Bill of Quantity<br />
Name of work :- M/R to Jama-Jamtatra-Rupnarainpur <strong>Road</strong> from<br />
86 88(600),89,90,91(500),93(500),94(500),95(500),96(500),<br />
97(500),98(500),99(500),100,101,102(500),103(400), Km.<br />
for the Year 10-11.<br />
OFFICE OF THE EXECUTIVE ENGINEER,<br />
ROAD CONSTRUCTION DEPARTMENT,JHARKHAND<br />
ROAD DIVISON,JAMTAA.
Tender paper for filling rates by the tenderes on the basis of enclosed approved bill of<br />
quantity for the work of M/R to Jama-Jamtatra-Rupnarainpur <strong>Road</strong> from 86<br />
,87,88(600),89,90,91(500),93(500),94(500),95(500),96(500),97(500),98(500),99(500),100,<br />
101,102(500),103(400), Km. for the Year 10-11.<br />
1.Estimated Cost:- Rs. 1173369.00<br />
2.Amount of E.M. to be deposited:- Rs. 23500.00<br />
3.Cost of bill of Quantity:- Rs. 2500.00<br />
4.Time of Completion:- 35 Days<br />
5.Last Date of sale of bill of Quantity:- 02.12.10 up to 3.00 P.M.<br />
6.Date & time of receiving tender:- 03.12.10 up to 3.00 P.M.<br />
7.Date & time of Opening the tender:- 03.12.10 At. 3.30 P.M<br />
8.Authority receiving tender:-<br />
C.E. (C) S.E. E.E. A.E.,R.C.D.,<br />
R.C.D., Ranchi R.C.D., Dumka R.C.D., Jamtara Jamtara / Nala /Masalia<br />
9.Tenderer is to quote his rate on percentage basic of enclosed bill of quantity rates both in<br />
words & figures in the noted columns (Note:- Cross (X) below the other rates which does<br />
not apply him.<br />
10.<br />
Percentage above the<br />
enclosed B.O.Q. Rates<br />
on all item of work<br />
(i) In figure:-<br />
(ii)In words:-<br />
11.Issued to Sri ……………………….<br />
12.Name & Complete postal address of<br />
tenderer:-<br />
13.Registration Number:-<br />
14.Amount of E.M. deposited by the<br />
tenderer in shape of :-<br />
15.Time of Completion as quoted by the<br />
tenderer:-<br />
16.Whether T.C.C., I.T.C., enclosed on<br />
not.:-<br />
17.Labour Registration on number:-<br />
18.Total number of sheets tender sheet<br />
including this sheet submitted by<br />
the tenderer :-<br />
Percentage below the<br />
enclosed B.O.Q. rates on<br />
all item of work<br />
At the enclosed bill<br />
of quantity rates on<br />
all item.<br />
REMARKS<br />
Date, Sign. of tenderer. Executive Engineer ,<br />
R.C.D., <strong>Road</strong> Division,<br />
Jamtara.
BOQ for ordinary repair for M/R to Jama-Jamtatra-Rupnarainpur <strong>Road</strong> from 86 ,87,<br />
88(600),89,90,91(500),93(500),94(500),95(500),96(500),97(500),98(500),99(500),100,101,<br />
102(500),103(400), Km. for the Year 10-11.<br />
Sl.No Item of work Quantity Unit Rate<br />
1 2 3 4 5<br />
1 Providing stone metal grade-III (53mm to<br />
22.4mm size) with screening materials<br />
crushable type such as moorum in road<br />
embankment in proper grade camber<br />
superelevation lead loose in thickness (1.33<br />
times the desired completed thickness)<br />
complete by soil road roller with cost of wagte<br />
all lead & lift including hire charge road roller all<br />
complete job and as per direction of E/I.<br />
K.M. 86,87,93,94,95 96.37 M 3 1392.70<br />
2 Providing 50mm thick compacted built up spray<br />
grout over W.B.M. surface in proper grade<br />
,camber and superelevation with stone metal<br />
grade -III (53mm to 22.4mm size)@ 0.66M 3 and<br />
screening type B(10mm size) @0.13M 3 and<br />
bitumen @25 Kg. (including tack coat @10 Kg.)<br />
all per 10M 2 surface including cost of cleaning<br />
the surface properly with iron brush and broom<br />
,cost of heating bitumen to required temp. with<br />
cost of fuel, rolling, providing light, barrier,<br />
danger signal, chowkidar, returning the empty<br />
bitumen drums in good condition to the<br />
godown and hire charge of roller as per<br />
specification and direction of E/I.(with packed<br />
bitumen)<br />
K.M. 86,87,93,94,95 1285.00 M 2 181.90<br />
3 Providing 50mm thick compacted built up spray<br />
grout over bitumenous(old) surface in proper<br />
grade ,camber and superelevation with stone<br />
metal grade -III (20mm to 37mm size)@ 0.66M3<br />
key stone or screening materials of size 12mm<br />
ungraded @ 0.13 M3and bitumen @20 Kg.<br />
(including tack coat @5 Kg.) all per 10M2<br />
surface including cost of cleaning the surface<br />
properly with iron brush and broom ,cost of<br />
heating bitumen to required temp. with cost of<br />
fuel ,rolling,providing light,barrier,danger<br />
signal,chowkidar,returning the empty bitumen<br />
drums in good condition to the godown and hire<br />
charge of roller as per specification and
direction of E/I.(with packd bitumen)<br />
K.M.<br />
86,87,88,89,90,91,93,94,95,96,97,98,99,100,102,103 2285.57<br />
M2 162.72<br />
Sl.No Item of work Quantity Unit Rate<br />
1 2 3 4 5<br />
4 Providing 20mm. Thick open graded premix<br />
carpet over bitumenous surface in proper grade<br />
.camber and superelevation with stone chips of<br />
13.2mm and 11.2mm size in ratio of (2:1) @<br />
0.27M 3 and bitumen @ 19.6Kg. Including tack<br />
coat @ 5Kg. All per 10 M 2 surface including cost<br />
of cleaning the surface properly with iron brush<br />
and broom ,cost of heating bitumen to required<br />
temp. with cost of fuel,rolling,providing<br />
light,barrier,danger signal,chowkidar,returning<br />
the empty bitumen drums in good condition to<br />
the godown and hire charge of roller as per<br />
specification and direction of E/I.<br />
K.M.<br />
86,87,88,89,90,91,93,94,95,96,97,98,99,100,102,103 3641.98<br />
M2 119.03<br />
Executive Engineer,<br />
R.C.D.,<strong>Road</strong> Division,Jamtara
OFFICE OF THE EXECUTIVE ENGINEER<br />
ROAD DIVISION,JAMTARA(JHARKHAND)<br />
SPECIAL CONDITION<br />
1. Tenderers must examine the site and the various aspect likely to affect the construction and cost<br />
and then quote with full knowledge of site conditions.<br />
2. The work must be carried out strictly as per P.W.D.& M.O.S.T., specification.<br />
3. All rates quoted on the tender should be for completed job including all carriage royalty, Sales<br />
tax, income tax and other taxes, the payment of which will be whole responsibility of the<br />
contractor.<br />
4 Rules laid down in Motors vehicle Act will have also to be followed if any vehicles are used by<br />
the contractor in <strong>Department</strong> works.<br />
5. Labour Rules fixed from time to time have also to be followed and quoted rates should include<br />
for all such items.<br />
6. Stone Chips, Stone metal, lime, bricks and jhama should be got approved by the Engineer-incharge<br />
before use. The contractor will have to remove all dust foreign materials and unapproved<br />
materials at his own cost.<br />
7. Tenderers have to made his complete arrangements for all accessories plants and machineries<br />
required for the execution of work.<br />
8. The Contractor shall not be entitled to claim any compensation for the loss suffered by him onaccount<br />
of (i) failure or delay by or on behalf of Govt. In the supply of materials of stores which<br />
the Govt. may have under taken (ii) natural calamities, (iii) transport and procurements<br />
difficulties,(iv) Circumstances beyond the control of Govt.<br />
9. <strong>Department</strong> materials should be used in works strictly in accordance with the actual requirement<br />
and for any differences the cost will be recovered at panel rates which will be double the issue<br />
rate. The contractor should also maintain proper accounts for such materials and should be in a<br />
position to submit the same when ever required.<br />
10. The Contractor will be full responsibility for watch and ward of the materials supplied by or to<br />
the <strong>Department</strong> and the materials will bne open to inspection by the <strong>Department</strong>al Officer No<br />
claim will be entertained in the case of theft, damages of materials at site till completion of the<br />
work.<br />
11. Contractors has to maintain necessary technical organisation for proper execution of works and<br />
should employ only such persons who arte skilled and experienced in the similar nature of works<br />
& the Executive Engineer shall be at liberty of object and enquire the contractor who in his<br />
opinion mis-conducts him self or is incompetent or neglegent in perfermens of his duties and<br />
such persons shall not be employed by the contractor without permission of the Executive<br />
Engineer.<br />
12. No Conditional tender will be accepted.<br />
13 Stone chips & Stone metal as per requirement will have to collected in full quantity in advance<br />
and stacked as per direction of E/I and be verified before consumption in be the work.<br />
14. Leveling dressing and clearing of the site will be done after completion of works as per direction<br />
of Engineer-in-Charge.<br />
15. Empty drums shall be returned by the contractor to the <strong>Department</strong> in good condition at P.W.D.<br />
Godown at their own cost. In case of loss of empty drums the cost will be recovered from the<br />
contractor @ Rs 160.00 per drum & for empty cement bags @ Rs 3.00 per bag.<br />
16. The letters sent to the contractor at the address give in the agreement and returned undelivered<br />
will be treated as to have been served.<br />
17. The Contractor invariably in all kinds of works will have to maintain a site order book at his<br />
own cost duly certified by the S.D.O. or Executive Engineer. The site order book should always<br />
be kept at site and should be produced properly when demanded by inspecting officer for loss of<br />
the book the contractor will be wholly responsible.
