Proposed Mixed Use<br />

Development, Braehead<br />

Socio-Economic Impact Report<br />

January 2013


3366706v3<br />

Proposed Mixed Use Development, Braehead : Socio-Economic Impact Report<br />

Contents<br />

Executive Summary 1<br />

1.0 Introduction 1<br />

Proposed Development 1<br />

Methodology 2<br />

2.0 Planning Policy Context 3<br />

Glasgow and The Clyde Valley Strategic Development Plan 3<br />

The <strong>Renfrewshire</strong> Local Development Plan 6<br />

Conclusions 7<br />

3.0 Baseline Conditions 8<br />

Area of Impact 8<br />

Socio-Economic Conditions 8<br />

Local Labour Market Conditions 11<br />

Existing Economic Contribution of Braehead 12<br />

Retail Facilities 13<br />

4.0 Potential Impacts 14<br />

Introduction 14<br />

Construction Impacts 14<br />

Operational Impacts 15<br />

Maximising the Impacts 22<br />

5.0 Wider Economic Role & Attraction of Investment 25<br />

Origins of the Braehead Shopping Centre 25<br />

Catalyst for Regeneration 26<br />

Conclusions 27<br />

6.0 Conclusions 28<br />

7.0 Abbreviations 30<br />

8.0 References 31


3366706v3<br />

Proposed Mixed Use Development, Braehead : Socio-Economic Impact Report<br />

Figures3<br />

Figure 1.1 Braehead Indicative Masterplan - 2025 Vision 2<br />

Figure 3.1 Main Impact Area and Sub-Regional Context 8<br />

Figure 3.2 Indices of Multiple Deprivation - Main Impact Area 10<br />

Tables3<br />

Table 4.1 Job Generation of Proposed Development 16<br />

Table 4.2 Retail Employment Generation by Occupation 17<br />

Table 4.3 Net Additional Employment 19<br />

Table 4.4 Operational GVA Impacts (Net Additional) 19<br />

Table 4.5 Gross Employment Related to scheme in the Impact Area 20<br />

Table 4.6 Gross Employment Related to scheme in the Region 20<br />

Appendices3<br />

Appendix 1 Socio Economic Data


Braehead Shopping Centre Extension : Socio-Economic Impact Report<br />

PROPOSED MIXED USE DEVELOPMENT, BRAEHEAD.<br />

This Socio-Economic Impact Report has been prepared in support of a planning<br />

application submitted on behalf of Capital Shopping Centres PLC at King’s Inch<br />

Road / King’s Inch Drive, Braehead, Renfrew, G51 4BN. The planning<br />

application seeks planning permission in principle for the following:<br />

Mixed use development comprising Class 1 (retail use), Class 2 (use for<br />

financial, professional and other services), Class 3 (food and drink use), Class<br />

7 (hotel use), Class 11 (assembly and leisure use) including an events arena,<br />

and other ancillary uses; construction of transport interchanges and new<br />

route for Fastlink bus service, car parking, roads and accesses, footpaths and<br />

covered walkways, public realm works (including provision of open space and<br />

civic square) together with landscaping, all associated works and necessary<br />

infrastructure; and demolition of some existing buildings to enable the<br />

proposed development to proceed.<br />

The schedule below details the submitted plans in relation to this application:<br />

Plan Reference Plan Title Scale<br />

CTM-XX-00-15-1100-01 Location plan<br />

1:5000 @ A3/1:2500<br />

@ A1<br />

CTM-XX-00-15-1001-06<br />

Site Plan / Proposed Building<br />

Plots<br />

1:5000 @ A3 and<br />

1:2500 @ A1<br />

CTM-XX-00-15-1002-06<br />

Site Plan/Indicative Vehicular<br />

Access Locations<br />

1:5000 @ A3 and<br />

1:2500 @ A1<br />

CTM-A-00-15-1051-05<br />

Zone A / Horizontal Limits of<br />

Deviation<br />

1:2500 @ A3 and<br />

1:1250 @ A1<br />

CTM-A-00-15-1053-08<br />

Zone A / Vertical Limits of<br />

Deviation<br />

1:2500 @ A3 and<br />

1:1250 @ A1<br />

CTM-B-00-15-1055-04<br />

Zone B / Horizontal Limits of<br />

Deviation<br />

1:2500 @ A3 and<br />

1:1250 @ A1<br />

CTM-B-00-15-1057-06<br />

Scale Zone B / Vertical Limits of<br />

Deviation<br />

1:2500 @ A3 and<br />

1:1250 @ A1<br />

CTM-XX-00-15-3000-03 Demolition and Alterations<br />

1:5000 @ A3 and<br />

1:2500 @ A1<br />

CTM-XX-00-21-2001-05 Site Sections Not to Scale @ A3<br />

Further illustrative and indicative plans and information is also provided within<br />

the Design and Access Statement accompanying the planning application.<br />

3366706v3


This document is formatted for double sided printing.<br />

© Nathaniel Lichfield & Partners Ltd 2012. Trading as Nathaniel Lichfield & Partners.<br />

All Rights Reserved.<br />

Registered Office:<br />

14 Regent's Wharf<br />

All Saints Street<br />

London N1 9RL<br />

All plans within this document produced by NLP are based upon Ordnance Survey mapping with the permission of<br />

Her Majesty’s Stationery Office. © Crown Copyright reserved. Licence number AL50684A


3366706v3<br />

Proposed Mixed Use Development, Braehead : Socio-Economic Impact Report<br />

Executive Summary<br />

This report provides an assessment of the potential socio-economic impacts of<br />

the proposed mixed use development at Braehead, <strong>Renfrewshire</strong>.<br />

The scheme comprises up to 41,000m 2 of new retail floorspace, 3,100m 2 of<br />

financial/professional and/or new food and drink floorspace, a 200-bed hotel,<br />

and a 5,000 seat events arena for sports, concerts and exhibitions, together<br />

with new civic square and spaces. The proposed development would also<br />

include a new integrated transport interchange, car parking and associated<br />

access and landscaping works.<br />

The development will generate a wide range of direct, indirect and catalytic<br />

economic effects, both quantifiable and non-quantifiable. These effects will be<br />

spread over a wide area, but are likely to be focused on the local authority<br />

areas of <strong>Renfrewshire</strong> and Glasgow City which is taken to be the main impact<br />

area. These effects are summarised below.<br />

Construction Impacts Operational Impacts Wider Impacts<br />

2,310 person-years (231 FTE)<br />

construction jobs<br />

£10.6 million GVA generated<br />

by construction jobs<br />

46 FTE indirect construction<br />

jobs supported in supply chain<br />

2,650 direct operational jobs<br />

on-site<br />

Annual Annual GVA GVA uplift uplift of of £45<br />

£45<br />

million million from from operational operational jobs<br />

jobs<br />

Supplier Supplier & & wage wage expenditure<br />

expenditure<br />

will will support support 400 400 ‘spin-off’<br />

‘spin-off’<br />

jobs jobs (800 (800 in in Scotland)<br />

Scotland)<br />

Capital Capital expenditure expenditure of of £200<br />

£200<br />

million<br />

million<br />

Improvements Improvements to to local<br />

local<br />

transport transport and and public public realm<br />

realm<br />

Stimulate Stimulate further further investment<br />

investment<br />

and and economic economic activity activity in in the<br />

the<br />

local local area<br />

area<br />

Braehead has acted as a major driver of the wider regeneration of the Clyde<br />

waterfront since its completion in the late 1990s, delivering new facilities and<br />

infrastructure and accelerating the renewal of a former derelict industrial area.<br />

The proposed development will cement Braehead’s position as a focus for<br />

growth, anchor further investment, and support the diversification of the centre<br />

in support of its role as a new Strategic Town Centre in <strong>Renfrewshire</strong>.


