 for center line marking<br />

(broken)<br />

3 Each 356.05<br />

92,93,95,96,97,98,99,102,103,104 800.00 M 2 376.00<br />

Executive Engineer,<br />

R.C.D.,<strong>Road</strong> Division,Jamtara


OFFICE OF THE EXECUTIVE ENGINEER<br />

ROAD DIVISION,JAMTARA(JHARKHAND)<br />

SPECIAL CONDITION<br />

1. Tenderers must examine the site and the various aspect likely to affect the construction and cost<br />

and then quote with full knowledge of site conditions.<br />

2. The work must be carried out strictly as per P.W.D.& M.O.S.T., specification.<br />

3. All rates quoted on the tender should be for completed job including all carriage royalty, Sales<br />

tax, income tax and other taxes, the payment of which will be whole responsibility of the<br />

contractor.<br />

4 Rules laid down in Motors vehicle Act will have also to be followed if any vehicles are used by<br />

the contractor in <strong>Department</strong> works.<br />

5. Labour Rules fixed from time to time have also to be followed and quoted rates should include<br />

for all such items.<br />

6. Stone Chips, Stone metal, lime, bricks and jhama should be got approved by the Engineer-incharge<br />

before use. The contractor will have to remove all dust foreign materials and unapproved<br />

materials at his own cost.<br />

7. Tenderers have to made his complete arrangements for all accessories plants and machineries<br />

required for the execution of work.<br />

8. The Contractor shall not be entitled to claim any compensation for the loss suffered by him onaccount<br />

of (i) failure or delay by or on behalf of Govt. In the supply of materials of stores which<br />

the Govt. may have under taken (ii) natural calamities, (iii) transport and procurements<br />

difficulties,(iv) Circumstances beyond the control of Govt.<br />

9. <strong>Department</strong> materials should be used in works strictly in accordance with the actual requirement<br />

and for any differences the cost will be recovered at panel rates which will be double the issue<br />

rate. The contractor should also maintain proper accounts for such materials and should be in a<br />

position to submit the same when ever required.<br />

10. The Contractor will be full responsibility for watch and ward of the materials supplied by or to<br />

the <strong>Department</strong> and the materials will bne open to inspection by the <strong>Department</strong>al Officer No<br />

claim will be entertained in the case of theft, damages of materials at site till completion of the<br />

work.<br />

11. Contractors has to maintain necessary technical organisation for proper execution of works and<br />

should employ only such persons who arte skilled and experienced in the similar nature of works<br />

& the Executive Engineer shall be at liberty of object and enquire the contractor who in his<br />

opinion mis-conducts him self or is incompetent or neglegent in perfermens of his duties and<br />

such persons shall not be employed by the contractor without permission of the Executive<br />

Engineer.<br />

12. No Conditional tender will be accepted.<br />

13 Stone chips & Stone metal as per requirement will have to collected in full quantity in advance<br />

and stacked as per direction of E/I and be verified before consumption in be the work.<br />

14. Leveling dressing and clearing of the site will be done after completion of works as per direction<br />

of Engineer-in-Charge.<br />

15. Empty drums shall be returned by the contractor to the <strong>Department</strong> in good condition at P.W.D.<br />

Godown at their own cost. In case of loss of empty drums the cost will be recovered from the<br />

contractor @ Rs 160.00 per drum & for empty cement bags @ Rs 3.00 per bag.<br />

16. The letters sent to the contractor at the address give in the agreement and returned undelivered<br />

will be treated as to have been served.<br />

17. The Contractor invariably in all kinds of works will have to maintain a site order book at his<br />

own cost duly certified by the S.D.O. or Executive Engineer. The site order book should always<br />

be kept at site and should be produced properly when demanded by inspecting officer for loss of<br />

the book the contractor will be wholly responsible.<br />

18. Entries in the site order Book will not be made by any officer les then the rank of S.D.O.,R.C.D<br />

But the site order book will be the property of the department.<br />

19. Any addition or alteration in the work must be done under the order of competent authority for<br />

which contractor should get order written on order book duly certified by Gazetted officer of the<br />

<strong>Department</strong>. the site order book should always be kept at the work sites.<br />

20. Royalty and cess will be recovered from each on account bill in case contractor will fail to<br />

produce royalty clearance certificate at this time of passing of bills.