18. Entries in the site order Book will not be made by any officer les then the rank of S.D.O.,R.C.D<br />
But the site order book will be the property of the department.<br />
19. Any addition or alteration in the work must be done under the order of competent authority for<br />
which contractor should get order written on order book duly certified by Gazetted officer of the<br />
<strong>Department</strong>. the site order book should always be kept at the work sites.<br />
20. Royalty and cess will be recovered from each on account bill in case contractor will fail to<br />
produce royalty clearance certificate at this time of passing of bills.<br />
21. The value of work to be done should not exceed the agreement amount without the proper<br />
permission of the competent authority.<br />
22. Payment will be made subject to the availability of fund.<br />
23. It the contractor supply boulder, stone metal moorum gravel, bricks etc from less distance than<br />
those mentioned in the Bill of quantity then their rates will be reduced proportionately on basis<br />
of the approved rate of the contractor if the contractors are required to supply the materials from<br />
longer distance then prior approved of the officer who has approved the tender shall have to be<br />
obtained.<br />
24. In case of sectional measurement of earth work, the initial long and cross section of existing<br />
ground will be taken by the <strong>Department</strong>al officer in presence of the contractor of their<br />
authorized agent and graphs papers will be prepared showing existing ground level and<br />
proposed formation level which with also from part of the agreement the section plotted on<br />
graphs will entered in measurement book and the contractor will have to sign both the graphs<br />
sheets and measurement book for taken of his acceptance before commencement of the work.<br />
25. Earth work in filling be dones in the layers not exceeding 225mm layers. The surface of the unrolled<br />
earth will be made as per designed grades and cross section after breaking the coldness to<br />
the maximum size of 63mm rolling will be done after censuring that the earth to be rolled have<br />
moisture content within the permissible limit of the optimum moisture content. The subsequent<br />
layer of earth on the roller surface will be put only after ensuring that the earth roller has<br />
achieved the designed density at the designed moisture content. In order to ensure the proper<br />
compaction the test result of the compaction will have to be get seen by the Engineer-in-Charge<br />
of the work or his authorized representative.<br />
26. The Item of roller and competion includes the work of breaking the clouds to a maximum to 63<br />
mm, cube and placing the earth in layers not exceeding 225 mm thick and shaping and dressing<br />
the earth in required grades and profile.<br />
27. The deduction of sale tax will be made from the contractor bill as per order of Jharkhand Govt.<br />
from time to time (Conlained in Bihar F.D.(Coml. taxes) No.2138 dt.19-1-84 will be binding on<br />
the contractor.)<br />
28. The rate quoted less than 15% of estimated cost including Government materials will not be<br />
entertained & the rate to be quoted after decimal point should but not more than two digits.<br />
29. In case of tender filled by registered firm of company character certificate should be enclosed of<br />
all members.<br />
30. Quantities given in Bill of quantity are subject to variation and no claim of this score will be<br />
entertained.<br />
31. All other terms an conditions contained in vigilance department letter no.1/Est.27/83-2347<br />
T.E.C., Patna dt. 31.12.83 will be binding on the contractors.<br />
32. Vide Engr.-in – Chief Memo No. 2553 (E) dt. 4-5-90 the supply of Materials of different sizes<br />
and grated should be stacked at work site with proper size and for which no claim will be<br />
entertained.<br />
Mode of Measurement:<br />
Stone Chips & Moorum - 1.5 M x 1.5 M x 0.45 M<br />
To be taken to 1 M 3<br />
Stone Metal Grade-I 1.5 M x 1.5 M x 0.55 M<br />
To be taken to 1 M 3<br />
Stone Metal Gr.-II & III 1.5 M x 1.5 M x 0.52 M<br />
Should be taken to 1 M 3<br />
33. For mantaining temperature Every agency must have their own rate thermometer during the<br />
execution of bitumen work.<br />
34. The contractor will be responsible for making good to the <strong>Road</strong>/Bridge/Culvert repaired by him<br />
of any damage or failure occurs in the road on his own cost up to period of one years………….<br />
From the date of completion.