Proposed Mixed Use Development, Braehead: Socio-Economic Impact Report<br />

1.0 Introduction<br />

1.1 This Socio-Economic Impact Report has been produced on behalf of Capital<br />

Shopping Centres plc (CSC) by Nathaniel Lichfield & Partners (NLP). It assesses<br />

the socio-economic impacts arising from the proposed mixed use development<br />

at Braehead, in particular:<br />

1 how the proposed development is likely to impact upon employment<br />

during its construction and operation in terms of the number, type and<br />

status of jobs in the local labour market;<br />

2 the identification of any ‘spin off’ effects of the proposed development in<br />

terms of stimulating investment or other economic activity;<br />

3 consideration of the wider benefit to the economy that the new retail and<br />

leisure facilities will provide; and<br />

4 how the current proposals will continue the process of regeneration that<br />

have taken place over the past 15 years since development at Braehead<br />

was initiated.<br />

Proposed Development<br />

1.2 The proposal is for a mixed use development at the existing Braehead<br />

Shopping Centre comprising up to 41,000m 2 of new retail floorspace, 3,100m 2<br />

of financial/professional and/or new food and drink floorspace, a 200-bed<br />

hotel, and a 5, 000 seat events arena for sports, concerts and exhibitions, and<br />

a new civic square. The proposed development also includes a new integrated<br />

transport interchange, car parking and associated access and landscaping<br />

works.<br />

1.3 Braehead lies on the south bank of the River Clyde, just north of Junction 26 of<br />

the M8 motorway and some 5km north east of the town of Paisley. It forms part<br />

of an 80 ha area of former industrial land along the riverbank which continues<br />

to represent one of the largest strategic regeneration locations in Scotland. The<br />

Masterplan for the wider development of Braehead is presented in Figure 1.1.<br />

3366706v3 P1


Proposed Mixed Use Development, Braehead : Socio-Economic Impact Report<br />

Figure 1.1 Braehead Indicative Masterplan - 2025 Vision<br />

Source: Capital Shopping Centres / Chapman Taylor<br />

Methodology<br />

1.4 The report first establishes the policy context and baseline position in terms of<br />

local economic and social conditions before considering the potential impacts<br />

of the proposed development on the local and regional economy. The impact<br />

assessment is based on the proposed development for which planning<br />

permission is sought as described above, rather than the wider masterplan<br />

area as illustrated in Figure 1.1.<br />

1.5 The assessment draws upon published Government and local authority<br />

statistics, and social, economic and community strategy <strong>documents</strong> relating to<br />

the area. The latest available data from the 2001 Census, 2008 Annual<br />

Business Inquiry (ABI), 2011 Business Register and Employment Survey (BRES)<br />

and other published national statistics have been used. <strong>Supporting</strong> data is<br />

included in Appendix 1.<br />

P2 3366706v3


Proposed Mixed Use Development, Braehead: Socio-Economic Impact Report<br />

2.0 Planning Policy Context<br />

2.1 This section provides a review of the policy context as it relates to socioeconomic<br />

issues and draws on the accompanying Planning Statement prepared<br />

by RDPC. The development plan for the Braehead area consists of the Glasgow<br />

and The Clyde Valley Strategic Development Plan (SDP) and the <strong>Renfrewshire</strong><br />

Local Plan. The Local Plan was adopted in March 2006 and will shortly be<br />

replaced by the new proposed <strong>Renfrewshire</strong> Local Development Plan (LDP). The<br />

SDP was approved by Scottish Ministers on 29th May 2012, and therefore<br />

represents the up-to-date strategic planning context for the area. However the<br />

development plan will not be fully up to date until the proposed LDP is adopted.<br />

Glasgow and The Clyde Valley Strategic Development<br />

Plan<br />

2.2 The SDP consists of several tiers of policy, starting with the ‘Spatial Vision’<br />

which in turn leads to the ‘Spatial Development Strategy’. Proposals are tested<br />

against the Spatial Development Strategy to establish whether or not they<br />

support the strategy and therefore the delivery of the Spatial Vision.<br />

2.3 Core components of the Spatial Development Strategy are several geographical<br />

areas in which a particular focus on investment and regeneration is to be<br />

encouraged. The Clyde Waterfront is one such area, where it is intended that<br />

there should be a focus on mixed use developments, including the following<br />

uses and functions: economic activity, housing, tourism, fixed and green<br />

infrastructure, culture, leisure, education, health and public transport. The<br />

Clyde Waterfront is regarded as a sustainable location for these uses and<br />

activities.<br />

2.4 Paragraph 4.8 of the SDP describes the Clyde Waterfront area in the following<br />

terms:<br />

The Clyde Waterfront is a key component of the SDS model and is a major longterm<br />

mixed use regeneration and urban community restructuring project. It is<br />

designed to revitalise the River Clyde section of the Development Corridor;<br />

reconnect its communities with the river and provide a new central development<br />

focus for the city-region. It is the most advanced project in development terms of<br />

the SDS, and whilst significant progress has been achieved, e.g. Pacific Quay, the<br />

Exhibition Centre campus, Glasgow Harbour, Renfrew Riverside, the scale of the<br />

challenge remains strategically significant.<br />

2.5 Of all the areas listed as examples of where significant progress has been<br />

achieved, the Renfrew Riverside area – centred on Braehead – is the one which<br />

displays by far the greatest range of achievements in terms of sheer scale of<br />

urban renewal and environmental transformation, from a derelict contaminated<br />

power station site, disused railway sidings and run-down factories, to a thriving<br />

new business and residential community, with Braehead’s retail, leisure and<br />

community facilities at its heart. Without the success achieved at Braehead,<br />

3366706v3 P3


Proposed Mixed Use Development, Braehead : Socio-Economic Impact Report<br />

the strategy for regeneration on the Clyde Waterfront would still be at a<br />

relatively early stage. Similarly, without assurances as to the future long-term<br />

success of Braehead as a thriving economic catalyst, the next phase of<br />

regeneration of the Clyde Waterfront would be severely hindered.<br />

2.6 The Spatial Development Strategy of the SDP includes five ‘Spatial<br />

Frameworks’, relating to competitiveness, environmental action, sustainable<br />

communities, infrastructure, and strategic development priorities. As an<br />

introduction to the section which addresses the issue of sustainable<br />

communities, paragraph 4.64 of the SDP explains that the future economic<br />

growth and quality of life in the city-region depends on being able to meet basic<br />

demands and needs for the community, such as ensuring easy access to good<br />

quality housing and shopping facilities. These needs should be met in the<br />

most sustainably accessible locations, predominantly on brownfield land. This<br />

means focusing on regeneration and renewal of existing communities, and<br />

investing in the urban centres which are at the core of existing communities.<br />

