KV was set up at Bangalore in 1975. 617 personnel were<br />

trained by the Centre upto the end <strong>of</strong> 1989-90. 20 personnel<br />

have been trained during 1990-91.<br />

3.3.5 A scheme for augmentation <strong>of</strong> training facilities at an<br />

approved cost <strong>of</strong> Rs.479.48 lakhs is under implementation.<br />

Under this scheme, tools and equipment required for training<br />

using hot stick and bare hand techniques upto 400KV Voltage<br />

level have been procured and also about 57 acres <strong>of</strong> land has<br />

been acquired at Somanahalli near Bangalore for setting up a<br />

permanent Training Centre along with hostel, staff quarters etc.<br />

Civil works have been entrusted to CPWD. The construction <strong>of</strong><br />

400 KV/220 KV experimental lines entrusted to NTPC have<br />

been completed. The construction <strong>of</strong> 11 to 110 KV<br />

experimental lines along with power supply has been entrusted<br />

to KEB and the work is in progress.<br />

3. UNDP-AIDED PROJECT<br />

3.4.1 The Central Electricity Authority is implementing a<br />

UNDP-aided project relating to modernisation <strong>of</strong> training<br />

facilities at PSTI, Bangalore and the development <strong>of</strong> expertise<br />

in system operation and load despatch technique. The project<br />

took <strong>of</strong>f in April, 1987 and almost all the activities have been<br />

completed by now. Installation and commissioning <strong>of</strong> a<br />

Despatcher Training Simulator (DTS) which constitutes the<br />

main component <strong>of</strong> the project was completed in February,<br />

1990, and the equipment was accepted in May, 1990 after a 60<br />

days working availability test run. The system has also been<br />

integrated into the different training programmes being<br />

conducted at PSTI, Bangalore.<br />

DETAILS OF NTPC PROJECTS<br />

PUBLIC SECTOR<br />

UNDERTAKINGS AND OTHER<br />

ORGANISATIONS<br />

NATIONAL THERMAL POWER<br />

CORPORATION LTD.<br />

4.1.1 The National thermal <strong>Power</strong> Corporation Ltd. (NTPC)<br />

was incorporated in November, 1975 as a Central Generating<br />

Company with the objective <strong>of</strong> planning, promoting and<br />

organising the integrated development <strong>of</strong> thermal power<br />

generation and execution <strong>of</strong> thermal power projects and<br />

associated transmission lines.<br />

4.1.2 The authorised share capital <strong>of</strong> the Corporation is<br />

Rs.8000 crores. As on March, 1991, the paid-up capital <strong>of</strong> the<br />

NTPC was Rs.6355.11 crores, which is wholly subscribed by<br />

the government <strong>of</strong> India.<br />

4.1.3 During 1989-90, the NTPC earned a net pr<strong>of</strong>it <strong>of</strong><br />

Rs.563.56 crores. The return on capital employed and return on<br />

net worth were 10.21% and 10.74% respectively (excluding<br />

prior period income). As per the provisional estimates, NTPC<br />

earned a net pr<strong>of</strong>it <strong>of</strong> Rs.605.47 crores during the year 1990-91.<br />

4.1.4 The NTPC is presently engaged in the execution <strong>of</strong> nine<br />

Super <strong>Thermal</strong> <strong>Power</strong> Projects with an aggregate approved<br />

capacity <strong>of</strong> 13240 MW and four gas based combined cycle<br />

projects with approved capacity <strong>of</strong> 2527 MW. The NTPC has<br />

also undertaken the construction <strong>of</strong> transmission lines with a<br />

total length <strong>of</strong> about 20200 ckt. kms. <strong>of</strong> high voltage lines<br />

including about 816 ckt. kms. <strong>of</strong> HVDC transmission line and<br />

85 substations/sub-station extension. The total approved cost <strong>of</strong><br />

the NTPC projects including associated transmission system is<br />

Rs.18439.09 crores.<br />

4.1.5 The details <strong>of</strong> the projects <strong>of</strong> the NTPC under<br />

implementation are given below:<br />

NAME OF THE REGION/STATE INSTALLED APPROVED ACTUAL/EXPECTED APPROVED COST<br />

PROJECT CAPACITY (MW) DATE OF INCLUDING<br />

ULTIMATE COMMISSIONING ASSOCIATED<br />

TRANSMISSION<br />

SYSTEM<br />

(RS. IN CRORES)<br />

SINGRAULI NORTHERN 2000 2000 UNIT-1 (200) FEB.82 1374.93<br />

STPP (UTTAR PRADESH) UNIT-2 (200)N0V.82<br />

UNIT-3 (200) MAR.83<br />

UNIT-4 (200) NOV.83<br />

UNIT-5 (200) FEB.84<br />

UNIT-6 (500) DEC.86<br />

UNIT-7 (500) NOV.87<br />

21