35. Contractor must have to be establish a quality control laboratory at the work site at his own cost.<br />
As per direction of MOST & Quality Control. The Agency will have to submit time to time the<br />
quality control test reports of the materials and the work done with the bill.<br />
36. Payment will be done only after finding Satisfactory test reports of the work done.<br />
37. Agreement for work will be done after acquisition of land for purpose approach road.<br />
Executive Engineer,<br />
R.C.D.,<strong>Road</strong> Division,Jamtara<br />
dk;Zikyd vfHk;ark dk dk;kZy;]<br />
iFk fuekZ.k foHkkx] iFk izeaMy] tkerkM+kA<br />
fufonk vkea=.k lwpuk<br />
1- foKkiunkrk dk uke %& dk;Zikyd vfHk;ark]<br />
iFk fuekZ.k foHkkx]iFk izeaMy] tkerkM+k A<br />
2- ifjek.k foi= dh fodzh dh frfFk ,oa le;%& fnukad 02-12-10 ]3-00 cts vijkgu~<br />
rd<br />
3- fufonk izkfIr dh vafre frfFk ,oa le; % 03-12-10 ]3-00 cts vijkgu rd<br />
4- fufonk [kksyus dh frfFk ,oa le;%& fnukad 03-12-10 ] 3-30 cts<br />
vijkgu<br />
5- ifjek.k foi= fodzh dk LFkku %& 1- eq[; vfHk;ark ¼;k0½]iFk<br />
fuekZ.k foHkkx]<br />
dk dk;kZy; lh0,e0ih0Mh0vkbZ<br />
ifjlj dkWds] jksM] jkWaphA<br />
2- v/kh{k.k vfHk;ark ] iFk fuekZ.k<br />
foHkkx<br />
iFk vapy ] nqedk dk dk;kZy; A<br />
3- uxj Fkkuk ifjlj ]tkerkM+kA<br />
6-fufonk izkfIr ,oa [kksyus dk LFkku %& dzekad 5 esa n”kkZ;k x;s<br />
dk;kZy; esaA<br />
7-dk;Z dh fooj.kh fuEu izdkj gS%&<br />
dz0<br />
dk;Z dk uke izkDdfyr<br />
jkf”k<br />
¼:0 esa<br />
½<br />
vxz/ku<br />
dh jkf”k<br />
¼:0½<br />
Ikfjek.k<br />
foi= dk<br />
eqY;<br />
¼:0½<br />
dk;Z<br />
lekfIr<br />
dh<br />
vof/kA<br />
1 2 3 4 5 6<br />
1 Tkkek&tkerkM+k&:iukjk;.kiqj iFk ds<br />
fd0<br />
eh08688(600),89,90,91(500),93(500),94<br />
(500),95(500),96(500),97(500),98(500),<br />
99(500),100,101,102(500),103(400),rd<br />
lk/kkj.k ejeefr dk;ZA<br />
2 Tkkek&tkerkM+k&:iukjk;.kiqj iFk ds<br />
fd0 eh0 92 ,93(500), 95(500), 96(500),<br />
97(500), 98(500), 99(500), 102(500),<br />
103(500), 104(300) rd lrg uohdj.k<br />
dk;ZA<br />
1173369-<br />
00<br />
8330883-<br />
00<br />
23500-<br />
00<br />
167000-<br />
00<br />
2500-<br />
00<br />
10000-<br />
00<br />
35 fnu<br />
45 fnu<br />
3 eqxkZcuh&jktuxj&dq.Mfgr iFk esa 61520-00 1300-00 500-00 45 fnu
fd0 eh0 iksLV xM+kbZ ,oa jaxkbZ<br />
fy[kkbZ dk;Z A¼foosdk/khu en ls½<br />
8- ifjek.k foi= ds dz; gsrq vkosnu i= ds lkFk iFk fuekZ.k foHkkx ds leqfpr Js.kh esa<br />
fuca/ku Js.kh esa fuca/ku izek.k&i= ] v|ru vk;dj lQk;k izek.k i= ] okf.kT; dj fuca/ku<br />
izek.k i=] v|ru Je okf.kT; dj lQk;k izek.k i= ] v|ru Je vuqKfIr ] v|ru pfj= izek.k i= dh Nk;k<br />
izfr ¼vfHkizekf.kr½ ,oa ifjek.k foi= dk eqY; ¼tks yksVk;k ugha tk;sxk½ ds lerqY; cSad<br />
MªkIV tks dk;Zikyd vfHk;ark ] iFk fuekZ.k foHkkx] iFk izeaMy] tkerkM+k ds inuke ls<br />
Hkkjrh; LVsV cSad] tkerkM+k esa gh Hkqxrs; gks] dks layXu djuk vfuok;Z gksxk A<br />
9- fufonk dh vU; fo”ks’k “kRrsZ fufonk i= ds lkFk layXu jgsxk tks fufonnkrkvksa dks<br />
ekU; gksxh A<br />
10-fcuk dkj.k crk;s foHkkx dks fdlh ;k lHkh fufonk dks j} djus @ LFkfxr djus dk vf/kdkj<br />
lqjf{kr gSA<br />
11-fufonknkrk }kjk ifjek.k foi= esa ;Fkk vafdr jkf”k ds vuqlkj fufonk vfHkys[k ds lkFk<br />
N% o’khZ; cpr izek.k i= ¼8okW fuxZe½ ;k ikWp o’khZ; Mkd/kj lkof/k tek ] tks >kj[kaM<br />
jkT; ds fdlh Hkh Mkd/kj ls fuxZr gks ] ds :Ik esa dk;Zikyd vfHk;ark ] iFk fuekZ.k<br />
foHkkx] iFk izeaMy] tkerkM+k ds inuke ls fof/kor izfrKIr djk dj tek djuk vfuok;Z gksxk<br />
A<br />
12-fufonk fu’iknu ds ,d lIrkg ds vUnj laosnd dks ,djkjukek djds dk;Z izkjaHk dj nsuk<br />
vfuok;Z gksxk A vU;Fkk nqljs U;wure nj nkrk dks dk;Z vkoafVr dj fn;k tk;sxk A<br />
13-“krZ;qDr fufonk ekU; ugha gksxh A<br />
14-fufonkdkj ftu dk;Z ds fy, fufonk ns jgs gS os Loa; LFkyh; fLFkrh ns[kdj larq’V<br />
gksus ds ckn gh fufonk nj vafdr djsa A ckn esa dksbZ Hkh nkok ekU; ugh gksxk A<br />
15-izkDdfyr jkf”k /kV c
21- fufonkrk dh “kkrZ www.jharkhand.gov.in ls Bid Document download dj Hkh fufonk<br />
tek dj ldrs gS ,oa bldk ewY; vyx funsf”kr Lo:Ik esa ls fufonk Mkyrs le; tek djsxsaA<br />
22-fufonk dh “krksa dks www.jharkhand.gov.in ,oa v/kksgLrk{kjh ] dk;kZy; ds lwpuk iV~<br />
ij ns[kk tk ldrk gSA<br />
23-fdlh dkj.ko”k fcdzh ,oa izkfIr dh frfFk dks vodk”k /kksf’kr gksus ij dze”k% vxys dk;Z<br />
fnol dks fcdzh ,oa izkfIr dh frfFk c
Bill of Quantity<br />
Name of work :- Surface renewal to Jama-Jamtatra- Rupnarainpur<br />
<strong>Road</strong> from 92 ,93(500), 95(500), 96(500), 97(500),<br />
98(500), 99(500), 102(500), 103(500), 104(300) K.M<br />
for the Year 10-11<br />
OFFICE OF THE EXECUTIVE ENGINEER,<br />
ROAD CONSTRUCTION DEPARTMENT,JHARKHAND<br />
ROAD DIVISON,JAMTAA.<br />
Tender paper for filling rates by the tenderes on the basis of enclosed approved bill of<br />
quantity for the work of Surface renewal to Jama-Jamtatra- Rupnarainpur <strong>Road</strong> from 92<br />
,93(500), 95(500), 96(500), 97(500), 98(500), 99(500), 102(500), 103(500), 104(300) for the<br />
Year 10-11<br />
1.Estimated Cost:- Rs. 8330883.00<br />
2.Amount of E.M. to be deposited:- Rs. 167000.00<br />
3.Cost of bill of Quantity:- Rs. 10000.00<br />
4.Time of Completion:- 45 Days<br />
5.Last Date of sale of bill of Quantity:- 02.12.10 up to 3.00 P.M.<br />
6.Date & time of receiving tender:- 03.12.10 up to 3.00 P.M.<br />
7.Date & time of Opening the tender:- 03.12.10 At. 3.30 P.M<br />
8.Authority receiving tender:-<br />
C.E. (C) S.E. E.E. A.E.,R.C.D.,<br />
R.C.D., Ranchi R.C.D., Dumka R.C.D., Jamtara Jamtara / Nala /Masalia<br />
9.Tenderer is to quote his rate on percentage basic of enclosed bill of quantity rates both in<br />
words & figures in the noted columns (Note:- Cross (X) below the other rates which does<br />
not apply him.
10.<br />
Percentage above the<br />
enclosed B.O.Q. Rates<br />
on all item of work<br />
(i) In figure:-<br />
(ii)In words:-<br />
11.Issued to Sri ……………………….<br />
12.Name & Complete postal address of<br />
tenderer:-<br />
13.Registration Number:-<br />
14.Amount of E.M. deposited by the<br />
tenderer in shape of :-<br />
15.Time of Completion as quoted by the<br />
tenderer:-<br />
16.Whether T.C.C., I.T.C., enclosed on<br />
not.:-<br />
17.Labour Registration on number:-<br />
18.Total number of sheets tender sheet<br />
including this sheet submitted by<br />
the tenderer :-<br />
Percentage below the<br />
enclosed B.O.Q. rates on<br />
all item of work<br />
At the enclosed bill<br />
of quantity rates on<br />
all item.<br />
REMARKS<br />
Date, Sign. of tenderer. Executive Engineer ,<br />
R.C.D., <strong>Road</strong> Division,<br />
Jamtara.