2.7 Paragraph 4.96 of the SDP notes that the traditional role of the urban centre is<br />

usually characterised by their retail and civic functions, but that the role and<br />

function of many of the urban centres in the SDP area are changing and<br />

evolving in response to retail market demand and trends in society change.<br />

Many urban centres have become multi-dimensional in nature, with multiple<br />

roles, although each centre tends to have identifiable dominant roles which vary<br />

from centre to centre. Paragraph 4.97 identifies Braehead as being dominant<br />

in regeneration and retailing.<br />

2.8 Paragraph 4.98 explains that certain urban centres in the SDP area have been<br />

identified as having key strategic roles, and it is these centres which have been<br />

included in a ‘Network of Strategic Centres’ which are regarded as central to<br />

delivering the SDP’s Spatial Vision through its Spatial Development Strategy.<br />

These centres have a mixed use focus which consists of the following uses,<br />

features and activities: retail, culture, education, leisure, health, public realm,<br />

local governance, and public transport. Paragraph 4.99 stresses that Glasgow<br />

City Centre is at the apex of this network of strategic centres, and that its longterm<br />

future is fundamental to the economic well-being of the city-region.<br />

2.9 At the same time, while continuing investment and modernisation is required in<br />

the City Centre, the wider network of strategic centres beyond the City Centre<br />

“equally needs to be protected and enhanced” (paragraph 4.101), with a<br />

“channelling of investment to secure their respective roles, improve their quality<br />

of offer, their diversity, their public realm and environment, and their continuing<br />

sustainable accessibility”.<br />

2.10 Schedule 12 in the SDP sets out the Network of Strategic Centres, and lists<br />

their roles and functions and the strategy for managing change. Braehead is<br />

one of 23 strategic centres identified in the network.<br />

P4 3366706v3


Proposed Mixed Use Development, Braehead: Socio-Economic Impact Report<br />

SDP Approach to Braehead<br />

2.11 Under the heading ‘Current Planning Status / Dominant Roles and Functions’,<br />

Schedule 12 of the SDP describes Braehead as a ‘commercial centre with<br />

retail, leisure, commercial, employment and business’. Under the heading of<br />

‘Challenges’, the SDP identifies the need to diversify and roles and functions of<br />

the centre in support of the Clyde Waterfront regeneration initiative, with the<br />

aim of incorporating a range of functions including residential, civic, and<br />

transport and leisure sectors. The purpose of this development of Braehead is<br />

stated as being in order to “maintain the sustainability of the centre and wider<br />

regeneration programme, thereby contributing to a Strategic Development<br />

Priority – Clyde Waterfront”. The identified future action for Braehead is to bring<br />

forward a masterplan for a further regeneration of the centre and wider<br />

environment.<br />

2.12 Thus the vision for Braehead is to maintain its role of regenerating the<br />

surrounding area, as it has been doing for 15 years, with its retail, leisure,<br />

commercial, employment and business roles broadened to include residential<br />

and civic functions and expansion of transport and leisure facilities. In reality<br />

the residential role for Braehead is already well established, with more than<br />

1,000 homes recently built in the vicinity to the north and south of Kings Inch<br />

Road, and many more planned and consented.<br />

2.13 Background Report 11 – Retailing and Town Centres – (BR11) is one of a<br />

number of background papers which were prepared to support the Main Issues<br />

Report of the SDP. Subsequently a shorter version of the same document,<br />

renumbered BR14, was prepared to explain in more detail the policy<br />

approaches adopted by the SDP and to provide additional technical background<br />

information. These background papers were submitted to Scottish Ministers<br />

with the proposed SDP so that Ministers could have a full understanding of the<br />

evolution and intentions of the Plan.<br />

2.14 BR11 explains the background to the policy approach adopted for Braehead.<br />

BR11 notes that Braehead is the second-largest centre in the plan area, after<br />

Glasgow City Centre. In section 4.16 is states, “The role and function of<br />

Braehead is of vital importance. This commercial centre forms its own extensive<br />

catchment and draws expenditure from much of Glasgow and the Clyde Valley,<br />

and beyond. It is clearly of a strategic scale, but as a commercial centre it would<br />

be accorded less sequential priority than identified town centres. This issue<br />

needs to be addressed”.<br />

2.15 Having recognised the policy anomaly affecting Braehead, whereby the secondlargest<br />

strategic centre in the SDP area would have a planning status<br />

subordinate to many smaller and less important centres, BR11 continues by<br />

examining three possibilities for a policy resolution for Braehead. The three<br />

options discussed are:<br />

1 designation as a strategic town centre;<br />

2 having equivalence to other strategic centres but remaining as a<br />

commercial centre; or<br />

3366706v3 P5


Proposed Mixed Use Development, Braehead : Socio-Economic Impact Report<br />

3 remaining as a commercial centre and being subordinate to other<br />

strategic centres.<br />

2.16 Section 4.16 of BR11 reaches the conclusion that, “the most appropriate option<br />

is to recognise Braehead as an evolving town centre in a relationship with Paisley<br />

town centre, which fulfils a wider range of town centre functions and which has a<br />

distinctly different retail offer. This would allow the Local Development Plan to<br />

frame this policy and to support investment in Braehead on the basis of the<br />

relationship with Paisley”.<br />

The <strong>Renfrewshire</strong> Local Development Plan<br />

2.17 On 20 th November 2012 <strong>Renfrewshire</strong> <strong>Council</strong> approved its proposed Local<br />

Development Plan (replacing the previous 2006 Local Plan) and agreed to<br />

commence public consultation on the Plan in January 2013. The proposed LDP<br />

identifies a network of centres comprising Strategic Town Centres, Core Town<br />

Centres, Local Service Centres and Retail Warehouse Parks. Paisley and<br />

Braehead are identified as Strategic Town Centres at the top of the hierarchy.<br />

The proposed Plan states that <strong>Renfrewshire</strong> <strong>Council</strong> recognises that providing<br />

the policy backing of town centre status for Braehead is very important if the<br />

aim of the Strategic Development Plan for regeneration on the Clyde Waterfront<br />

is to be achieved.<br />

2.18 The proposed LDP comments: “There is a need for Braehead to continue to<br />

develop its town centre character, to reflect its identification as a new town<br />

centre in <strong>Renfrewshire</strong>. The LDP establishes a framework for a masterplan for<br />

Braehead. This spatial strategy connects Braehead to its adjacent communities,<br />

improves accessibility around and through the centre, enhances its commercial<br />

and business functions and delivers substantive enhancements to its public<br />

realm. All of this should aim to meet an overall objective of creating a modern<br />

and exemplary town centre environment”.<br />

2.19 As regards new retail development at Braehead, the proposed LDP recognises<br />

that the implication of its new town centre status is to allow further retail<br />

development, and comments: “There is a need for Braehead as a place to<br />

develop a town centre rather than shopping mall character and this must have a<br />

bearing on all proposals that emerge in the future”.<br />

2.20 Figure 11 in the proposed LDP summarises the strategy for each centre in the<br />

Network of Centres. It describes Braehead’s role and function as the “principal<br />

retail centre within <strong>Renfrewshire</strong> with strong supporting leisure, commercial and<br />

business uses”. Under the heading ‘Challenges / Opportunities’, the LDP<br />

states that the aim will be to “develop the town centre character, creating a<br />

sense of place and increasing connectivity between Braehead and Renfrew while<br />

developing a hub for public transport”. It states that there is a “significant<br />

opportunity for development of town centre uses that will continue to stimulate<br />

and complete the wider Clyde Waterfront regeneration”.<br />

2.21 Thus the overriding theme of the proposed LDP regarding Braehead is to confer<br />

town centre status and support development which will reinforce and extend its<br />

