03.08.2013 Views

ASSESSMENT OF RESIDUAL LIFE OF GIRDERS OF BRIDGE No

ASSESSMENT OF RESIDUAL LIFE OF GIRDERS OF BRIDGE No

ASSESSMENT OF RESIDUAL LIFE OF GIRDERS OF BRIDGE No

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

15<br />

Table –1<br />

RU Loading : Annual traffic tonnage for standard traffic types<br />

S<br />

<strong>No</strong><br />

.<br />

Traffic<br />

Type<br />

Train Type Train<br />

Weight<br />

(t)<br />

<strong>No</strong>. of<br />

Trains per<br />

annum<br />

Total<br />

Tonnage<br />

GMT<br />

1 Heavy Heavy Freight 1120 4821 5.40<br />

Heavy Freight 1120 7232 8.10<br />

Mixed Freight 852 15845 13.50<br />

Total 27.00<br />

2 Medium Diesel Hauled Pass. Train 600 22500 13.50<br />

Heavy Freight 1120 2411 2.70<br />

Heavy Freight 1120 6027 6.75<br />

Steel Train 1794 2257 4.05<br />

Total 27.00<br />

3 Light Steel Train 1794 752 1.35<br />

Electric Multiple Unit 372 14516 5.40<br />

Suburban trains 344 23546 8.10<br />

Suburban Trains 172 47093 8.10<br />

Diesel Hauled Pass. Train 600 4500 2.70<br />

Electric Hauled Pass. Train 572 2360 1.35<br />

Total 27.00<br />

Table –2<br />

Details of fatigue testing of specimen taken out from girders of<br />

existing abandoned bridge no 73

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!