BOQ For Surface renewal to Jama-Jamtatra- Rupnarainpur <strong>Road</strong> from 92<br />
,93(500), 95(500), 96(500), 97(500), 98(500), 99(500), 102(500), 103(500),<br />
104(300) for the Year 10-11<br />
Sl.No Item of work Quantity Unit Rate<br />
1 2 3 4 5<br />
1<br />
6.3.22(a)<br />
Providing 50mm thick compacted built<br />
up spray grout over bitumenous(old)<br />
surface in proper grade ,camber and<br />
superelevation with stone metal grade<br />
-III (20mm to 37mm size)@ 0.66M3 key<br />
stone or screening materials of size<br />
12mm ungraded @ 0.13 M3and<br />
bitumen @20 Kg. (including tack coat<br />
@5 Kg.) all per 10M2 surface including<br />
cost of cleaning the surface properly<br />
with iron brush and broom ,cost of<br />
heating bitumen to required temp.<br />
with cost of fuel ,rolling,providing<br />
light,barrier,danger<br />
signal,chowkidar,returning the empty<br />
bitumen drums in good condition to<br />
the godown and hire charge of roller as<br />
per specification and direction of<br />
E/I.(with packd bitumen)<br />
92,93,95,96,97,98,99,102,103,104 4991.00<br />
M2<br />
163.22<br />
2<br />
NH 5.2<br />
Providing and applying tack coat with<br />
bitumen emulsion using emulsion<br />
pressure distributor at the rate of 0.20<br />
kg per sqm on the prepared<br />
bituminous/granular surface cleaned<br />
with mechanical broom.<br />
92,93,95,96,97,98,99,102,103,104 38213.00 M 2 7.17<br />
3<br />
NH 7(ii)<br />
Providing and laying 25mm thick semi<br />
dense bituminous concrete with 100-<br />
120 TPH batch type HMP producing an<br />
average output of 75 tones per hour<br />
using crushed aggregates of specified<br />
grading, premixed with bituminous<br />
binder @ 4.5 to 5 per cent of mix and<br />
filler, transporting the hot mix to work<br />
site, laying with a hydrostatic paver<br />
finisher with sensor control to the<br />
required grade, level and alignment,<br />
rolling with smooth wheeled, vibratory<br />
and tandem rollers to achieve the<br />
desired compaction as per MoRTH
specification clause No. 508 complete<br />
in all respects<br />
92,93,95,96,97,98,99,102,103,104 955.325 M 3 7130.40<br />
Sl.No Item of work Quantity Unit Rate<br />
1 2 3 4 5<br />
4<br />
6.1.02<br />
5<br />
6.1.14<br />
6<br />
6.4.5<br />
Earth work in road embankment and<br />
shoulders with ordinary soil (vide<br />
classification of soil item-A) obtained<br />
from borrow pits or any other source<br />
free from logs,slumps,roots,rubbish or<br />
any other ingredients likely to<br />
deteriorate or effect the stability of the<br />
embankment including breaking the<br />
clods maximum to 60mm. cube<br />
,placing the earth in layers not<br />
exceeding 225mm in loose<br />
thickness,rough dressing,including cost<br />
of cutting and removing shrubs and<br />
roots falling in borrow area,all<br />
complete as per approved<br />
design,specification and direction of<br />
E/I.<br />
92,93,95,96,97,98,99,102,103,104 2440.00 M 3 36.10<br />
Rolling and compaction of road<br />
embankment in all kinds of soil<br />
including hard gravelly soil mixed with<br />
boulders by road roller in layers not<br />
exceeding 225mm.in loose thickness<br />
do to achieve 90 to 95% maximum dry<br />
density of O.M.C. uniformly including<br />
mixing of requried quantity of water<br />
including cost of supply and carriage of<br />
water with all leads and lifts,finishing<br />
the surface to proper grade,camber or<br />
superelevation including cost of hire<br />
charges of road roller,providing light<br />
barriers danger signals,chowkidars all<br />
complete as per specification and<br />
direction of E/I.<br />
92,93,95,96,97,98,99,102,103,104 2440.00 M 3 9.65<br />
Providing and fixing at site perecast<br />
RCC (1:2:4) ordinary Km Post (350mm<br />
×250mm×1110) with 20 size stone<br />
aggregate and clean coarse sand fixing<br />
the post in cement concrete (1:4:8) all<br />
with 40mm approved quality or stone<br />
aggregagte and including cost<br />
shuttering,curing,carriage ,fiishing,<br />
making, platform icluding brending,<br />
bidin and cost of reinforcement all<br />
complete as I.R.C. specification and<br />
direction of E/I.
Sl.No<br />
8 No.s 8 Each 1145.45<br />
Item of work<br />
Quantity<br />
Unit<br />
1 2 3 4 5<br />
7<br />
6.4.4<br />
8<br />
6.4.9<br />
9<br />
NH 8.3<br />
Providing and fixing at site perecast<br />
RCC (1:2:4) 5th Km Post (500mm<br />
×250mm×1525) with 20 size stone<br />
aggregate and clean coarse sand fixing<br />
the post in cement concrete (1:4:8) do<br />
all with 40mm approved quality or<br />
stone aggregagte and including cost<br />
shuttering,curing,carriage ,fiishing,<br />
making, platform icluding brending,<br />
bidin and cost of reinforcement all<br />
complete as I.R.C. specification and<br />
direction of E/I.<br />
Rate<br />
(a) 5th Km post 3.00 Each 1804.45<br />
Painting , Numbering and writing posts<br />
with two coats of enamel paints of<br />
approved shade and make after<br />
cleaning the surface thoroughly and<br />
writing with necessary information at<br />
site all complte as per I.R.C.<br />
specification and direction of E/I.<br />
Km post – 12 Nos. 12 Each 195.05<br />
5th Km post – 3 Nos.<br />
Providing & laying of hot applied<br />
thermoplastic compound 2.5 mm thick<br />
including refloctorised glass beads @<br />
250gms/sqm as per IRC-35 do do all<br />
complete job as per MOSRT & H Sp. C.I.<br />
No. 803 for center line marking<br />
(broken)<br />
3 Each 356.05<br />
92,93,95,96,97,98,99,102,103,104 800.00 M 2 376.00<br />
Executive Engineer,<br />
R.C.D.,<strong>Road</strong> Division,Jamtara
OFFICE OF THE EXECUTIVE ENGINEER<br />
ROAD DIVISION,JAMTARA(JHARKHAND)<br />
SPECIAL CONDITION<br />
1. Tenderers must examine the site and the various aspect likely to affect the construction and cost<br />
and then quote with full knowledge of site conditions.<br />
2. The work must be carried out strictly as per P.W.D.& M.O.S.T., specification.<br />
3. All rates quoted on the tender should be for completed job including all carriage royalty, Sales<br />
tax, income tax and other taxes, the payment of which will be whole responsibility of the<br />
contractor.<br />
4 Rules laid down in Motors vehicle Act will have also to be followed if any vehicles are used by<br />
the contractor in <strong>Department</strong> works.<br />
5. Labour Rules fixed from time to time have also to be followed and quoted rates should include<br />
for all such items.<br />
6. Stone Chips, Stone metal, lime, bricks and jhama should be got approved by the Engineer-incharge<br />
before use. The contractor will have to remove all dust foreign materials and unapproved<br />
materials at his own cost.<br />