P6 3366706v3


Proposed Mixed Use Development, Braehead: Socio-Economic Impact Report<br />

central role as <strong>Renfrewshire</strong>’s primary shopping destination and key driver for<br />

regeneration of the Clyde Waterfront.<br />

Conclusions<br />

2.22 Braehead has been a primary driver for economic regeneration and urban<br />

renewal in <strong>Renfrewshire</strong> for 15 years. The substantial benefits which it has<br />

delivered during this period, and the essential role which it plays in meeting<br />

retail, leisure, employment and community needs, have been recognised in<br />

planning policy at strategic and local levels, which now supports further<br />

investment and regeneration at Braehead.<br />

3366706v3 P7


Proposed Mixed Use Development, Braehead : Socio-Economic Impact Report<br />

3.0 Baseline Conditions<br />

3.1 This section establishes the economic context, and any existing socio-economic<br />

impacts of the development site and its surroundings. It also defines the scope<br />

for the assessment of socio-economic effects by identifying the area likely to be<br />

most strongly affected by the development proposals, against which any future<br />

impacts can be measured.<br />

Area of Impact<br />

3.2 The area in which economic effects are most strongly felt will correspond to the<br />

labour catchment area of Braehead – the area which the majority of the workers<br />

based at the Centre live. Based on 2001 Census workplace data, some 86.3%<br />

of workers employed in <strong>Renfrewshire</strong> live in the local authorities of<br />

<strong>Renfrewshire</strong> or Glasgow City. More recent data, taken from the 2008 Annual<br />

Population Survey shows a slight decrease to this figure, with approximately<br />

73.5% of workers employed in <strong>Renfrewshire</strong> living within <strong>Renfrewshire</strong> or<br />

Glasgow City (see Tables 1 and 2 in Appendix 1). These local authorities have<br />

been taken to define the ‘labour catchment area’, or primary area of economic<br />

impact of Braehead, outlined in Figure 3.1.<br />

Figure 3.1 Main Impact Area and Sub-Regional Context<br />

Socio-Economic Conditions<br />

3.3 Key economic characteristics and trends in this labour catchment area are<br />

summarised below, with supporting statistical data contained in Appendix 1.<br />

P8 3366706v3


Proposed Mixed Use Development, Braehead: Socio-Economic Impact Report<br />

Economic Context<br />

3.4 The residential population of the local area in 2010 amounted to 763,100 of<br />

which 170,300 were resident in <strong>Renfrewshire</strong> (22.3%). 1 The population of<br />

<strong>Renfrewshire</strong> in 2001 was 172,900 and has fallen slightly by 2,600 people<br />

(1.5%) in the period 2001-2010; this compares with the positive growth rate for<br />

Scotland and Great Britain of 3.1% and 5.3% respectively. 2<br />

3.5 Total employment in the labour catchment area fell by 19,340 (4.1%) in the<br />

period 2001-2011 (Table 3, Appendix 1). The greatest decrease in the<br />

percentage of employment was in <strong>Renfrewshire</strong> (11.6%) followed by Glasgow<br />

City with a decrease of 9,831 people (2.5%).<br />

3.6 The employment structure of the labour catchment area is dominated by the<br />

service sector, which accounts for 87.9% (at 2011) of employment, a rise of 3%<br />

from 2001. However, this growth is below the average for Great Britain at<br />

approximately 4.6% over the same time period (Table 4, Appendix 1). Despite<br />

an increase in the proportion of service sector workers in the labour catchment<br />

area, (largely due to the workforce of other sectors shrinking) the quantity of<br />

service sector employees actually fell by 2,546 (0.6%) between 2001 and<br />

2011. Within the service sector, the retail sector accounts for 13.5% of total<br />

employment, this is lower than the Scotland (“Regional”) and GB averages<br />

(14.7% and 16.1% respectively). Health (15.7%), property and business<br />

activities (14.6%) and financial intermediation (12.1%) represent the three<br />

other largest sectors of employment.<br />

3.7 The most significant sector decline in employment terms has been<br />

manufacturing which decreased by 37.5% in the period 2001-2011, reducing its<br />

share of the workforce from 9.2% to 6% (Table 4 and 5, Appendix 1). Public<br />

administration and defence experienced an 18.8% decline in employment, from<br />

7.7% of the workforce in 2001 to 6.5% in 2011. This reflects the trend for<br />

Scotland as a whole with a national decline in manufacturing of 41.2% in the<br />

same period; however public administration saw a much smaller decrease in<br />

the proportion of its workforce at 5.5%. The fastest growth sector was financial<br />

and insurance, scientific and technical (57.2%) increasing its share of the<br />

workforce from 6.7% to 12.1%, this is however well below the average for<br />

Scotland which saw an increase of 103.5% in the same period. Although<br />

employment within wholesale and retail trades fell by 12.8% within the local<br />

area over the last decade, nationally this sector experienced a decline in<br />

employment of 15.2%.<br />

3.8 In the period 1997-2007, the number of VAT-registered firms increased by<br />

13.7% across the labour catchment as a whole, a similar rate to Scotland<br />

(15.5%) but below the average for Great Britain (21.3%). The growth rate in<br />

<strong>Renfrewshire</strong> alone was 17.3% (Table 6, Appendix 1).<br />

1 Mid-year population estimates, ONS<br />

2 Does not account for regional boundary changes<br />

3366706v3 P9


Proposed Mixed Use Development, Braehead : Socio-Economic Impact Report<br />

Deprivation<br />

3.9 Braehead is located on the border between the local authorities of Glasgow City<br />

and <strong>Renfrewshire</strong>. The Scottish Index of Multiple Deprivation 2009 provides a<br />

measure of multiple deprivation at small areas called datazones, much smaller<br />

than a local authority, based on indicators such as income, employment,<br />

health, education and crime.<br />

3.10 While much of <strong>Renfrewshire</strong> experiences relatively low levels of deprivation,<br />

significant pockets of deprivation exist within wards to the east of the local<br />

authority adjoining Glasgow City, close to both Paisley and Braehead.<br />

Approximately eight of these datazones appear in the top 5% of the most<br />

deprived areas in Scotland.<br />

3.11 Of the 694 datazones marked by this index in Glasgow City, approximately 325<br />

(47%) of them appear in the top 20% of the most deprived areas in Scotland,<br />

with 14 from the top 20 located in Glasgow City. The ranking represents an<br />

improvement on the 2004 SIMD whereby 17 of the top 20 most deprived areas<br />

in Scotland were found in Glasgow City including the entire top ten. In 2004,<br />

