with the project engineer on 10/26/10. DEP discussed the design and requested changes. DEP<br />

also requested the following: SEQRA, SPDES Permit, EPA Injection well and some minor<br />

revisions. DEP told the engineer that an approval will not be issued until all requested<br />

documents are received. DEP called DOH on 11/9/10 regarding the water system for the project.<br />

DOH was unaware <strong>of</strong> the project and took the project information. DOH will contact the project<br />

engineer to discuss the water requirements. DEP called the engineer on 11/10/10 to tell them<br />

that there are DOH requirements for the project and that DEP will not approve the project until<br />

all DOH issues are resolved. DEP received revised plans from the engineer on 1/23/12. DEP<br />

issued a NOCA on 2/7/12.<br />

NEW PROJECT #1<br />

Town: Olive<br />

Basin: Ashokan<br />

Project Name: Catskill Modular Homes, (Log #2006-AS-1143)<br />

Project Description: Replacement <strong>of</strong> a failed SSTS<br />

Project Type: Intermediate SSTS (IS)<br />

Status:<br />

See section 6.1.2<br />

Town: Olive<br />

Basin: Ashokan<br />

Project Name: Onteora Mountain House, (Log #2010-AS-1070)<br />

Project Description: Alteration/Modification <strong>of</strong> an existing SSTS<br />

Project Type: Intermediate Repair (CR)<br />

Status:<br />

See section 6.1.2<br />

Town: Olive<br />

Basin: Ashokan<br />

Project Name: Zeines, Victor, (Log #2007-AS-0005)<br />

Project Description: SSTS Replacement for dental <strong>of</strong>fice<br />

Project Type: Intermediate Repair (CR)<br />

Status:<br />

See section 6.1.2<br />

Town: Olive<br />

Drainage Basin: Ashokan Reservoir<br />

Project Name: Reconstruction <strong>of</strong> 7 Ashokan Reservoir Bridges, CAT-177 (Log #2003-<br />

AS-0866)<br />

Project Description: Reconstruction <strong>of</strong> 7 Ashokan Bridges<br />

Project Type: Stormwater (SP)<br />

Status:<br />

Construction continues at Stone Church and the Spillway. DEP performed a site visit on<br />

8/30/10; there were no deficiencies; there was no discharge; the site was occupied. DEP<br />

performed site visits on 10/18, 11/30/10, 1/11 and 3/15/11; there were no deficiencies, there was<br />

no discharge and the site was occupied. DEP performed site visits on 4/19, 5/12, 6/28 and<br />

7/19/11; there were no deficiencies, there was no discharge, the site was occupied. DEP<br />

completed construction inspections on 8/4/11. DEP issued a letter to BEDC on 11/2/11<br />