7. Tenderers have to made his complete arrangements for all accessories plants and machineries<br />
required for the execution of work.<br />
8. The Contractor shall not be entitled to claim any compensation for the loss suffered by him onaccount<br />
of (i) failure or delay by or on behalf of Govt. In the supply of materials of stores which<br />
the Govt. may have under taken (ii) natural calamities, (iii) transport and procurements<br />
difficulties,(iv) Circumstances beyond the control of Govt.<br />
9. <strong>Department</strong> materials should be used in works strictly in accordance with the actual requirement<br />
and for any differences the cost will be recovered at panel rates which will be double the issue<br />
rate. The contractor should also maintain proper accounts for such materials and should be in a<br />
position to submit the same when ever required.<br />
10. The Contractor will be full responsibility for watch and ward of the materials supplied by or to<br />
the <strong>Department</strong> and the materials will bne open to inspection by the <strong>Department</strong>al Officer No<br />
claim will be entertained in the case of theft, damages of materials at site till completion of the<br />
work.<br />
11. Contractors has to maintain necessary technical organisation for proper execution of works and<br />
should employ only such persons who arte skilled and experienced in the similar nature of works<br />
& the Executive Engineer shall be at liberty of object and enquire the contractor who in his<br />
opinion mis-conducts him self or is incompetent or neglegent in perfermens of his duties and<br />
such persons shall not be employed by the contractor without permission of the Executive<br />
Engineer.<br />
12. No Conditional tender will be accepted.<br />
13 Stone chips & Stone metal as per requirement will have to collected in full quantity in advance<br />
and stacked as per direction of E/I and be verified before consumption in be the work.<br />
14. Leveling dressing and clearing of the site will be done after completion of works as per direction<br />
of Engineer-in-Charge.<br />
15. Empty drums shall be returned by the contractor to the <strong>Department</strong> in good condition at P.W.D.<br />
Godown at their own cost. In case of loss of empty drums the cost will be recovered from the<br />
contractor @ Rs 160.00 per drum & for empty cement bags @ Rs 3.00 per bag.<br />
16. The letters sent to the contractor at the address give in the agreement and returned undelivered<br />
will be treated as to have been served.<br />
17. The Contractor invariably in all kinds of works will have to maintain a site order book at his<br />
own cost duly certified by the S.D.O. or Executive Engineer. The site order book should always<br />
be kept at site and should be produced properly when demanded by inspecting officer for loss of<br />
the book the contractor will be wholly responsible.<br />
18. Entries in the site order Book will not be made by any officer les then the rank of S.D.O.,R.C.D<br />
But the site order book will be the property of the department.<br />
19. Any addition or alteration in the work must be done under the order of competent authority for<br />
which contractor should get order written on order book duly certified by Gazetted officer of the<br />
<strong>Department</strong>. the site order book should always be kept at the work sites.<br />
20. Royalty and cess will be recovered from each on account bill in case contractor will fail to<br />
produce royalty clearance certificate at this time of passing of bills.
21. The value of work to be done should not exceed the agreement amount without the proper<br />
permission of the competent authority.<br />
22. Payment will be made subject to the availability of fund.<br />
23. It the contractor supply boulder, stone metal moorum gravel, bricks etc from less distance than<br />
those mentioned in the Bill of quantity then their rates will be reduced proportionately on basis<br />
of the approved rate of the contractor if the contractors are required to supply the materials from<br />
longer distance then prior approved of the officer who has approved the tender shall have to be<br />
obtained.<br />
24. In case of sectional measurement of earth work, the initial long and cross section of existing<br />
ground will be taken by the <strong>Department</strong>al officer in presence of the contractor of their<br />
authorized agent and graphs papers will be prepared showing existing ground level and<br />
proposed formation level which with also from part of the agreement the section plotted on<br />
graphs will entered in measurement book and the contractor will have to sign both the graphs<br />
sheets and measurement book for taken of his acceptance before commencement of the work.<br />
25. Earth work in filling be dones in the layers not exceeding 225mm layers. The surface of the unrolled<br />
earth will be made as per designed grades and cross section after breaking the coldness to<br />
the maximum size of 63mm rolling will be done after censuring that the earth to be rolled have<br />
moisture content within the permissible limit of the optimum moisture content. The subsequent<br />
layer of earth on the roller surface will be put only after ensuring that the earth roller has<br />
achieved the designed density at the designed moisture content. In order to ensure the proper<br />
compaction the test result of the compaction will have to be get seen by the Engineer-in-Charge<br />
of the work or his authorized representative.<br />
26. The Item of roller and competion includes the work of breaking the clouds to a maximum to 63<br />
mm, cube and placing the earth in layers not exceeding 225 mm thick and shaping and dressing<br />
the earth in required grades and profile.<br />
27. The deduction of sale tax will be made from the contractor bill as per order of Jharkhand Govt.<br />
from time to time (Conlained in Bihar F.D.(Coml. taxes) No.2138 dt.19-1-84 will be binding on<br />
the contractor.)<br />
28. The rate quoted less than 15% of estimated cost including Government materials will not be<br />
entertained & the rate to be quoted after decimal point should but not more than two digits.<br />
29. In case of tender filled by registered firm of company character certificate should be enclosed of<br />
all members.<br />
30. Quantities given in Bill of quantity are subject to variation and no claim of this score will be<br />
entertained.<br />
31. All other terms an conditions contained in vigilance department letter no.1/Est.27/83-2347<br />
T.E.C., Patna dt. 31.12.83 will be binding on the contractors.<br />
32. Vide Engr.-in – Chief Memo No. 2553 (E) dt. 4-5-90 the supply of Materials of different sizes<br />