404 (58%) datazones out of 694 appeared in the top 20% of the most deprived<br />

areas in Scotland.<br />

Figure 3.2 Indices of Multiple Deprivation - Main Impact Area<br />

Source: SIMD 2009<br />

P10 3366706v3


Proposed Mixed Use Development, Braehead: Socio-Economic Impact Report<br />

Economic Developments<br />

3.12 The Clyde Waterfront Area where Braehead is located has a variety of<br />

developments either in the planning process, under construction or recently<br />

completed. Some of the major developments are highlighted below:<br />

a Junction 26: The development at Junction 26 will take place on a nine<br />

acre site and consists of proposals for a hotel, residential and further<br />

commercial uses to support and build on the success of Scotland’s first<br />

Infiniti car dealership and newly completed Costa Coffee Drive Thru store<br />

which have been delivered to date.<br />

b Situated next to the shopping centre is Renfrew Riverside which includes<br />

the Ferry Village residential development of more than 2,000 new homes<br />

and Riverside Braehead Business Park.<br />

c Royal Ordnance Site, Bishopton: the former Royal Ordnance site at<br />

Bishopton is one of the largest brownfield site regeneration projects in<br />

the UK. In partnership with <strong>Renfrewshire</strong> <strong>Council</strong> and the Scottish<br />

Environment Protection Agency (SEPA), site owner BAE Systems is driving<br />

a multi-million pound transformation over the next 15 years. Approval has<br />

been granted for a mixed use development comprising 2,500 units of<br />

housing, 150,000m2 of commercial and employment space within a<br />

business park, along with associated community facilities and local<br />

services. Around 4,000 full and part-time employment opportunities are<br />

expected to be created through the construction phases and operation of<br />

the planned commercial businesses.<br />

Local Labour Market Conditions<br />

3.13 The level of local claimant unemployment is relatively high, with approximately<br />

28,810 claimants across the labour catchment area in September 2012. Long<br />

term unemployment, defined by the proportion of the resident population<br />

claiming JSA over 12 months, is marginally higher than the average for Scotland<br />

(1.1%), with Glasgow City recording the highest rate of long term unemployment<br />

(1.7%) followed by <strong>Renfrewshire</strong> (1.4%).<br />

3.14 Among claimant unemployment workers in the labour catchment area, the most<br />

sought after occupations were elementary (31.5%, for example cleaners,<br />

labourers, refuse workers, food preparation etc) and sales and customer<br />

service occupations (28%, for example retail assistants). This accounts for<br />

greater than half of all jobs sought by claimants in the labour catchment area<br />

and broadly reflects national trends (Table 8, Appendix 1).<br />

3.15 Actual levels of unemployment are likely to be higher than claimant<br />

unemployment, as some residents opt not to register for out-of-work benefits.<br />

The unemployment rate within both <strong>Renfrewshire</strong> (9.3%) and Glasgow City<br />

(10.8%) exceeded the regional (7.9%) and national (8.1%) averages in June<br />

2012 (the most recent data available) (Table 8, Appendix 1).<br />

3366706v3 P11


Proposed Mixed Use Development, Braehead : Socio-Economic Impact Report<br />

3.16 The labour catchment area has a very weak local labour market with 7.8<br />

claimant unemployment workers per unfilled job centre vacancy. This is higher<br />

than the ratios for Scotland (5.1) and for GB (3.9) (Table 9, Appendix 1). The<br />

problem is most acute in Glasgow City (8.0).<br />

3.17 Average FTE wage levels in <strong>Renfrewshire</strong> are slightly (0.6%) above the national<br />

average (Table 11, Appendix 1). This contrasts with Glasgow City which has FTE<br />

weekly earnings of £460 per week, 8.5% below the national average.<br />

3.18 The labour force within the labour catchment area displays a wide disparity of<br />

occupation skill levels. Relatively low skilled workers are indicated through the<br />

higher proportion of elementary (13.1%) and sales and customer service<br />

occupations (9.5%) compared to Scotland (11.5%, 9.2% respectively) (Table 12,<br />

Appendix 1). Administrative occupations in the labour catchment area (10.6%)<br />

largely match the proportion seen in Scotland 10.9% and GB 11%. On the other<br />

hand, there are some high skilled groups in the labour catchment area<br />

including professional occupations (21.4%) which exceed the Scottish and GB<br />

averages (19% and 19.1%). However, fewer people work as managers/senior<br />

officials (7.6%) or associate professionals or in technical roles (12.9%) than<br />

seen in the average for Scotland (8.3% and 12.9%) or GB (10.1% and 14%)<br />

respectively.<br />

3.19 This disparity is also reflected in workforce skills. Both <strong>Renfrewshire</strong> and<br />

Glasgow City have a higher proportion of residents with NVQ4 or higher<br />

qualifications than the average for Scotland and Great Britain. For example, this<br />

proportion in Glasgow City is 7.2% higher than the national average at 40.1%.<br />

At the same time, the labour catchment area also has higher than national<br />

average proportion of residents with no qualifications. This is particularly the<br />

case within Glasgow City, where 16.6% of residents have no qualifications<br />

compared with a national average of 10.6% and an average for Scotland of<br />

11.6% (Table 13, Appendix 1).<br />

Existing Economic Contribution of Braehead<br />

3.20 Braehead, one of Scotland’s leading shopping destinations, makes a significant<br />

contribution to the local and regional economy. A recent report 3 commissioned<br />

by CSC and undertaken by NLP assessed the existing economic contribution of<br />

the development, and identified that:<br />

approximately 6,720 (4,620 FTE) jobs are directly supported at Braehead<br />

through the retail, catering, leisure and other tenants that occupy the<br />

Centre, representing around 9% of all jobs in <strong>Renfrewshire</strong> district;<br />

CSC and its partners employ just under 140 staff to support the day-today<br />

running of the centre;<br />

3 The Economic Contribution of Braehead Shopping Centre, Glasgow, NLP December 2012<br />

P12 3366706v3


Proposed Mixed Use Development, Braehead: Socio-Economic Impact Report<br />

between them, these employees generate just over £100 million Gross<br />

Value Added (GVA) per year to the local economy; and<br />

a further 1,900 indirect jobs linked to Braehead are supported across<br />

Scotland.<br />

3.21 It also identifies that CSC spend on average £4 million each year on ongoing<br />

capital expenditure (management, upgrade, maintenance and refurbishment<br />

work) at Braehead, in turn supporting further employment, expenditure and<br />

economic activity in the local area. Last year (2011), CSC and its tenants<br />

generated nearly £16 million of business rate revenue.<br />

3.22 Of the 6,720 direct jobs supported by Braehead’s retail and leisure tenants,<br />

approximately 550 (360 FTE) are estimated to be accommodated within the<br />

retail floorspace 4 that will be demolished and reprovided as part of the<br />

extension development.<br />

Retail Facilities<br />

3.23 Braehead Shopping Centre and Retail Park provides over one million square<br />

feet (circa 110,000m 2 ) of retail and leisure floorspace over two floors, and is<br />

anchored by Marks and Spencer, Primark and BHS. The centre accommodates<br />

125 units and attracts around 17 million visitors each year.<br />

4 80,902 sqft at Primark and 19,332 sqft at New Look<br />

3366706v3 P13


Proposed Mixed Use Development, Braehead : Socio-Economic Impact Report<br />

4.0 Potential Impacts<br />

Introduction<br />

4.1 This section identifies and assesses the scale and nature of the main socioeconomic<br />

impacts arising from the proposed development, including at both<br />

construction and operational stages.<br />

Construction Impacts<br />

Direct employment<br />

4.2 Construction employment will be a direct impact of the scheme and has been<br />

estimated based on a total construction cost for the built development and<br />

localised infrastructure of approximately £200 million 5 . An average 30% of the<br />

total cost is typically accounted for by labour costs, which equates to £60<br />

million. Dividing this figure by the gross average cost of construction labour in<br />

