4.2.4 During the year, the NHPC was engaged in the<br />

construction <strong>of</strong> the following Projects.<br />

Sl No. Name <strong>of</strong> the Project State (Installed<br />

Capacity in<br />

MWs)<br />

1. Chamera HE project (Stage-I) H.P. (3x180 MW)<br />

2. Tanakpur HE Project U.P. (3x40 MW)<br />

3. Dul Hasti HE Project J&K (3x130 MW)<br />

4. Uri HE Project J&K 4x120 MW)<br />

5. Salal HE Project (Stage-II) J&K (3x115 MW)<br />

6. Rangit HE Project Sikkim (3x20 MW)<br />

7. Dhauliganga HE Project U.P. (4x70 MW)<br />

CHAMERA H.E. PROJECT (STAGE-I)<br />

4.2.5 The works on the various components <strong>of</strong> the project<br />

like main Dam, power Tunnel, Tail Race Tunnel etc, progressed<br />

satisfactorily during the year.<br />

4.2.6 Against a target <strong>of</strong> 5.31 lakhs cum., 5.63 lakhs cum.<br />

concreting was achieved in the Dam during the year. Of the 6.4<br />

Km long <strong>Power</strong> Tunnel, heading has been completed in 6 Kms.<br />

The balance length <strong>of</strong> 443 Mtrs. is expected to be completed<br />

shortly. Installation <strong>of</strong> Generating Unit No. 1 has been started<br />

and is expected to be completed by Dec., 1991.<br />

4.2.7 Efforts are being made to achieve the commissioning <strong>of</strong><br />

the project by December, 1992.<br />

TANAKPUR H.E. PROJECT<br />

4.2.8 The project is in an advanced stage <strong>of</strong> construction and<br />

the work is proceeding in full swing. The civil work <strong>of</strong> Barrage<br />

and Head Regulator has been completed excepting for<br />

installation <strong>of</strong> 4 gates <strong>of</strong> Barrage. The <strong>Power</strong> House structure<br />

has been completed. Unit-I has been boxed up and work on<br />

Unit-II and III is in progress. The project is expected to be<br />

completed as per schedule i.e. by March, 1992.<br />

DUL HASTI H.E. PROJECT<br />

4.2.9 Work on the Project commenced during the year 1989-<br />

90. Land for construction <strong>of</strong> various components has been<br />

acquired. Most <strong>of</strong> the additional investigations like collection<br />

<strong>of</strong> topographical, geophysical and seismological data as well as<br />

the Design Review are under finalisation. The development <strong>of</strong><br />

the infrastructure has been completed. Most <strong>of</strong> the underground<br />

works have been taken up. Access tunnel to <strong>Power</strong> House is in<br />

an advanced stage <strong>of</strong> completion. Diversion channel and c<strong>of</strong>fer<br />

dam works for the Ist stage have been completed and the river<br />

has been diverted on 17th March, 1991. The project is<br />

25<br />

Dul Hasti Project - River diversion works in progress<br />

expected to be completed within the stipulated period <strong>of</strong> 57<br />

months viz. by July, 1994.<br />

URI H.E. PROJECT<br />

4.2.10 The work on additional field investigations is nearing<br />

completion and the work on development <strong>of</strong> the infrastructural<br />

facilities by the Consortium is in an advanced stage. The main<br />

project works execution is scheduled to be taken up during the<br />

current year. The Consortium has submitted project layout<br />

reports including the various design studies which are under<br />

review and finalisation. The project is scheduled to be<br />

completed within a period <strong>of</strong> 72 months viz. by November,<br />

1995.<br />

SALAL H.E. PROJECT (STAGE-II)<br />

4.2.11 Work on <strong>Power</strong> House and Tail Race Tunnel at this<br />

project is going as per schedule. Orders have been placed on<br />

M/S BHEL for manufacture, supply & installation <strong>of</strong> turbines<br />

and generating equipment. The project is scheduled for<br />

completion by September, 1993.<br />

RANGIT H.E. PROJECT<br />

4.2.12 The approval for execution <strong>of</strong> the project was accorded<br />

during the year. Land acquisition has been completed.<br />

Infrastructure works and work on construction <strong>of</strong> Diversion<br />

Tunnel and Head Race Tunnel are in progress. Implementation<br />

<strong>of</strong> Compensatory Afforestation Programme is also in progress.<br />

The Environmental Action Plan for the project has been<br />

submitted to <strong>Ministry</strong> <strong>of</strong> Environment and Forests in March,<br />

1991. Work on the Diversion Tunnel, adit to Head Race tunnel<br />

(down stream) and Surge Shaft excavation has been started.