Electricity Departments and their Distribution Divisions<br />

which achieve a prescribed minimum reduction in T&D losses<br />

are given awards. In addition they are given shields on the<br />

basis <strong>of</strong> their performance in the reduction in energy losses and<br />

Chairmen/Heads <strong>of</strong> the concerned Electricity Boards/Departments<br />

are given Gold Medals. Individuals as well as institutions<br />

and organisations, who develop scientific devices or put<br />

forward practical suggestions for reduction <strong>of</strong> T&D losses also<br />

qualify for cash awards.<br />

During the year 1990-91 Gold Medals and shields for the year<br />

1988-89 were awarded to State Electricity Boards/Departments<br />

<strong>of</strong> Gujarat, Punjab, Chandigarh and Manipur. In addition cash<br />

awards were given to Chandigarh and thirteen Distribution<br />

Divisions <strong>of</strong> GEB and a shield to the BAVLA (O&M)<br />

Distribution Division <strong>of</strong> GEB.<br />

INTEGRATED OPERATION<br />

2.6.3 The Regional <strong>Power</strong> Grids in the Northern, Western,<br />

Southern and Eastern Regions facilitate the flow <strong>of</strong> power from<br />

surplus areas to deficit areas and assist in the optimum<br />

utilisation <strong>of</strong> the power available in the country.<br />

2.6.4 The inter regional transfers <strong>of</strong> power effected during the<br />

year 1990-91 are given below:-<br />

11<br />

Inter-Regional transfer <strong>of</strong> power during April, 1990 to March,<br />

1991<br />

(figures in MUs)<br />

Supplied from To<br />

Northern Western Southern Eastern Total<br />

Northern - 105.8 - 741.4 847.2<br />

Western 303.0 - 371.7 182.1 856.8<br />

Southern - 6.3 - - 6.3<br />

Eastern - - - - -<br />

Total 303.0 112.1 371.7 923.5 1710.3<br />

DEVELOPMENT OF A NATIONAL POWER<br />

GRID<br />

2.6.5 The setting up <strong>of</strong> a National <strong>Power</strong> Grid is an<br />

evolutionary process. To achieve this objective, the strengthening<br />

and the improvement <strong>of</strong> the Regional power Grids and their<br />

progressive integration through the setting up <strong>of</strong> inter-State<br />

transmission lines and Central Sector transmission projects<br />

which cut across State boundaries was continued during the<br />

year. These projects, alongwith the 400 KV and 220 KV<br />

transmission systems being constructed by the National<br />

<strong>Thermal</strong> <strong>Power</strong> Corporation, the National Hydro-electric<br />

<strong>Power</strong> Corporation, the Neyveli Lignite Corporation and the<br />

North Eastern Electric <strong>Power</strong> Corporation are expected to<br />

constitute the basic structure <strong>of</strong> the National <strong>Power</strong> Grid. In<br />

order to accelerate the process <strong>of</strong>