13.08.2013 Views

NATO/CCMS Pilot Study Evaluation of Demonstrated and ... - CLU-IN

NATO/CCMS Pilot Study Evaluation of Demonstrated and ... - CLU-IN

NATO/CCMS Pilot Study Evaluation of Demonstrated and ... - CLU-IN

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>NATO</strong>/<strong>CCMS</strong> <strong>Pilot</strong> Project on Contaminated L<strong>and</strong> <strong>and</strong> Groundwater (Phase III) January 2002<br />

soil activators. During the treatment phase, dissolved oxygen, nutrient concentration, temperature, <strong>and</strong> pH<br />

were monitored continuously.<br />

After 27 days <strong>of</strong> treatment, the cleanup criteria were met <strong>and</strong> the slurry-phase treatment process was<br />

closed. The slurry was pumped to a concrete basin where the treated soil was separated from the water by<br />

sedimentation. The waster was stored for reuse in the text treatment batch. The treated soil will be reused<br />

as fill material.<br />

3.3 Monitoring Program<br />

In order to determine the initial PAH concentration, a soil sample was taken from the soil fraction

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!