21. The value of work to be done should not exceed the agreement amount without the proper<br />

permission of the competent authority.<br />

22. Payment will be made subject to the availability of fund.<br />

23. It the contractor supply boulder, stone metal moorum gravel, bricks etc from less distance than<br />

those mentioned in the Bill of quantity then their rates will be reduced proportionately on basis<br />

of the approved rate of the contractor if the contractors are required to supply the materials from<br />

longer distance then prior approved of the officer who has approved the tender shall have to be<br />

obtained.<br />

24. In case of sectional measurement of earth work, the initial long and cross section of existing<br />

ground will be taken by the <strong>Department</strong>al officer in presence of the contractor of their<br />

authorized agent and graphs papers will be prepared showing existing ground level and<br />

proposed formation level which with also from part of the agreement the section plotted on<br />

graphs will entered in measurement book and the contractor will have to sign both the graphs<br />

sheets and measurement book for taken of his acceptance before commencement of the work.<br />

25. Earth work in filling be dones in the layers not exceeding 225mm layers. The surface of the unrolled<br />

earth will be made as per designed grades and cross section after breaking the coldness to<br />

the maximum size of 63mm rolling will be done after censuring that the earth to be rolled have<br />

moisture content within the permissible limit of the optimum moisture content. The subsequent<br />

layer of earth on the roller surface will be put only after ensuring that the earth roller has<br />

achieved the designed density at the designed moisture content. In order to ensure the proper<br />

compaction the test result of the compaction will have to be get seen by the Engineer-in-Charge<br />

of the work or his authorized representative.<br />

26. The Item of roller and competion includes the work of breaking the clouds to a maximum to 63<br />

mm, cube and placing the earth in layers not exceeding 225 mm thick and shaping and dressing<br />

the earth in required grades and profile.<br />

27. The deduction of sale tax will be made from the contractor bill as per order of Jharkhand Govt.<br />

from time to time (Conlained in Bihar F.D.(Coml. taxes) No.2138 dt.19-1-84 will be binding on<br />

the contractor.)<br />

28. The rate quoted less than 15% of estimated cost including Government materials will not be<br />

entertained & the rate to be quoted after decimal point should but not more than two digits.<br />

29. In case of tender filled by registered firm of company character certificate should be enclosed of<br />

all members.<br />

30. Quantities given in Bill of quantity are subject to variation and no claim of this score will be<br />

entertained.<br />

31. All other terms an conditions contained in vigilance department letter no.1/Est.27/83-2347<br />

T.E.C., Patna dt. 31.12.83 will be binding on the contractors.<br />

32. Vide Engr.-in – Chief Memo No. 2553 (E) dt. 4-5-90 the supply of Materials of different sizes<br />

and grated should be stacked at work site with proper size and for which no claim will be<br />

entertained.<br />

Mode of Measurement:<br />

Stone Chips & Moorum - 1.5 M x 1.5 M x 0.45 M<br />

To be taken to 1 M 3<br />

Stone Metal Grade-I 1.5 M x 1.5 M x 0.55 M<br />

To be taken to 1 M 3<br />

Stone Metal Gr.-II & III 1.5 M x 1.5 M x 0.52 M<br />

Should be taken to 1 M 3<br />

33. For mantaining temperature Every agency must have their own rate thermometer during the<br />

execution of bitumen work.<br />

34. The contractor will be responsible for making good to the <strong>Road</strong>/Bridge/Culvert repaired by him<br />

of any damage or failure occurs in the road on his own cost up to period of one years………….<br />

From the date of completion.<br />

35. Contractor must have to be establish a quality control laboratory at the work site at his own cost.<br />

As per direction of MOST & Quality Control. The Agency will have to submit time to time the<br />

quality control test reports of the materials and the work done with the bill.<br />