Scotland 6 , produces approximately 2,310 person-years of employment.<br />

4.3 An alternative approach is to divide total construction costs by the average<br />

turnover per employee in this sector in Scotland, which was £104,234 in<br />

2011 7 . This produces approximately 1,920 person-years of construction<br />

employment.<br />

4.4 This suggests that between 1,920 and 2,310 person-years of construction work<br />

would result directly from the proposed development. Since the build period for<br />

this development is anticipated to be spread over a 64 month (just over 5<br />

years) period, an overall average of between 360 and 433 temporary job<br />

opportunities per year could be directly created. In economic terms, there is a<br />

convention that 10 temporary construction jobs are equivalent to 1 Full Time<br />

Equivalent (FTE) jobs, so that up to approximately 231 FTE construction jobs<br />

will result in total.<br />

4.5 Given that national construction firms sometimes use their own permanent<br />

workforce on projects, but also employ contractors with a proportion of<br />

construction workers drawn locally, it is difficult to identify the likely source of<br />

workers to fill these construction jobs before contracts have been let. However,<br />

based on experience elsewhere it would be reasonable to expect a proportion<br />

of the construction jobs created by the proposed development could be taken<br />

5 This is a high level outline estimate of construction cost provided by the applicant.<br />

6 The mean gross annual wage of Skilled Construction and Building trades employees in Scotland was<br />

£23,598 in 2011 (Annual Survey of Hours and Earnings).10% has been added to this figure to cover<br />

overheads.<br />

7 Business Population Estimates for the UK and Regions 2011, BIS - total construction turnover in 2011 was<br />

estimated at £15,150,405,000 for Scotland, whilst total construction workers in Scotland was estimated at<br />

145,350.<br />

P14 3366706v3


Proposed Mixed Use Development, Braehead: Socio-Economic Impact Report<br />

up by the local workforce, therefore retaining economic benefits associated with<br />

construction employment locally, particularly if measures are in place to<br />

encourage local recruitment and to raise local skills levels.<br />

Indirect and induced employment<br />

4.6 In addition, it is also likely that some businesses in the local area, as well as<br />

the wider Scotland economy, would benefit from the trade linkages that would<br />

be established during the construction of the proposed development. This<br />

means that further indirect jobs would be supported locally in suppliers of<br />

construction materials and equipment. Local businesses would generally also<br />

benefit to some extent from temporary increases in expenditure as a result of<br />

the direct and indirect employment effects of the construction phase, for<br />

example, as construction workers spend wages in local shops and other<br />

facilities.<br />

4.7 Applying an employment multiplier of 1.2 to the FTE construction employment<br />

indicates that a further 46 FTE indirect / induced jobs could be supported in<br />

the impact area as a result of such construction related expenditure.<br />

4.8 Drawing together these various effects, the construction of the new<br />

development could generate up to 277 FTE jobs, thereby providing a range of<br />

employment benefits to residents of the local area.<br />

Gross Value Added<br />

4.9 The construction phase of the proposed development will also make a<br />

significant contribution to local Gross Value Added (GVA) which provides a<br />

measure of productivity. It is estimated that the development could deliver an<br />

additional £10.6 million of GVA 8 per year during construction, although it should<br />

be noted that not all of this will be retained locally.<br />

Operational Impacts<br />

4.10 The proposed development at Braehead comprises a range of retail and food<br />

and drink uses, a new arena and associated leisure uses, a hotel and transport<br />

interchange, all of which will generate employment, GVA and expenditure within<br />

the impact area once complete and operational. The following section<br />

estimates the nature and scale of these impacts.<br />

8 2011 Experian data suggests that the UK construction industry generates average GVA per employee of<br />

£38,350. This is applied to the net additional employment impact of the scheme (approximately 277 FTE<br />

jobs) to estimate additional GVA<br />

3366706v3 P15


Proposed Mixed Use Development, Braehead : Socio-Economic Impact Report<br />

Direct employment<br />

4.11 The level of direct employment associated with the proposed development has<br />

been estimated using ratios between job numbers and floorspace of the<br />

various employment generating uses proposed. This draws on CSC blended<br />

average employment densities generated by previous centre employment<br />

surveys/economic studies undertaken by NLP, operator estimates and<br />

published studies of employment densities 9 .<br />

4.12 As indicated in Table 4.1 below, the number of jobs generated for each use or<br />

facility is estimated by applying the appropriate ratio to the amount of net<br />

additional floorspace proposed in each case or the estimated operational staff<br />

for the facility. This produces approximately 2,650 jobs (2,090 FTE).<br />

Table 4.1 Job Generation of Proposed Development<br />

Proposed<br />

Use<br />

Department<br />

Class 1 Store<br />

(Retail) Other Retail<br />

Units<br />

Class 2<br />

and 3<br />

Class 7 Hotel<br />

Component Net<br />

Additional<br />

Floorspace<br />

Financial/<br />

Professional<br />

and Food and<br />

Drink<br />

Average Employment<br />

Density<br />

No. of Jobs<br />

Generated<br />

(m 2 ) Total FTE Total FTE<br />

21,660<br />

19,080<br />

3,100<br />

11,295<br />

(200 bed)<br />

1 job per<br />

20.3m 2<br />

1 job per<br />

16.9m 2<br />

1 job per<br />

8.7m 2<br />

1 job per<br />

21.7m 2<br />

1 job per<br />

26.1m 2<br />

1 job per<br />

11.8m 2<br />

1,067 998<br />

1,129 731<br />

356 263<br />

1 job per 3 bedrooms 67<br />

Class 11 Arena 18,844 † Operator Estimate 20<br />

Transport Interchange 7,978 Operator Estimate 7<br />

Total (rounded) 2,650 2,090<br />

Source: CSC/NLP survey, HCA/Offpat 2010, Operator Estimates<br />

† This figure refers to the new arena building rather than net additional arena floorspace<br />

4.13 In addition, a number of part time jobs (largely hospitality and catering) will be<br />

created at the new, larger arena. However, as this number will depend on the<br />

scale and frequency of events being held, these employment impacts have not<br />

been specifically quantified and considered as part of this assessment.<br />

4.14 The proposals will provide a mix of full-time and part-time employment<br />

opportunities, reflecting the mix of uses and facilities proposed within the<br />

development. FTE jobs in the development would be lower than the number of<br />

total jobs due to the large proportion of retail floorspace within the proposed<br />

