technical specifications. In the North-Eastern region, an<br />

interim load despatch centre is operating. It is proposed to set<br />

up a permanent RLDC with modernised facilities in the North-<br />

Eastern region during the VIII plan period for which a project<br />

proposal is under consideration. Also it is proposed to take up a<br />

unified scheme for the establishment <strong>of</strong> fullfledged SLDCs and<br />

augmentation <strong>of</strong> RLDC in the Northern Region.<br />

MASTER TELECOM PLAN FOR INDIAN<br />

POWER SECTOR<br />

2.6.9 The work <strong>of</strong> preparing a Master Telecom Plan for the<br />

Indian power Sector covering all power utilities, Regional<br />

Electricity Boards, Central <strong>Power</strong> Sector and National Level<br />

was awarded to M/s. Merz & Mclellan, U.K. in association<br />

with M/s. Bharat Electronics Limited, India in November,<br />

1987. The Report <strong>of</strong> the Consultants has been made available<br />

to CEA in three phases and the same has been sent to the<br />

concerned utilities to initiate the process <strong>of</strong> implementation.<br />

The project reports for the independent dedicated telecom<br />

system for the State Electricity Boards <strong>of</strong> Punjab (phase-I),<br />

Kerala, Gujarat, Madhya Pradesh and Maharashtra (phase-I)<br />

have already been appraised by the CEA. Department <strong>of</strong><br />

Telecommunications has been requested by CEA on behalf <strong>of</strong><br />

the power utilities to accord their clearance for the dedicated<br />

multi-channel link by the power utilities. The have already<br />

approved the optical fibre scheme <strong>of</strong> Punjab state Electricity<br />

Board.<br />

13<br />

UPGRADING OF TECHNOLOGY<br />

Next Higher AC Transmission Voltage<br />

2.6.10 The adoption <strong>of</strong> 800 KV class as the next higher AC<br />

transmission voltage in the country had been accepted by the<br />

Govt. <strong>of</strong> India in October, 1988. The decision had been<br />

conveyed to all State Electricity Boards/<strong>Power</strong> Utilities, etc.<br />

With a view to bring uniformity in the development <strong>of</strong> future<br />

800KV systems in the country, the Standing EHV Committee<br />

had constituted 10 Working Groups with representatives from<br />

Electricity Boards/Undertakings, CPRI, Industry and CEA to<br />

take up the work <strong>of</strong> standardisation <strong>of</strong> 800 KV class<br />

equipment/transmission line material. Based on the studies<br />

carried out by the Working Groups and the detailed discussions<br />

held by them, a report on Standard parameters <strong>of</strong> 800KV<br />

transmission system in India had been brought out by CEA in<br />

September, 1990. This report has been circulated to all the<br />

Electricity Boards and <strong>Power</strong> Utilities etc. for their guidance<br />

and adoption <strong>of</strong> recommended parameters.<br />

NATIONAL HVDC PROJECT<br />

2.6.11 Under the national HVDC project one circuit <strong>of</strong> the<br />

existing double circuit 220 KV AC line from Lower Sileru<br />

(Andhra Pradesh) to Barsoor (M.P.) is being converted into<br />

+200 KV 200 MW DC link. The project is being implemented<br />

in two phases. The first phase envisaged the conversion <strong>of</strong> one