36. Payment will be done only after finding Satisfactory test reports of the work done.<br />

37. Agreement for work will be done after acquisition of land for purpose approach road.<br />

Executive Engineer<br />

R.C.D.,<strong>Road</strong> Division,Jamtara


dk;Zikyd vfHk;ark dk dk;kZy;]<br />

iFk fuekZ.k foHkkx] iFk izeaMy] tkerkM+kA<br />

fufonk vkea=.k lwpuk<br />

1- foKkiunkrk dk uke %& dk;Zikyd vfHk;ark]<br />

iFk fuekZ.k foHkkx]iFk izeaMy] tkerkM+k A<br />

2- ifjek.k foi= dh fodzh dh frfFk ,oa le;%& fnukad 02-12-10 ]3-00 cts vijkgu~<br />

rd<br />

3- fufonk izkfIr dh vafre frfFk ,oa le; % 03-12-10 ]3-00 cts vijkgu rd<br />

4- fufonk [kksyus dh frfFk ,oa le;%& fnukad 03-12-10 ] 3-30 cts<br />

vijkgu<br />

5- ifjek.k foi= fodzh dk LFkku %& 1- eq[; vfHk;ark ¼;k0½]iFk<br />

fuekZ.k foHkkx]<br />

dk dk;kZy; lh0,e0ih0Mh0vkbZ<br />

ifjlj dkWds] jksM] jkWaphA<br />

2- v/kh{k.k vfHk;ark ] iFk fuekZ.k<br />

foHkkx<br />

iFk vapy ] nqedk dk dk;kZy; A<br />

3- uxj Fkkuk ifjlj ]tkerkM+kA<br />

6-fufonk izkfIr ,oa [kksyus dk LFkku %& dzekad 5 esa n”kkZ;k x;s<br />

dk;kZy; esaA<br />

7-dk;Z dh fooj.kh fuEu izdkj gS%&<br />

dz0<br />

dk;Z dk uke izkDdfyr<br />

jkf”k<br />

¼:0 esa<br />

½<br />

vxz/ku<br />

dh jkf”k<br />

¼:0½<br />

Ikfjek.k<br />

foi= dk<br />

eqY;<br />

¼:0½<br />

dk;Z<br />

lekfIr<br />

dh<br />

vof/kA<br />

1 2 3 4 5 6<br />

1 Tkkek&tkerkM+k&:iukjk;.kiqj iFk ds<br />

fd0<br />

eh08688(600),89,90,91(500),93(500),94<br />

(500),95(500),96(500),97(500),98(500),<br />

99(500),100,101,102(500),103(400),rd<br />

lk/kkj.k ejeefr dk;ZA<br />

2 Tkkek&tkerkM+k&:iukjk;.kiqj iFk ds<br />

fd0 eh0 92 ,93(500), 95(500), 96(500),<br />

97(500), 98(500), 99(500), 102(500),<br />

103(500), 104(300) rd lrg uohdj.k<br />

dk;ZA<br />

3 eqxkZcuh&jktuxj&dq.Mfgr iFk esa<br />

fd0 eh0 iksLV xM+kbZ ,oa jaxkbZ<br />

fy[kkbZ dk;Z A¼foosdk/khu en ls½<br />

1173369-<br />

00<br />

8330883-<br />

00<br />

23500-<br />

00<br />

167000-<br />

00<br />

2500-<br />

00<br />

10000-<br />

00<br />

35 fnu<br />

45 fnu<br />

61520-00 1300-00 500-00 45 fnu<br />

8- ifjek.k foi= ds dz; gsrq vkosnu i= ds lkFk iFk fuekZ.k foHkkx ds leqfpr Js.kh esa<br />

fuca/ku Js.kh esa fuca/ku izek.k&i= ] v|ru vk;dj lQk;k izek.k i= ] okf.kT; dj fuca/ku<br />

izek.k i=] v|ru Je okf.kT; dj lQk;k izek.k i= ] v|ru Je vuqKfIr ] v|ru pfj= izek.k i= dh Nk;k<br />

izfr ¼vfHkizekf.kr½ ,oa ifjek.k foi= dk eqY; ¼tks yksVk;k ugha tk;sxk½ ds lerqY; cSad


MªkIV tks dk;Zikyd vfHk;ark ] iFk fuekZ.k foHkkx] iFk izeaMy] tkerkM+k ds inuke ls<br />

Hkkjrh; LVsV cSad] tkerkM+k esa gh Hkqxrs; gks] dks layXu djuk vfuok;Z gksxk A<br />

