Town: Olive<br />
Basin: Ashokan<br />
Project Name: Olive Plaza, (Log #1998-AS-1173)<br />
Project Description: Commercial development <strong>of</strong> 2 acre site with individual SSTS. Formerly<br />
Tumasian, Joseph Other is construction inspections for the replacement <strong>of</strong><br />
the pumps and risers<br />
Project Type: Other (OT)<br />
Status:<br />
On 7/6/11, DEP met with the UCHD on site; there was no sewage spill so UCHD left the rest <strong>of</strong><br />
the compliance issues to DEP. DEP sent an e-mail to the owner <strong>of</strong> the plaza outlining what<br />
needs to be done to the SSTS. On 7/11/11, DEP field staff inspected the repair <strong>of</strong> the pumps.<br />
DEP performed site visits on 7/18 and 8/2/11; septic failure was not observed. DEP sent an email<br />
to the owner to remind him that a few items, including total flows to the existing SSTS,<br />
need to be addressed. DEP received an e-mail from the property owner on 10/7/11. DEP<br />
received an e-mail from the owner on 10/18/11; he has directed the contractor to call DEP when<br />
the work is to be done. DEP received a call on 11/4/11 from the contractor, who has installed a<br />
traffic rated riser and ring on the grease trap behind the pizza shop.<br />
Town: Roxbury<br />
Basin: Schoharie<br />
Project Name: Sullivan, Daniel (Grand Gorge Animal Hospital), (Log #2009-SC-0623)<br />
Project Description: Failing commercial SSTS - CWC<br />
Project Type: Intermediate Repair (CR)<br />
Status: Closed<br />
See section 6.1.2<br />
Town: Roxbury<br />
Basin: Schoharie<br />
Project Name: Greene-Del Sanitation and Recycling, (Log #2008-SC-0239)<br />
Project Description: Operate construction and demolition debris facility.<br />
Project Type: Other (OT)<br />
Status:<br />
DEP received a Project Notification letter; site location maps on 4/14/08, from DEC. DEP<br />
issued a letter to DEC on 6/3/08 with DEP's comments and recommendations. DEC's NOCA<br />
appeared in the ENB on 9/3/08. DEP received the DEC application to modify the existing<br />
permit from DEC on 4/6/11. DEP performed a site visit on 5/5/11. DEP received DEC's<br />
notification <strong>of</strong> availability for review for the increase through-put, extend hours, process outside<br />
due to flood debris from DEC on 12/21/11.<br />
Project Type: Stormwater (SP)<br />
Status:<br />
See section 6.1.2<br />
Project Type: SEQRA (SQ)<br />
Status:<br />
DEP received a Full EAF on 4/14/08. DEP received a Notice <strong>of</strong> Intent to declare Lead Agency<br />
from DEC on 4/14/08. SCS received Lead Agency Neg Dec dated 8/21/08 from DEC.<br />
40