Brown and Caldwell, Jeff Herr, P.E., D.WRE, Lisa Jeffrey, P.E., C.F.M
Brown and Caldwell, Jeff Herr, P.E., D.WRE, Lisa Jeffrey, P.E., C.F.M
Brown and Caldwell, Jeff Herr, P.E., D.WRE, Lisa Jeffrey, P.E., C.F.M
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Gwinnett County DWR Project Objectives<br />
Determine if it is possible to infiltrate <strong>and</strong>/or store/reuse<br />
on-site the runoff from the 95 th percentile storm event<br />
(EISA)<br />
Determine effectiveness of different LID practices<br />
Determine construction <strong>and</strong> operation <strong>and</strong> maintenance<br />
requirements for infiltration <strong>and</strong> storage/reuse facilities<br />
Determine capital, O&M <strong>and</strong> life cycle costs for different<br />
types of LID practices<br />
Use constructed project to educate developers,<br />
engineers, <strong>and</strong> the public on the use of LID practices<br />
Promote the use of viable LID practices in Gwinnett<br />
County