9- fufonk dh vU; fo”ks’k “kRrsZ fufonk i= ds lkFk layXu jgsxk tks fufonnkrkvksa dks<br />

ekU; gksxh A<br />

10-fcuk dkj.k crk;s foHkkx dks fdlh ;k lHkh fufonk dks j} djus @ LFkfxr djus dk vf/kdkj<br />

lqjf{kr gSA<br />

11-fufonknkrk }kjk ifjek.k foi= esa ;Fkk vafdr jkf”k ds vuqlkj fufonk vfHkys[k ds lkFk<br />

N% o’khZ; cpr izek.k i= ¼8okW fuxZe½ ;k ikWp o’khZ; Mkd/kj lkof/k tek ] tks >kj[kaM<br />

jkT; ds fdlh Hkh Mkd/kj ls fuxZr gks ] ds :Ik esa dk;Zikyd vfHk;ark ] iFk fuekZ.k<br />

foHkkx] iFk izeaMy] tkerkM+k ds inuke ls fof/kor izfrKIr djk dj tek djuk vfuok;Z gksxk<br />

A<br />

12-fufonk fu’iknu ds ,d lIrkg ds vUnj laosnd dks ,djkjukek djds dk;Z izkjaHk dj nsuk<br />

vfuok;Z gksxk A vU;Fkk nqljs U;wure nj nkrk dks dk;Z vkoafVr dj fn;k tk;sxk A<br />

13-“krZ;qDr fufonk ekU; ugha gksxh A<br />

14-fufonkdkj ftu dk;Z ds fy, fufonk ns jgs gS os Loa; LFkyh; fLFkrh ns[kdj larq’V<br />

gksus ds ckn gh fufonk nj vafdr djsa A ckn esa dksbZ Hkh nkok ekU; ugh gksxk A<br />

15-izkDdfyr jkf”k /kV c


23-fdlh dkj.ko”k fcdzh ,oa izkfIr dh frfFk dks vodk”k /kksf’kr gksus ij dze”k% vxys dk;Z<br />

fnol dks fcdzh ,oa izkfIr dh frfFk c


Name of work :- M/R to Murgabani- Rajnagar-Kundhit<br />

<strong>Road</strong> Under Nala Sub-Division.<br />

OFFICE OF THE EXECUTIVE ENGINEER,<br />

ROAD CONSTRUCTION DEPARTMENT,JHARKHAND<br />

ROAD DIVISON,JAMTAA.<br />

Tender paper for filling rates by the tenderes on the basis of enclosed approved bill of<br />

quantity for the work of M/R to Murgabani- Rajnagar-Kundhit <strong>Road</strong> Under Nala Sub-<br />

Division. for the Year 10-11<br />

1.Estimated Cost:- Rs. 61520.00<br />

2.Amount of E.M. to be deposited:- Rs. 1300.00<br />

3.Cost of bill of Quantity:- Rs. 500.00<br />

4.Time of Completion:- 45 Days<br />

5.Last Date of sale of bill of Quantity:- 02.12.10 up to 3.00 P.M.<br />

6.Date & time of receiving tender:- 03.12.10 up to 3.00 P.M.<br />

7.Date & time of Opening the tender:- 03.12.10 At. 3.30 P.M<br />

8.Authority receiving tender:-<br />

C.E. (C) S.E. E.E. A.E.,R.C.D.,<br />

R.C.D., Ranchi R.C.D., Dumka R.C.D., Jamtara Jamtara / Nala /Masalia<br />

9.Tenderer is to quote his rate on percentage basic of enclosed bill of quantity rates both in<br />

words & figures in the noted columns (Note:- Cross (X) below the other rates which does<br />

not apply him.<br />

10.<br />

Percentage above the<br />

enclosed B.O.Q. Rates<br />

on all item of work<br />

(i) In figure:-<br />

(ii)In words:-<br />

Percentage below the<br />

enclosed B.O.Q. rates on<br />

all item of work<br />

At the enclosed bill<br />

of quantity rates on<br />

all item.<br />

REMARKS


11.Issued to Sri ……………………….<br />

12.Name & Complete postal address of<br />

tenderer:-<br />

13.Registration Number:-<br />

14.Amount of E.M. deposited by the<br />

tenderer in shape of :-<br />

15.Time of Completion as quoted by the<br />

tenderer:-<br />

16.Whether T.C.C., I.T.C., enclosed on<br />

not.:-<br />

17.Labour Registration on number:-<br />

18.Total number of sheets tender sheet<br />

including this sheet submitted by<br />

the tenderer :-<br />

Date, Sign. of tenderer. Executive Engineer ,<br />

R.C.D., <strong>Road</strong> Division,<br />

Jamtara.


