EXEC. DIRECTOR (WORKS)<br />

D.O. <strong>No</strong>. 2004/WI/WR/Girder New Delhi – dt. 30.04.2004<br />

Dear Shri R. K. Gupta,<br />

Sub: Alternate use of released steel girders of Vasai Creek bridges on<br />

Borivali – Virar section of Western Railway.<br />

On Borivali – Virar section of Western Railway, Bridge <strong>No</strong>. 73 & 75 across<br />

Vasai Creek have been newly constructed. The old bridges built in 1916 have<br />

been abandoned.<br />

Member Engineering , has desired that a study may be conducted on the<br />

residual life of the released girders of the old bridges and also the extent of<br />

strengthening required with a view to use them on new branch lines where the<br />

traffic is going to be light in the beginning. A report prepared by Western Railway<br />

on this issue is enclosed herewith for considerations.<br />

In view of the above, I would request you to take up the study and submit<br />

report including cost of strengthening and loading standard permissible for these<br />

released girders for further consideration of the Board.<br />

With regards,<br />

Shri R. K. Gupta,<br />

Executive Director/B&S,<br />

RDSO,<br />

Lucknow.<br />

22<br />

Yours sincerely<br />

Sd/-<br />

(P. K. SANGHI)<br />

Annexure<br />

ABANDONED STEEL <strong>BRIDGE</strong> ON VASAI CREEK IN CCG – VR SECTION <strong>OF</strong><br />