and grated should be stacked at work site with proper size and for which no claim will be<br />
entertained.<br />
Mode of Measurement:<br />
Stone Chips & Moorum - 1.5 M x 1.5 M x 0.45 M<br />
To be taken to 1 M 3<br />
Stone Metal Grade-I 1.5 M x 1.5 M x 0.55 M<br />
To be taken to 1 M 3<br />
Stone Metal Gr.-II & III 1.5 M x 1.5 M x 0.52 M<br />
Should be taken to 1 M 3<br />
33. For mantaining temperature Every agency must have their own rate thermometer during the<br />
execution of bitumen work.<br />
34. The contractor will be responsible for making good to the <strong>Road</strong>/Bridge/Culvert repaired by him<br />
of any damage or failure occurs in the road on his own cost up to period of one years………….<br />
From the date of completion.<br />
35. Contractor must have to be establish a quality control laboratory at the work site at his own cost.<br />
As per direction of MOST & Quality Control. The Agency will have to submit time to time the<br />
quality control test reports of the materials and the work done with the bill.<br />
36. Payment will be done only after finding Satisfactory test reports of the work done.<br />
37. Agreement for work will be done after acquisition of land for purpose approach road.<br />
Executive Engineer<br />
R.C.D.,<strong>Road</strong> Division,Jamtara
dk;Zikyd vfHk;ark dk dk;kZy;]<br />
iFk fuekZ.k foHkkx] iFk izeaMy] tkerkM+kA<br />
fufonk vkea=.k lwpuk<br />
1- foKkiunkrk dk uke %& dk;Zikyd vfHk;ark]<br />
iFk fuekZ.k foHkkx]iFk izeaMy] tkerkM+k A<br />
2- ifjek.k foi= dh fodzh dh frfFk ,oa le;%& fnukad 02-12-10 ]3-00 cts vijkgu~<br />
rd<br />
3- fufonk izkfIr dh vafre frfFk ,oa le; % 03-12-10 ]3-00 cts vijkgu rd<br />
4- fufonk [kksyus dh frfFk ,oa le;%& fnukad 03-12-10 ] 3-30 cts<br />
vijkgu<br />
5- ifjek.k foi= fodzh dk LFkku %& 1- eq[; vfHk;ark ¼;k0½]iFk<br />
fuekZ.k foHkkx]<br />
dk dk;kZy; lh0,e0ih0Mh0vkbZ<br />
ifjlj dkWds] jksM] jkWaphA<br />
2- v/kh{k.k vfHk;ark ] iFk fuekZ.k<br />
foHkkx<br />
iFk vapy ] nqedk dk dk;kZy; A<br />
3- uxj Fkkuk ifjlj ]tkerkM+kA<br />
6-fufonk izkfIr ,oa [kksyus dk LFkku %& dzekad 5 esa n”kkZ;k x;s<br />
dk;kZy; esaA<br />
7-dk;Z dh fooj.kh fuEu izdkj gS%&<br />
dz0<br />
dk;Z dk uke izkDdfyr<br />
jkf”k<br />
¼:0 esa<br />
½<br />
vxz/ku<br />
dh jkf”k<br />
¼:0½<br />
Ikfjek.k<br />
foi= dk<br />
eqY;<br />
¼:0½<br />
dk;Z<br />
lekfIr<br />
dh<br />
vof/kA<br />
1 2 3 4 5 6<br />
1 Tkkek&tkerkM+k&:iukjk;.kiqj iFk ds<br />
fd0<br />
eh08688(600),89,90,91(500),93(500),94<br />
(500),95(500),96(500),97(500),98(500),<br />
99(500),100,101,102(500),103(400),rd<br />
lk/kkj.k ejeefr dk;ZA<br />
2 Tkkek&tkerkM+k&:iukjk;.kiqj iFk ds<br />
fd0 eh0 92 ,93(500), 95(500), 96(500),<br />
97(500), 98(500), 99(500), 102(500),<br />
103(500), 104(300) rd lrg uohdj.k<br />
dk;ZA<br />
3 eqxkZcuh&jktuxj&dq.Mfgr iFk esa<br />
fd0 eh0 iksLV xM+kbZ ,oa jaxkbZ<br />
fy[kkbZ dk;Z A¼foosdk/khu en ls½<br />
1173369-<br />
00<br />
8330883-<br />
00<br />
23500-<br />
00<br />
167000-<br />
00<br />
2500-<br />
00<br />
10000-<br />
00<br />
35 fnu<br />
45 fnu<br />
61520-00 1300-00 500-00 45 fnu<br />
8- ifjek.k foi= ds dz; gsrq vkosnu i= ds lkFk iFk fuekZ.k foHkkx ds leqfpr Js.kh esa<br />
fuca/ku Js.kh esa fuca/ku izek.k&i= ] v|ru vk;dj lQk;k izek.k i= ] okf.kT; dj fuca/ku<br />
izek.k i=] v|ru Je okf.kT; dj lQk;k izek.k i= ] v|ru Je vuqKfIr ] v|ru pfj= izek.k i= dh Nk;k<br />
izfr ¼vfHkizekf.kr½ ,oa ifjek.k foi= dk eqY; ¼tks yksVk;k ugha tk;sxk½ ds lerqY; cSad
MªkIV tks dk;Zikyd vfHk;ark ] iFk fuekZ.k foHkkx] iFk izeaMy] tkerkM+k ds inuke ls<br />
Hkkjrh; LVsV cSad] tkerkM+k esa gh Hkqxrs; gks] dks layXu djuk vfuok;Z gksxk A<br />
9- fufonk dh vU; fo”ks’k “kRrsZ fufonk i= ds lkFk layXu jgsxk tks fufonnkrkvksa dks<br />
ekU; gksxh A<br />
10-fcuk dkj.k crk;s foHkkx dks fdlh ;k lHkh fufonk dks j} djus @ LFkfxr djus dk vf/kdkj<br />
lqjf{kr gSA<br />
11-fufonknkrk }kjk ifjek.k foi= esa ;Fkk vafdr jkf”k ds vuqlkj fufonk vfHkys[k ds lkFk<br />
N% o’khZ; cpr izek.k i= ¼8okW fuxZe½ ;k ikWp o’khZ; Mkd/kj lkof/k tek ] tks >kj[kaM<br />
jkT; ds fdlh Hkh Mkd/kj ls fuxZr gks ] ds :Ik esa dk;Zikyd vfHk;ark ] iFk fuekZ.k<br />
foHkkx] iFk izeaMy] tkerkM+k ds inuke ls fof/kor izfrKIr djk dj tek djuk vfuok;Z gksxk<br />
A<br />
12-fufonk fu’iknu ds ,d lIrkg ds vUnj laosnd dks ,djkjukek djds dk;Z izkjaHk dj nsuk<br />
vfuok;Z gksxk A vU;Fkk nqljs U;wure nj nkrk dks dk;Z vkoafVr dj fn;k tk;sxk A<br />
13-“krZ;qDr fufonk ekU; ugha gksxh A<br />
14-fufonkdkj ftu dk;Z ds fy, fufonk ns jgs gS os Loa; LFkyh; fLFkrh ns[kdj larq’V<br />
gksus ds ckn gh fufonk nj vafdr djsa A ckn esa dksbZ Hkh nkok ekU; ugh gksxk A<br />
15-izkDdfyr jkf”k /kV c
23-fdlh dkj.ko”k fcdzh ,oa izkfIr dh frfFk dks vodk”k /kksf’kr gksus ij dze”k% vxys dk;Z<br />
fnol dks fcdzh ,oa izkfIr dh frfFk c
Name of work :- M/R to Murgabani- Rajnagar-Kundhit<br />
<strong>Road</strong> Under Nala Sub-Division.<br />
OFFICE OF THE EXECUTIVE ENGINEER,<br />
ROAD CONSTRUCTION DEPARTMENT,JHARKHAND<br />
ROAD DIVISON,JAMTAA.<br />
Tender paper for filling rates by the tenderes on the basis of enclosed approved bill of<br />
quantity for the work of M/R to Murgabani- Rajnagar-Kundhit <strong>Road</strong> Under Nala Sub-<br />
Division. for the Year 10-11<br />
1.Estimated Cost:- Rs. 61520.00<br />
2.Amount of E.M. to be deposited:- Rs. 1300.00<br />
3.Cost of bill of Quantity:- Rs. 500.00<br />
4.Time of Completion:- 45 Days<br />
5.Last Date of sale of bill of Quantity:- 02.12.10 up to 3.00 P.M.<br />
6.Date & time of receiving tender:- 03.12.10 up to 3.00 P.M.<br />
7.Date & time of Opening the tender:- 03.12.10 At. 3.30 P.M<br />
8.Authority receiving tender:-<br />
C.E. (C) S.E. E.E. A.E.,R.C.D.,<br />
R.C.D., Ranchi R.C.D., Dumka R.C.D., Jamtara Jamtara / Nala /Masalia<br />
9.Tenderer is to quote his rate on percentage basic of enclosed bill of quantity rates both in<br />
words & figures in the noted columns (Note:- Cross (X) below the other rates which does<br />
not apply him.<br />
10.<br />
Percentage above the<br />
enclosed B.O.Q. Rates<br />
on all item of work<br />
(i) In figure:-<br />
(ii)In words:-<br />
Percentage below the<br />
enclosed B.O.Q. rates on<br />
all item of work<br />
At the enclosed bill<br />
of quantity rates on<br />
all item.<br />
REMARKS
11.Issued to Sri ……………………….<br />
12.Name & Complete postal address of<br />
tenderer:-<br />
13.Registration Number:-<br />
14.Amount of E.M. deposited by the<br />
tenderer in shape of :-<br />
15.Time of Completion as quoted by the<br />
tenderer:-<br />
16.Whether T.C.C., I.T.C., enclosed on<br />
not.:-<br />
17.Labour Registration on number:-<br />
18.Total number of sheets tender sheet<br />
including this sheet submitted by<br />
the tenderer :-<br />
Date, Sign. of tenderer. Executive Engineer ,<br />
R.C.D., <strong>Road</strong> Division,<br />
Jamtara.