BOQ For M/R to Murgabani- Rajnagar-Kundhit <strong>Road</strong> Under Nala Sub-Division.<br />

for the Year 10-11<br />

Sl.No Item of work Quantity Unit Rate<br />

1 2 3 4 5<br />

Providing and fixing at site perecast RCC<br />

1<br />

(1:2:4) ordinary Km Post (350mm<br />

×250mm×1110) with 20 size stone<br />

aggregate and clean coarse sand fixing<br />

the post in cement concrete (1:4:8) all<br />

with 40mm approved quality or stone<br />

aggregagte and including cost<br />

shuttering,curing,carriage ,fiishing,<br />

making, platform icluding brending,<br />

bidin and cost of reinforcement all<br />

complete as I.R.C. specification and<br />

direction of E/I<br />

33 No.s 33 Each 1145.45<br />

2 Providing and fixing at site perecast RCC<br />

(1:2:4) 5th Km Post (500mm<br />

×250mm×1525) with 20 size stone<br />

aggregate and clean coarse sand fixing<br />

the post in cement concrete (1:4:8) do<br />

all with 40mm approved quality or<br />

stone aggregagte and including cost<br />

shuttering,curing,carriage ,fiishing,<br />

making, platform icluding brending,<br />

bidin and cost of reinforcement all<br />

complete as I.R.C. specification and<br />

direction of E/I.<br />

(a) 5th Km post- 8 Nos. 8 Each 1804.45<br />

3 Painting , Numbering and writing posts<br />

with two coats of enamel paints of<br />

approved shade and make after<br />

cleaning the surface thoroughly and<br />

writing with necessary information at<br />

site all complte as per I.R.C.<br />

specification and direction of E/I.<br />

Km post – 33 Nos. 33 Each 195.05<br />

5th Km post – 8 Nos. 8 Each 356.05<br />

Executive Engineer,<br />

<strong>Road</strong> Division,Jamtara.


OFFICE OF THE EXECUTIVE ENGINEER<br />

ROAD DIVISION,JAMTARA(JHARKHAND)<br />

SPECIAL CONDITION<br />

1. Tenderers must examine the site and the various aspect likely to affect the construction and cost<br />

and then quote with full knowledge of site conditions.<br />

2. The work must be carried out strictly as per P.W.D.& M.O.S.T., specification.<br />

3. All rates quoted on the tender should be for completed job including all carriage royalty, Sales<br />

tax, income tax and other taxes, the payment of which will be whole responsibility of the<br />

contractor.<br />

4 Rules laid down in Motors vehicle Act will have also to be followed if any vehicles are used by<br />

the contractor in <strong>Department</strong> works.<br />

5. Labour Rules fixed from time to time have also to be followed and quoted rates should include<br />

for all such items.<br />

6. Stone Chips, Stone metal, lime, bricks and jhama should be got approved by the Engineer-incharge<br />

before use. The contractor will have to remove all dust foreign materials and unapproved<br />

materials at his own cost.<br />

7. Tenderers have to made his complete arrangements for all accessories plants and machineries<br />

required for the execution of work.<br />

8. The Contractor shall not be entitled to claim any compensation for the loss suffered by him onaccount<br />

of (i) failure or delay by or on behalf of Govt. In the supply of materials of stores which<br />

the Govt. may have under taken (ii) natural calamities, (iii) transport and procurements<br />

difficulties,(iv) Circumstances beyond the control of Govt.<br />

9. <strong>Department</strong> materials should be used in works strictly in accordance with the actual requirement<br />

and for any differences the cost will be recovered at panel rates which will be double the issue<br />

rate. The contractor should also maintain proper accounts for such materials and should be in a<br />

position to submit the same when ever required.<br />

10. The Contractor will be full responsibility for watch and ward of the materials supplied by or to<br />

the <strong>Department</strong> and the materials will bne open to inspection by the <strong>Department</strong>al Officer No<br />

claim will be entertained in the case of theft, damages of materials at site till completion of the<br />

work.<br />

11. Contractors has to maintain necessary technical organisation for proper execution of works and<br />

should employ only such persons who arte skilled and experienced in the similar nature of works<br />

