DEP issues a Notice <strong>of</strong> Intent to Declare Lead Agency and Conduct an <strong>Environmental</strong> Review.<br />
DEP received revised Long Form EAF via email from applicant's attorney on 3/11/09. On<br />
3/11/09, DEP received a response from attorney to DEP comment letter <strong>of</strong> 3/2/09. DEP<br />
received letter from an attorney for neighbors, dated 4/2/09 with comments on the SPDES Permit<br />
Mod and EAF as they affect neighbors' property. A meeting is scheduled for 4/13/09 with<br />
attorney for applicant, DEP/REP, DEP Counsel and <strong>NYC</strong> Law. DEP received Lead Agency Neg<br />
Dec dated 5/29/09 from BEPA.<br />
Project Type: Intermediate Repair (CR)<br />
Status:<br />
DEP performed a construction inspection <strong>of</strong> the SSTS on 7/9/10; the contractor was backfilling<br />
the SSTS. DEP received an e-mail from the applicant on 7/13/10 stating that the seeding and<br />
fencing will hopefully be completed by next week. DEP conducted an inspection <strong>of</strong> the SSTS<br />
under construction on 7/14/10. DEP received As-Built plans/engineer's certification letter from<br />
the engineer on 8/6/10. DEP staff conducted a final inspection on 8/10/10 after receiving the asbuilts<br />
from the engineer. DEP completed construction inspections on 8/10/10. DEP received<br />
revised As-Built plans from the engineer on 9/10/10. DEP received DOH's certificate <strong>of</strong><br />
approval from DOH on 9/16/10. DEP issued a letter <strong>of</strong> Construction Compliance letter on<br />
9/22/10. DEP issued a letter to the Camp on 1/26/12 stating that DEP has received notice that<br />
the camp plans to construct new bunk house buildings that will require detailed site plans for<br />
DEP to review.<br />
NEW PROJECT #5<br />
Town: Hunter<br />
Basin: Schoharie<br />
Project Name: Kelleher, Norah (Cosmic Charlie's), (Log #2011-SC-0465)<br />
Project Description: Convert residence in business district to restaurant and bar. Proposal to<br />
connect to the Hunter WWTP<br />
Project Type: SEQRA (SQ)<br />
Status:<br />
DEP received a Notice <strong>of</strong> Intent to declare Lead Agency from the Lewisboro on 7/11/11 DEP<br />
received a Short EAF on 7/11/11. DEP issued comment request to Tech Team with comments<br />
due to SEQRA Director on 7/25/11 DEP issued a letter on 7/25/11 stating that DEP has no<br />
objection to the Hunter Planning Board being Lead Agency for the purposes <strong>of</strong> SEQRA and<br />
comments on the EAF and site plan. DEP received a letter and a copy <strong>of</strong> the meeting minutes<br />
from the Village Planning Board Chairman on 8/10/11. The action is scheduled to be on agenda<br />
for next planning board meeting scheduled on 8/25/11. SCS called Acting Planning Board Chair<br />
on 10/12/11 inquiring about SEQRA status determination. SCS received call on 10/17/11 from<br />
Acting Planning Board Chair and was informed that a Negative Determination has been made<br />
with conditions. Hard copy to follow in the mail. SCS received Lead Agency Neg Dec dated<br />
9/6/11 from the Village <strong>of</strong> Hunter Planning Board.<br />
Project Type: Sewer Connection (CN)<br />
Status:<br />
Site Visit type: Investigation. Date: 12/27/11. DEP performed a site visit investigation on<br />
12/27/11 and met with the owner's representative and contractor to discuss the sanitary sewer<br />
connection and grease tank installation. Present for Inspection: Owner's Representative,<br />
Contractor. DEP sent an e-mail to the village engineer on 12/28/11 regarding his role in this<br />