BOQ For M/R to Murgabani- Rajnagar-Kundhit <strong>Road</strong> Under Nala Sub-Division.<br />
for the Year 10-11<br />
Sl.No Item of work Quantity Unit Rate<br />
1 2 3 4 5<br />
Providing and fixing at site perecast RCC<br />
1<br />
(1:2:4) ordinary Km Post (350mm<br />
×250mm×1110) with 20 size stone<br />
aggregate and clean coarse sand fixing<br />
the post in cement concrete (1:4:8) all<br />
with 40mm approved quality or stone<br />
aggregagte and including cost<br />
shuttering,curing,carriage ,fiishing,<br />
making, platform icluding brending,<br />
bidin and cost of reinforcement all<br />
complete as I.R.C. specification and<br />
direction of E/I<br />
33 No.s 33 Each 1145.45<br />
2 Providing and fixing at site perecast RCC<br />
(1:2:4) 5th Km Post (500mm<br />
×250mm×1525) with 20 size stone<br />
aggregate and clean coarse sand fixing<br />
the post in cement concrete (1:4:8) do<br />
all with 40mm approved quality or<br />
stone aggregagte and including cost<br />
shuttering,curing,carriage ,fiishing,<br />
making, platform icluding brending,<br />
bidin and cost of reinforcement all<br />
complete as I.R.C. specification and<br />
direction of E/I.<br />
(a) 5th Km post- 8 Nos. 8 Each 1804.45<br />
3 Painting , Numbering and writing posts<br />
with two coats of enamel paints of<br />
approved shade and make after<br />
cleaning the surface thoroughly and<br />
writing with necessary information at<br />
site all complte as per I.R.C.<br />
specification and direction of E/I.<br />
Km post – 33 Nos. 33 Each 195.05<br />
5th Km post – 8 Nos. 8 Each 356.05<br />
Executive Engineer,<br />
<strong>Road</strong> Division,Jamtara.
OFFICE OF THE EXECUTIVE ENGINEER<br />
ROAD DIVISION,JAMTARA(JHARKHAND)<br />
SPECIAL CONDITION<br />
1. Tenderers must examine the site and the various aspect likely to affect the construction and cost<br />
and then quote with full knowledge of site conditions.<br />
2. The work must be carried out strictly as per P.W.D.& M.O.S.T., specification.<br />
3. All rates quoted on the tender should be for completed job including all carriage royalty, Sales<br />
tax, income tax and other taxes, the payment of which will be whole responsibility of the<br />
contractor.<br />
4 Rules laid down in Motors vehicle Act will have also to be followed if any vehicles are used by<br />
the contractor in <strong>Department</strong> works.<br />
5. Labour Rules fixed from time to time have also to be followed and quoted rates should include<br />
for all such items.<br />
6. Stone Chips, Stone metal, lime, bricks and jhama should be got approved by the Engineer-incharge<br />
before use. The contractor will have to remove all dust foreign materials and unapproved<br />
materials at his own cost.<br />
7. Tenderers have to made his complete arrangements for all accessories plants and machineries<br />
required for the execution of work.<br />
8. The Contractor shall not be entitled to claim any compensation for the loss suffered by him onaccount<br />
of (i) failure or delay by or on behalf of Govt. In the supply of materials of stores which<br />
the Govt. may have under taken (ii) natural calamities, (iii) transport and procurements<br />
difficulties,(iv) Circumstances beyond the control of Govt.<br />
9. <strong>Department</strong> materials should be used in works strictly in accordance with the actual requirement<br />
and for any differences the cost will be recovered at panel rates which will be double the issue<br />
rate. The contractor should also maintain proper accounts for such materials and should be in a<br />
position to submit the same when ever required.<br />
10. The Contractor will be full responsibility for watch and ward of the materials supplied by or to<br />
the <strong>Department</strong> and the materials will bne open to inspection by the <strong>Department</strong>al Officer No<br />
claim will be entertained in the case of theft, damages of materials at site till completion of the<br />
work.<br />
11. Contractors has to maintain necessary technical organisation for proper execution of works and<br />
should employ only such persons who arte skilled and experienced in the similar nature of works<br />
& the Executive Engineer shall be at liberty of object and enquire the contractor who in his<br />
opinion mis-conducts him self or is incompetent or neglegent in perfermens of his duties and<br />
such persons shall not be employed by the contractor without permission of the Executive<br />
Engineer.<br />
12. No Conditional tender will be accepted.<br />
13 Stone chips & Stone metal as per requirement will have to collected in full quantity in advance<br />
and stacked as per direction of E/I and be verified before consumption in be the work.<br />
14. Leveling dressing and clearing of the site will be done after completion of works as per direction<br />
of Engineer-in-Charge.<br />
15. Empty drums shall be returned by the contractor to the <strong>Department</strong> in good condition at P.W.D.<br />
Godown at their own cost. In case of loss of empty drums the cost will be recovered from the<br />
contractor @ Rs 160.00 per drum & for empty cement bags @ Rs 3.00 per bag.<br />
16. The letters sent to the contractor at the address give in the agreement and returned undelivered<br />
will be treated as to have been served.<br />
17. The Contractor invariably in all kinds of works will have to maintain a site order book at his<br />
own cost duly certified by the S.D.O. or Executive Engineer. The site order book should always<br />
be kept at site and should be produced properly when demanded by inspecting officer for loss of<br />
the book the contractor will be wholly responsible.<br />
18. Entries in the site order Book will not be made by any officer les then the rank of S.D.O.,R.C.D<br />
But the site order book will be the property of the department.<br />
19. Any addition or alteration in the work must be done under the order of competent authority for<br />
which contractor should get order written on order book duly certified by Gazetted officer of the<br />
<strong>Department</strong>. the site order book should always be kept at the work sites.<br />
20. Royalty and cess will be recovered from each on account bill in case contractor will fail to<br />
produce royalty clearance certificate at this time of passing of bills.