& the Executive Engineer shall be at liberty of object and enquire the contractor who in his<br />

opinion mis-conducts him self or is incompetent or neglegent in perfermens of his duties and<br />

such persons shall not be employed by the contractor without permission of the Executive<br />

Engineer.<br />

12. No Conditional tender will be accepted.<br />

13 Stone chips & Stone metal as per requirement will have to collected in full quantity in advance<br />

and stacked as per direction of E/I and be verified before consumption in be the work.<br />

14. Leveling dressing and clearing of the site will be done after completion of works as per direction<br />

of Engineer-in-Charge.<br />

15. Empty drums shall be returned by the contractor to the <strong>Department</strong> in good condition at P.W.D.<br />

Godown at their own cost. In case of loss of empty drums the cost will be recovered from the<br />

contractor @ Rs 160.00 per drum & for empty cement bags @ Rs 3.00 per bag.<br />

16. The letters sent to the contractor at the address give in the agreement and returned undelivered<br />

will be treated as to have been served.<br />

17. The Contractor invariably in all kinds of works will have to maintain a site order book at his<br />

own cost duly certified by the S.D.O. or Executive Engineer. The site order book should always<br />

be kept at site and should be produced properly when demanded by inspecting officer for loss of<br />

the book the contractor will be wholly responsible.<br />

18. Entries in the site order Book will not be made by any officer les then the rank of S.D.O.,R.C.D<br />

But the site order book will be the property of the department.<br />

19. Any addition or alteration in the work must be done under the order of competent authority for<br />

which contractor should get order written on order book duly certified by Gazetted officer of the<br />

<strong>Department</strong>. the site order book should always be kept at the work sites.<br />

20. Royalty and cess will be recovered from each on account bill in case contractor will fail to<br />

produce royalty clearance certificate at this time of passing of bills.


21. The value of work to be done should not exceed the agreement amount without the proper<br />

permission of the competent authority.<br />

22. Payment will be made subject to the availability of fund.<br />

23. It the contractor supply boulder, stone metal moorum gravel, bricks etc from less distance than<br />

those mentioned in the Bill of quantity then their rates will be reduced proportionately on basis<br />

of the approved rate of the contractor if the contractors are required to supply the materials from<br />

longer distance then prior approved of the officer who has approved the tender shall have to be<br />

obtained.<br />

24. In case of sectional measurement of earth work, the initial long and cross section of existing<br />

ground will be taken by the <strong>Department</strong>al officer in presence of the contractor of their<br />

authorized agent and graphs papers will be prepared showing existing ground level and<br />

proposed formation level which with also from part of the agreement the section plotted on<br />

graphs will entered in measurement book and the contractor will have to sign both the graphs<br />

sheets and measurement book for taken of his acceptance before commencement of the work.<br />

25. Earth work in filling be dones in the layers not exceeding 225mm layers. The surface of the unrolled<br />

earth will be made as per designed grades and cross section after breaking the coldness to<br />

the maximum size of 63mm rolling will be done after censuring that the earth to be rolled have<br />

moisture content within the permissible limit of the optimum moisture content. The subsequent<br />

layer of earth on the roller surface will be put only after ensuring that the earth roller has<br />

achieved the designed density at the designed moisture content. In order to ensure the proper<br />

compaction the test result of the compaction will have to be get seen by the Engineer-in-Charge<br />

of the work or his authorized representative.<br />

26. The Item of roller and competion includes the work of breaking the clouds to a maximum to 63<br />

mm, cube and placing the earth in layers not exceeding 225 mm thick and shaping and dressing<br />

the earth in required grades and profile.<br />

27. The deduction of sale tax will be made from the contractor bill as per order of Jharkhand Govt.<br />

from time to time (Conlained in Bihar F.D.(Coml. taxes) No.2138 dt.19-1-84 will be binding on<br />

the contractor.)<br />

28. The rate quoted less than 15% of estimated cost including Government materials will not be<br />

entertained & the rate to be quoted after decimal point should but not more than two digits.<br />

