scale ( fig.-5) and residual life for the actual operational traffic density of the<br />

section, where these girders are likely to be used, can be obtained with the use<br />

of this graph. Although, it is observed from the report prepared by the Railway<br />

(Annexure-I) that many girders are having corrosion particularly in top flange<br />

plates, but this factor is not considered in this study. Hence, it is advised that the<br />

corroded parts of the girders should be replaced before their reuse.<br />

7.0 Conclusions:<br />

The girders of both the abandoned bridges can be used for traffic density of<br />

27GMT for a period of about 60 years. With replacement of corroded parts, the<br />

remaining life span of the girders can be extended further, if traffic density is less<br />

than 27 GMT and good maintenance practices are being followed.<br />