9 2010 HCA/Offpat<br />

P16 3366706v3


Proposed Mixed Use Development, Braehead: Socio-Economic Impact Report<br />

development which are typically characterised by higher proportions of part time<br />

employees within their operations.<br />

4.15 Given the proportions of floorspace and the types of units proposed, the<br />

majority of these jobs (approximately 2,200 or 83%) will fall broadly within the<br />

retail sector. Table 4.2 below translates the potential retail sector employment<br />

generated by the scheme into occupations based on the occupational profile of<br />

retail employees in the UK as a whole. This indicates that opportunities would<br />

be provided at a range of skill levels, primarily sales and customer services, but<br />

also significant numbers of management as well as elementary and<br />

administrative occupations.<br />

Table 4.2 Retail Employment Generation by Occupation<br />

Occupation Retail Sector (% of<br />

Employees)<br />

National Profile<br />

Braehead Extension<br />

(Retail Jobs<br />

Generated)<br />

Managers and Senior Officials 18.2% 400<br />

Professional Occupations 2.1% 46<br />

Associate Professional and Technical<br />

Occupations<br />

4.5% 99<br />

Administrative and Secretarial Occupations 5.4% 119<br />

Skilled Trades Occupations 3.5% 77<br />

Personal Service Occupations 0.2% 4<br />

Sales and Customer Service Occupations 50.3% 1,107<br />

Process, Plant and Machine Operatives 3.5% 77<br />

Elementary Occupations 12.3% 271<br />

Total 100% 2,200<br />

Source: Skillsmart Retail (Sector Skills <strong>Council</strong>) 'The Age of Retail' July 2010 using 2009 Labour Force<br />

Survey Data (totals rounded)<br />

4.16 Overall, the proposals will create a substantial amount of direct new<br />

employment in the local (<strong>Renfrewshire</strong>) area, with a mix of full-time, permanent<br />

jobs, and flexible part-time opportunities spanning a range of occupation types<br />

and skill levels, but reflecting the retail-led nature of the scheme and the<br />

characteristics of employment within this sector.<br />

Net Additional Employment<br />

4.17 As part of the proposed development site is currently developed and in use<br />

(accommodating the existing Primark and New Look stores on the lower mall), a<br />

number of existing jobs on the site will be transferred into the new scheme<br />

(e.g. through the extension of the mall and alterations to existing units within<br />

the centre). Because these existing jobs (estimated to amount to c.550 or 360<br />

FTE) are associated with uses that will be retained/re-provided in the new<br />

scheme, the resulting effect will be a transfer rather than loss of employment.<br />

3366706v3 P17


Proposed Mixed Use Development, Braehead : Socio-Economic Impact Report<br />

4.18 In addition to existing jobs on the site, some employment generated may be<br />

displaced from elsewhere in the local area (e.g. retailers moving units from<br />

elsewhere in <strong>Renfrewshire</strong> and Glasgow to the Braehead development or new<br />

jobs being filled by employees drawn from existing retail operators in the local<br />

area). Net employment impacts in the main impact area have been estimated<br />

by considering the extent to which the proposed development would displace<br />

some jobs from existing local businesses, or prevent other employment<br />

development proceeding.<br />

4.19 The retail impact assessment which accompanies the planning application<br />

identifies that trade diversion from existing comparison floorspace in the<br />

<strong>Renfrewshire</strong> and wider Glasgow area would be limited, as a number of new<br />

retail developments are due to come on stream over the next few years across<br />

the West of Scotland which will reduce Braehead’s current turnover and shrink<br />

its wider trade draw. The Glasgow and The Clyde Valley SDP expects Glasgow<br />

City Centre to remain the principal retail destination in the plan area, and the<br />

retail impact analysis identifies that the proposed development at Braehead will<br />

not affect this commitment to the future role of the City Centre.<br />

4.20 The assessment estimates trade diversion associated with the proposed<br />

additional retail development at Braehead, taking account of factors such as<br />

the existing pattern of trade draw to Braehead, the location and nature of the<br />

main competing centres including those new developments which will have<br />

been implemented by 2018, and the extent to which the expanded Braehead<br />

facilities are likely to be sufficiently attractive to divert trade from other centres.<br />

Compared with expected turnover in 2018 without any investment/expansion,<br />

this trade diversion analysis indicates a 46% increase in turnover at Braehead,<br />

at the expense of a 9% reduction at the retail park, 1% reduction in Glasgow<br />

City Centre, 9.1% reduction at Glasgow Harbour and 7.3% reduction at<br />

Silverburn. However, in all instances the estimated levels of trade diversion are<br />

well within tolerance levels for the affected centres and most centres can<br />

expect to be trading at well above benchmark levels following the Braehead<br />

development (the two exceptions being the Braehead retail park and Glasgow<br />

Harbour).<br />

4.21 As such, displacement effects are expected to be low, and as a broad estimate<br />

it is assumed that no more than 5% of the additional jobs created by the<br />

proposed development will result from displacement of the retail and other jobs<br />

from elsewhere in the local area. This equates to 133 (105 FTE) jobs.<br />

4.22 Overall, after allowing for such displacement effects, the net additional jobs<br />

resulting from the proposed development are estimated to be in the order of<br />

2,520 (1,990 FTE) at the local level, as shown in Table 4.3 below.<br />

P18 3366706v3


Proposed Mixed Use Development, Braehead: Socio-Economic Impact Report<br />

Table 4.3 Net Additional Employment<br />

Total Jobs FTE Jobs<br />

Gross job generation of proposed development 2,650 2,090<br />

Less job displacement in Local Area (5%) 133 105<br />

Net additional employment 2,520 1,990<br />

Source: NLP analysis (totals rounded)<br />

Gross Value Added<br />

4.23 As with the construction phase of the development, the operational phase will<br />

also make a significant contribution to local GVA by supporting the creation of<br />

new employment. Between them, the net additional direct jobs generated by<br />

the proposed extension could deliver an additional £45 million of GVA per year<br />

for the local economy (Table 4.4). This is equivalent to 1.4% of the total GVA<br />

generated across the whole of <strong>Renfrewshire</strong>’s economy in 2012.<br />

Table 4.4 Operational GVA Impacts (Net Additional)<br />

Proposed Use No of FTE Jobs Average GVA<br />

per FTE †<br />

Total GVA<br />

Retail 1,643 £24,380 £40.1m<br />

Financial/Professional<br />

and Food and Drink<br />

250 £13,395 £3.3m<br />

Hotel 64 £20,080 £1.3m<br />

Arena/Leisure 19 £11,480 £218,110<br />

Transport Interchange 6 £25,040 £150,220<br />

Total (rounded) 1,990 £45m<br />

Source: Annual Business Inquiry 2008 / NLP analysis<br />

† Based on ABI 2008 GVA data (Scotland)<br />

Indirect/Induced Employment<br />

4.24 Indirect jobs will be supported by the spending on goods, supplies and<br />

services, of the retail and other operators based on site with firms in the<br />

surrounding area. The spending of wages by both employees of firms on the<br />

site and of the local firms supplying goods and services to these companies<br />

will also support induced employment in other local shops, other services and<br />

other firms. These types of employment are normally estimated using<br />

employment multipliers derived from research on similar operations elsewhere,<br />

with adjustments to reflect the specific characteristics of the proposed<br />

development, the amount of spending retained in the local area, and local<br />

economic and labour market conditions.<br />

3366706v3 P19


Proposed Mixed Use Development, Braehead : Socio-Economic Impact Report<br />

4.25 Based on the characteristics of the proposed development, its local economic<br />

context and labour market, a combined employment multiplier of 1.2 is<br />

considered appropriate to estimate both indirect and induced employment for<br />

the main impact area of <strong>Renfrewshire</strong> and Glasgow, while a multiplier of 1.4 is<br />

assumed to reflect regional job impacts, in the context that many occupiers will<br />

be national retailers. Applying this local area multiplier to the estimated 1,990<br />