29. In case of tender filled by registered firm of company character certificate should be enclosed of<br />

all members.<br />

30. Quantities given in Bill of quantity are subject to variation and no claim of this score will be<br />

entertained.<br />

31. All other terms an conditions contained in vigilance department letter no.1/Est.27/83-2347<br />

T.E.C., Patna dt. 31.12.83 will be binding on the contractors.<br />

32. Vide Engr.-in – Chief Memo No. 2553 (E) dt. 4-5-90 the supply of Materials of different sizes<br />

and grated should be stacked at work site with proper size and for which no claim will be<br />

entertained.<br />

Mode of Measurement:<br />

Stone Chips & Moorum - 1.5 M x 1.5 M x 0.45 M<br />

To be taken to 1 M 3<br />

Stone Metal Grade-I 1.5 M x 1.5 M x 0.55 M<br />

To be taken to 1 M 3<br />

Stone Metal Gr.-II & III 1.5 M x 1.5 M x 0.52 M<br />

Should be taken to 1 M 3<br />

33. For mantaining temperature Every agency must have their own rate thermometer during the<br />

execution of bitumen work.<br />

34. The contractor will be responsible for making good to the <strong>Road</strong>/Bridge/Culvert repaired by him<br />

of any damage or failure occurs in the road on his own cost up to period of one years………….<br />

From the date of completion.<br />

35. Contractor must have to be establish a quality control laboratory at the work site at his own cost.<br />

As per direction of MOST & Quality Control. The Agency will have to submit time to time the<br />

quality control test reports of the materials and the work done with the bill.<br />

36. Payment will be done only after finding Satisfactory test reports of the work done.<br />

37. Agreement for work will be done after acquisition of land for purpose approach road.<br />

Executive Engineer,<br />

R.C.D.,<strong>Road</strong> Division,Jamtara


dk;Zikyd vfHk;ark dk dk;kZy;]<br />

iFk fuekZ.k foHkkx] iFk izeaMy] tkerkM+kA<br />

fufonk vkea=.k lwpuk<br />

1- foKkiunkrk dk uke %& dk;Zikyd vfHk;ark]<br />

iFk fuekZ.k foHkkx]iFk izeaMy] tkerkM+k A<br />

2- ifjek.k foi= dh fodzh dh frfFk ,oa le;%& fnukad 02-12-10 ]3-00 cts vijkgu~<br />