21. The value of work to be done should not exceed the agreement amount without the proper<br />
permission of the competent authority.<br />
22. Payment will be made subject to the availability of fund.<br />
23. It the contractor supply boulder, stone metal moorum gravel, bricks etc from less distance than<br />
those mentioned in the Bill of quantity then their rates will be reduced proportionately on basis<br />
of the approved rate of the contractor if the contractors are required to supply the materials from<br />
longer distance then prior approved of the officer who has approved the tender shall have to be<br />
obtained.<br />
24. In case of sectional measurement of earth work, the initial long and cross section of existing<br />
ground will be taken by the <strong>Department</strong>al officer in presence of the contractor of their<br />
authorized agent and graphs papers will be prepared showing existing ground level and<br />
proposed formation level which with also from part of the agreement the section plotted on<br />
graphs will entered in measurement book and the contractor will have to sign both the graphs<br />
sheets and measurement book for taken of his acceptance before commencement of the work.<br />
25. Earth work in filling be dones in the layers not exceeding 225mm layers. The surface of the unrolled<br />
earth will be made as per designed grades and cross section after breaking the coldness to<br />
the maximum size of 63mm rolling will be done after censuring that the earth to be rolled have<br />
moisture content within the permissible limit of the optimum moisture content. The subsequent<br />
layer of earth on the roller surface will be put only after ensuring that the earth roller has<br />
achieved the designed density at the designed moisture content. In order to ensure the proper<br />
compaction the test result of the compaction will have to be get seen by the Engineer-in-Charge<br />
of the work or his authorized representative.<br />
26. The Item of roller and competion includes the work of breaking the clouds to a maximum to 63<br />
mm, cube and placing the earth in layers not exceeding 225 mm thick and shaping and dressing<br />
the earth in required grades and profile.<br />
27. The deduction of sale tax will be made from the contractor bill as per order of Jharkhand Govt.<br />
from time to time (Conlained in Bihar F.D.(Coml. taxes) No.2138 dt.19-1-84 will be binding on<br />
the contractor.)<br />
28. The rate quoted less than 15% of estimated cost including Government materials will not be<br />
entertained & the rate to be quoted after decimal point should but not more than two digits.<br />
29. In case of tender filled by registered firm of company character certificate should be enclosed of<br />
all members.<br />
30. Quantities given in Bill of quantity are subject to variation and no claim of this score will be<br />
entertained.<br />
31. All other terms an conditions contained in vigilance department letter no.1/Est.27/83-2347<br />
T.E.C., Patna dt. 31.12.83 will be binding on the contractors.<br />
32. Vide Engr.-in – Chief Memo No. 2553 (E) dt. 4-5-90 the supply of Materials of different sizes<br />
and grated should be stacked at work site with proper size and for which no claim will be<br />
entertained.<br />
Mode of Measurement:<br />
Stone Chips & Moorum - 1.5 M x 1.5 M x 0.45 M<br />
To be taken to 1 M 3<br />
Stone Metal Grade-I 1.5 M x 1.5 M x 0.55 M<br />
To be taken to 1 M 3<br />
Stone Metal Gr.-II & III 1.5 M x 1.5 M x 0.52 M<br />
Should be taken to 1 M 3<br />
33. For mantaining temperature Every agency must have their own rate thermometer during the<br />
execution of bitumen work.<br />
34. The contractor will be responsible for making good to the <strong>Road</strong>/Bridge/Culvert repaired by him<br />
of any damage or failure occurs in the road on his own cost up to period of one years………….<br />
From the date of completion.<br />
35. Contractor must have to be establish a quality control laboratory at the work site at his own cost.<br />
As per direction of MOST & Quality Control. The Agency will have to submit time to time the<br />
quality control test reports of the materials and the work done with the bill.<br />
36. Payment will be done only after finding Satisfactory test reports of the work done.<br />
37. Agreement for work will be done after acquisition of land for purpose approach road.<br />
Executive Engineer,<br />
R.C.D.,<strong>Road</strong> Division,Jamtara
dk;Zikyd vfHk;ark dk dk;kZy;]<br />
iFk fuekZ.k foHkkx] iFk izeaMy] tkerkM+kA<br />
fufonk vkea=.k lwpuk<br />
1- foKkiunkrk dk uke %& dk;Zikyd vfHk;ark]<br />
iFk fuekZ.k foHkkx]iFk izeaMy] tkerkM+k A<br />
2- ifjek.k foi= dh fodzh dh frfFk ,oa le;%& fnukad 02-12-10 ]3-00 cts vijkgu~<br />
rd<br />
3- fufonk izkfIr dh vafre frfFk ,oa le; % 03-12-10 ]3-00 cts vijkgu rd<br />
4- fufonk [kksyus dh frfFk ,oa le;%& fnukad 03-12-10 ] 3-30 cts<br />
vijkgu<br />
5- ifjek.k foi= fodzh dk LFkku %& 1- eq[; vfHk;ark ¼;k0½]iFk<br />
fuekZ.k foHkkx]<br />
dk dk;kZy; lh0,e0ih0Mh0vkbZ<br />
ifjlj dkWds] jksM] jkWaphA<br />
2- v/kh{k.k vfHk;ark ] iFk fuekZ.k<br />
foHkkx<br />
iFk vapy ] nqedk dk dk;kZy; A<br />
3- uxj Fkkuk ifjlj ]tkerkM+kA<br />
6-fufonk izkfIr ,oa [kksyus dk LFkku %& dzekad 5 esa n”kkZ;k x;s<br />
dk;kZy; esaA<br />
7-dk;Z dh fooj.kh fuEu izdkj gS%&<br />
dz0<br />
dk;Z dk uke izkDdfyr<br />
jkf”k<br />
¼:0 esa<br />
½<br />
vxz/ku<br />
dh jkf”k<br />
¼:0½<br />
Ikfjek.k<br />
foi= dk<br />
eqY;<br />
¼:0½<br />
dk;Z<br />
lekfIr<br />
dh<br />
vof/kA<br />
1 2 3 4 5 6<br />
1 Tkkek&tkerkM+k&:iukjk;.kiqj iFk ds<br />
fd0<br />
eh08688(600),89,90,91(500),93(500),94<br />
(500),95(500),96(500),97(500),98(500),<br />
99(500),100,101,102(500),103(400),rd<br />
lk/kkj.k ejeefr dk;ZA<br />
2 Tkkek&tkerkM+k&:iukjk;.kiqj iFk ds<br />
fd0 eh0 92 ,93(500), 95(500), 96(500),<br />
97(500), 98(500), 99(500), 102(500),<br />
103(500), 104(300) rd lrg uohdj.k<br />
dk;ZA<br />
3 eqxkZcuh&jktuxj&dq.Mfgr iFk esa<br />
fd0 eh0 iksLV xM+kbZ ,oa jaxkbZ<br />
fy[kkbZ dk;Z A¼foosdk/khu en ls½<br />
1173369-<br />
00<br />
8330883-<br />
00<br />
23500-<br />
00<br />
167000-<br />
00<br />
2500-<br />
00<br />
10000-<br />
00<br />
35 fnu<br />
45 fnu<br />
61520-00 1300-00 500-00 45 fnu<br />
8- ifjek.k foi= ds dz; gsrq vkosnu i= ds lkFk iFk fuekZ.k foHkkx ds leqfpr Js.kh esa<br />
fuca/ku Js.kh esa fuca/ku izek.k&i= ] v|ru vk;dj lQk;k izek.k i= ] okf.kT; dj fuca/ku<br />
izek.k i=] v|ru Je okf.kT; dj lQk;k izek.k i= ] v|ru Je vuqKfIr ] v|ru pfj= izek.k i= dh Nk;k<br />
izfr ¼vfHkizekf.kr½ ,oa ifjek.k foi= dk eqY; ¼tks yksVk;k ugha tk;sxk½ ds lerqY; cSad
MªkIV tks dk;Zikyd vfHk;ark ] iFk fuekZ.k foHkkx] iFk izeaMy] tkerkM+k ds inuke ls<br />
Hkkjrh; LVsV cSad] tkerkM+k esa gh Hkqxrs; gks] dks layXu djuk vfuok;Z gksxk A<br />
9- fufonk dh vU; fo”ks’k “kRrsZ fufonk i= ds lkFk layXu jgsxk tks fufonnkrkvksa dks<br />
ekU; gksxh A<br />
10-fcuk dkj.k crk;s foHkkx dks fdlh ;k lHkh fufonk dks j} djus @ LFkfxr djus dk vf/kdkj<br />
lqjf{kr gSA<br />
11-fufonknkrk }kjk ifjek.k foi= esa ;Fkk vafdr jkf”k ds vuqlkj fufonk vfHkys[k ds lkFk<br />
N% o’khZ; cpr izek.k i= ¼8okW fuxZe½ ;k ikWp o’khZ; Mkd/kj lkof/k tek ] tks >kj[kaM<br />
jkT; ds fdlh Hkh Mkd/kj ls fuxZr gks ] ds :Ik esa dk;Zikyd vfHk;ark ] iFk fuekZ.k<br />
foHkkx] iFk izeaMy] tkerkM+k ds inuke ls fof/kor izfrKIr djk dj tek djuk vfuok;Z gksxk<br />
A<br />
12-fufonk fu’iknu ds ,d lIrkg ds vUnj laosnd dks ,djkjukek djds dk;Z izkjaHk dj nsuk<br />
vfuok;Z gksxk A vU;Fkk nqljs U;wure nj nkrk dks dk;Z vkoafVr dj fn;k tk;sxk A<br />
13-“krZ;qDr fufonk ekU; ugha gksxh A<br />
14-fufonkdkj ftu dk;Z ds fy, fufonk ns jgs gS os Loa; LFkyh; fLFkrh ns[kdj larq’V<br />
gksus ds ckn gh fufonk nj vafdr djsa A ckn esa dksbZ Hkh nkok ekU; ugh gksxk A<br />
15-izkDdfyr jkf”k /kV c
23-fdlh dkj.ko”k fcdzh ,oa izkfIr dh frfFk dks vodk”k /kksf’kr gksus ij dze”k% vxys dk;Z<br />
fnol dks fcdzh ,oa izkfIr dh frfFk c