4.1.6 During the year 1990-91, the NTPC commissioned its<br />

targeted generating capacity <strong>of</strong> 312 MW, raising its total<br />

installed capacity to 10125 MW.<br />

4.1.7 As against the target <strong>of</strong> 1880 ckt. kms. for the year<br />

1990-91, the NTPC completed 2213 ckt. kms. <strong>of</strong> transmission<br />

lines exceeding the target by 17%.<br />

4.1.8 The following transmission lines have been fully<br />

completed during the year 1990-91.<br />

1. Rihand-Dadri 500KV HVDC<br />

2. Ballabhgarh-Dadri 400 KV DC<br />

3. Dadri-Mandola 400 KV DC<br />

4. Jabalpur-Itarsi 400 KV DC<br />

5. Kawas-Bharuch 200 KV DC<br />

6. Ramagundam-Chandrapur 400 KV DC<br />

7. Farakka-Bhagalpur 400 KV DC<br />

8. Kahalgaon-Maithon 400 KV DC<br />

9 N’Sagar-Gooty 400 KV DC<br />

10. Bhagalpur-Biharshriff 400 KV DC<br />

4.1.9 The generation from NTPC stations for the year 1990-91<br />

was 46879 MUs against the target <strong>of</strong> 46475 MUs. The<br />

generation during the previous year was 40,893 MUs.<br />

4.1.10 The units under commercial operation generated 43966<br />

MUs at Plant Load Factor <strong>of</strong> 61.68% during 1990-91 compared<br />

23<br />

UNIT-4 (112) SEP. 89<br />

STEAM TURBINE<br />

UNIT-5 (102) DEC. 89<br />

UNIT-6 (102) JUN. 90<br />

ANTA GBPP NORTHERN 843 430 NOMINAL GAS TURBINE 316.74<br />

(RAJASTHAN) 413 ACTUAL UNIT-1 (88) JAN.89<br />

UNIT-2 (88) MAR.89<br />

UNIT-3 (88) MAY.89<br />

STEAM TURBINE<br />

UNIT-4 (149) MAR.90<br />

DADRI GBPP NORTHERN 1225 817 GAS TURBINE 783.44<br />

(UTTAR PRADESH) UNIT-1 (131) NOV/DEC.91<br />

UNIT-2 (131) JAN/FEB.92<br />

UNIT-3 (131) APR.92<br />

UNIT-4 (131) JUN.92<br />

STEAM TURBINE<br />

UNIT-5 (1465) SEP.92<br />

UNIT-6 (1465) JAN.93<br />

CENTRAL<br />

TRANSMISSION<br />

PROJECT-I<br />

1655 CKT.KM. 400 KV 388.05<br />

RIHAND 1691 KM 400 KV A/C 1063.00<br />

POWER<br />

TRANSMISSION<br />

PROJECT<br />

814.5 KM 500 KV HVDC<br />

VINDHYACHAL<br />

ADDITIONAL TL<br />

1930 KM 400 KV 339.69<br />

TOTAL APPROVED 15767 MW 18439.09<br />

to 38128 at a PLF <strong>of</strong> 68% during the previous year. During<br />

1990-91, the units under commercial operation at Singrauli,<br />

Korba, Ramagundam, Farakka, Vindhyachal, Rihand, Anta<br />

(Gas) and Auraiya operated at a PLF <strong>of</strong> 70.44%, 60.01%,<br />

51.85%, 56.12%, 62.19%, 55.93%, 55.41%, and 48.35%<br />

respectively.<br />

4.1.11 17 <strong>of</strong> the 19 units with the capacity <strong>of</strong> 200/210 MW, 8<br />

<strong>of</strong> the 9 units with a capacity <strong>of</strong> 500 MW and 10 Gas/Steam<br />

units which are presently under commercial operation at the<br />

NTPC stations, have achieved very high levels <strong>of</strong> performance<br />

during the year 1990-91. Units with Plant Load Factor in<br />

excess <strong>of</strong> 70% are as per details given below:<br />

Sl. <strong>Station</strong> Capacity Unit PLF (%)<br />

No. (MW) No.<br />

1. Singrauli 200 1 72.88<br />

2. Singrauli 200 2 71.09<br />

3. Singrauli 200 5 80.39<br />

4. Singrauli 500 6 75.40<br />

5. Singrauli 500 7 76.21<br />

6. Korba 200 2 79.62<br />

7. Korba 500 3 73.29<br />

8. Farakka 200 1 72.30<br />

9. Anta 88 3 70.78