rd<br />

3- fufonk izkfIr dh vafre frfFk ,oa le; % 03-12-10 ]3-00 cts vijkgu rd<br />

4- fufonk [kksyus dh frfFk ,oa le;%& fnukad 03-12-10 ] 3-30 cts<br />

vijkgu<br />

5- ifjek.k foi= fodzh dk LFkku %& 1- eq[; vfHk;ark ¼;k0½]iFk<br />

fuekZ.k foHkkx]<br />

dk dk;kZy; lh0,e0ih0Mh0vkbZ<br />

ifjlj dkWds] jksM] jkWaphA<br />

2- v/kh{k.k vfHk;ark ] iFk fuekZ.k<br />

foHkkx<br />

iFk vapy ] nqedk dk dk;kZy; A<br />

3- uxj Fkkuk ifjlj ]tkerkM+kA<br />

6-fufonk izkfIr ,oa [kksyus dk LFkku %& dzekad 5 esa n”kkZ;k x;s<br />

dk;kZy; esaA<br />

7-dk;Z dh fooj.kh fuEu izdkj gS%&<br />

dz0<br />

dk;Z dk uke izkDdfyr<br />

jkf”k<br />

¼:0 esa<br />

½<br />

vxz/ku<br />

dh jkf”k<br />

¼:0½<br />

Ikfjek.k<br />

foi= dk<br />

eqY;<br />

¼:0½<br />

dk;Z<br />

lekfIr<br />

dh<br />

vof/kA<br />

1 2 3 4 5 6<br />

1 Tkkek&tkerkM+k&:iukjk;.kiqj iFk ds<br />

fd0<br />

eh08688(600),89,90,91(500),93(500),94<br />

(500),95(500),96(500),97(500),98(500),<br />

99(500),100,101,102(500),103(400),rd<br />

lk/kkj.k ejeefr dk;ZA<br />

2 Tkkek&tkerkM+k&:iukjk;.kiqj iFk ds<br />

fd0 eh0 92 ,93(500), 95(500), 96(500),<br />

97(500), 98(500), 99(500), 102(500),<br />

103(500), 104(300) rd lrg uohdj.k<br />

dk;ZA<br />

3 eqxkZcuh&jktuxj&dq.Mfgr iFk esa<br />

fd0 eh0 iksLV xM+kbZ ,oa jaxkbZ<br />

fy[kkbZ dk;Z A¼foosdk/khu en ls½<br />

1173369-<br />

00<br />

8330883-<br />

00<br />

23500-<br />

00<br />

167000-<br />

00<br />

2500-<br />

00<br />

10000-<br />

00<br />

35 fnu<br />

45 fnu<br />

61520-00 1300-00 500-00 45 fnu<br />

8- ifjek.k foi= ds dz; gsrq vkosnu i= ds lkFk iFk fuekZ.k foHkkx ds leqfpr Js.kh esa<br />

fuca/ku Js.kh esa fuca/ku izek.k&i= ] v|ru vk;dj lQk;k izek.k i= ] okf.kT; dj fuca/ku<br />

izek.k i=] v|ru Je okf.kT; dj lQk;k izek.k i= ] v|ru Je vuqKfIr ] v|ru pfj= izek.k i= dh Nk;k<br />

izfr ¼vfHkizekf.kr½ ,oa ifjek.k foi= dk eqY; ¼tks yksVk;k ugha tk;sxk½ ds lerqY; cSad


MªkIV tks dk;Zikyd vfHk;ark ] iFk fuekZ.k foHkkx] iFk izeaMy] tkerkM+k ds inuke ls<br />

Hkkjrh; LVsV cSad] tkerkM+k esa gh Hkqxrs; gks] dks layXu djuk vfuok;Z gksxk A<br />

9- fufonk dh vU; fo”ks’k “kRrsZ fufonk i= ds lkFk layXu jgsxk tks fufonnkrkvksa dks<br />

ekU; gksxh A<br />

10-fcuk dkj.k crk;s foHkkx dks fdlh ;k lHkh fufonk dks j} djus @ LFkfxr djus dk vf/kdkj<br />

lqjf{kr gSA<br />

11-fufonknkrk }kjk ifjek.k foi= esa ;Fkk vafdr jkf”k ds vuqlkj fufonk vfHkys[k ds lkFk<br />

N% o’khZ; cpr izek.k i= ¼8okW fuxZe½ ;k ikWp o’khZ; Mkd/kj lkof/k tek ] tks >kj[kaM<br />

jkT; ds fdlh Hkh Mkd/kj ls fuxZr gks ] ds :Ik esa dk;Zikyd vfHk;ark ] iFk fuekZ.k<br />

foHkkx] iFk izeaMy] tkerkM+k ds inuke ls fof/kor izfrKIr djk dj tek djuk vfuok;Z gksxk<br />

A<br />

12-fufonk fu’iknu ds ,d lIrkg ds vUnj laosnd dks ,djkjukek djds dk;Z izkjaHk dj nsuk<br />

vfuok;Z gksxk A vU;Fkk nqljs U;wure nj nkrk dks dk;Z vkoafVr dj fn;k tk;sxk A<br />

13-“krZ;qDr fufonk ekU; ugha gksxh A<br />

14-fufonkdkj ftu dk;Z ds fy, fufonk ns jgs gS os Loa; LFkyh; fLFkrh ns[kdj larq’V<br />

gksus ds ckn gh fufonk nj vafdr djsa A ckn esa dksbZ Hkh nkok ekU; ugh gksxk A<br />

15-izkDdfyr jkf”k /kV c


23-fdlh dkj.ko”k fcdzh ,oa izkfIr dh frfFk dks vodk”k /kksf’kr gksus ij dze”k% vxys dk;Z<br />

fnol dks fcdzh ,oa izkfIr dh frfFk c