net additional direct FTE jobs results in a further 400 ‘spin-off’ FTE jobs in local<br />

services and other firms in the area.<br />

4.26 On this basis, the operational phase of the proposed development is estimated<br />

to support, directly and indirectly, 2,920 net additional direct and indirect jobs<br />

in total across the main impact area. Across the region (i.e. Scotland), a similar<br />

calculation indicates that 3,320 net additional, direct and indirect operations<br />

related jobs would be generated, including those in the main impact area.<br />

Table 4.5 Gross Employment Related to scheme in the Impact Area<br />

Type of Employment Total Jobs FTE Jobs<br />

Direct net additional 2,520 1,990<br />

Multiplier of 1.2 (on FTE Jobs)<br />

Indirect/Induced Jobs in Impact Area 400 400<br />

TOTAL (Net Additional) 2,920 2,390<br />

Source: NLP analysis (totals rounded)<br />

Table 4.6 Gross Employment Related to scheme in the Region<br />

Type of Employment Total Jobs FTE Jobs<br />

Direct net additional 2,520 1,990<br />

Multiplier of 1.4 (on FTE jobs)<br />

Indirect/Induced Jobs in Region (inc. Impact Area<br />

induced jobs)<br />

800 800<br />

TOTAL (Net Additional) 3,320 2,790<br />

Source: NLP analysis (totals rounded)<br />

4.27 These total employment figures would represent an increase of 3.5% (2,520)<br />

over the existing employment baseline in terms of net additional jobs to<br />

<strong>Renfrewshire</strong>; 0.6% (2,920) increase in the impact area (<strong>Renfrewshire</strong> and<br />

Glasgow) and 0.1% (3,320) increase over the existing baseline in terms of<br />

additional jobs to the region (Scotland). Within the context of the recent<br />

recession and the need for private sector led job growth to drive short and<br />

medium term economic prosperity, the levels of employment proposed – whilst<br />

relatively small at the impact and regional area – are nonetheless significant.<br />

P20 3366706v3


Proposed Mixed Use Development, Braehead: Socio-Economic Impact Report<br />

Impact on Retail and Leisure Facilities<br />

4.28 Retail impact analysis undertaken as part of the planning application<br />

submission indicates that the effect of the proposed extension to Braehead’s<br />

retail and leisure floorspace will serve to restore the Centre’s turnover by 2018<br />

to the level which would have been achieved in 2008 based on 2004 shopping<br />

patterns, before allowing for the effect of the Silverburn retail development at<br />

Pollok, which has impacted negatively upon Braehead’s market share.<br />

4.29 A number of significant new retail developments are expected to come on<br />

stream over the next few years which are likely to greatly reduce Braehead’s<br />

current turnover, particularly within Glasgow City Centre with current proposals<br />

to extend the Buchanan Galleries development. At the same time, the retail<br />

impact analysis predicts that Braehead’s wider trade draw will also shrink as it<br />

relies to a greater extent upon locally generated expenditure, as new retail<br />

developments in the wider catchment consume trade which might otherwise<br />

have been attracted to an expanded Braehead. As a result, the ability of<br />

Braehead to continue to function as a catalyst for economic regeneration on<br />

the Clyde Waterfront would be seriously undermined, and its role as an<br />

economic driver could potentially diminish.<br />

4.30 It is crucial that Braehead continues to provide a competitive retail and leisure<br />

offer (in terms of both floorspace and market appeal) in order for the Centre to<br />

effectively compete with these other planned developments and ensure that the<br />

Strategic Development Plan’s aims for continued economic regeneration along<br />

the Clyde Waterfront are realised. The proposed development at Braehead will<br />

specifically meet this identified need to maintain its existing status as a<br />

strategic centre. If new retail and leisure accommodation is not provided at<br />

Braehead, or is delayed, then existing retailers may be drawn elsewhere, new<br />

retailers will not be attracted to the Centre and customers will increasingly look<br />

to other centres for shopping, which may involve travelling longer distances.<br />

4.31 The SDP and proposed LDP recognise the need for the regeneration of the<br />

Braehead Centre and that diversification of its roles and functions should be<br />

encouraged. Diversification to deliver a wider range of roles and functions can<br />

only be made viable by reinforcement of its principal role as a retail and leisure<br />

destination, so that those other functions can flourish in association with its<br />

established role. The retail impact analysis identifies that because Braehead’s<br />

role is currently under threat, a strategy for new investment is vital.<br />

4.32 As well as delivering an enhanced retail offer, the proposed development will<br />

also enhance Braehead’s reputation as a leading venue for leisure facilities by<br />

providing a new multi-functional 5,000 seat arena. This will accommodate the<br />

capacity for larger, higher value and higher profile events that the existing arena<br />

is unable to attract. This in turn will impact upon the local economy by<br />

supporting ancillary services such as hotels and restaurants, improving<br />

perceptions of the area, and stimulating further investment in the surrounding<br />

area as developer confidence grows. The new arena building will also provide<br />

conferencing facilities, supported by a new hotel providing on-site<br />

accommodation for delegates. It will also enable Braehead to more effectively<br />

3366706v3 P21


Proposed Mixed Use Development, Braehead : Socio-Economic Impact Report<br />

compete with nearby venues such as the Scottish Exhibition and Conference<br />

Centre in Glasgow, to attract top concerts, shows and events to <strong>Renfrewshire</strong>.<br />

4.33 The provision of a new public square will bring about a step-change in the<br />

quality of public realm at Braehead, substantially improving the external<br />

environment, its accessibility, its attractiveness as a place to live, work, shop<br />

and relax, and its ability to meet the needs of its catchment population who rely<br />

on it for a wide range of services and functions.<br />

Impact on Regeneration and Deprivation<br />

4.34 Braehead is located on the eastern border of <strong>Renfrewshire</strong> adjoining Glasgow<br />

City, an area which is characterised by pockets of relatively high levels of<br />

deprivation. Its development has acted as a major economic stimulus in an<br />

area of relatively high unemployment and poor image, raising investor<br />

confidence and helping attract further investment to the surrounding area. As<br />

part of the wider Clyde Waterfront renewal, Braehead now has the potential to<br />

transform the area into an internationally competitive 'central belt' for<br />

business, employment, living and tourism.<br />

4.35 The Glasgow and Clyde Valley Strategic Development Planning Authority has<br />

outlined its strategic aims within the Joint Structure Plan (2008) which include<br />

increasing economic competitiveness, promoting greater social inclusion and<br />

integration. Specifically, it aims to improve overall quality of life for local<br />

communities by improving access to local employment, shopping, social and<br />

cultural facilities.<br />

4.36 In this context, the extension proposals will not only provide an enhanced retail<br />

and leisure offer for <strong>Renfrewshire</strong>, but also provide access to employment<br />

across a range of skill levels, community facilities and social opportunities. It<br />

will also bring substantial economic benefits, including business investment<br />

and 2,510 net additional direct permanent jobs to <strong>Renfrewshire</strong>, which in turn<br />

will support wider residential, commercial and infrastructure development,<br />

creating a balanced community which is key to the successful wider<br />

regeneration of the Clyde Waterfront area.<br />

4.37 The development proposals will also enhance Braehead’s existing transport<br />

infrastructure (which currently comprises a dedicated bus station and travel<br />

information centre) by providing a new state of the art transport interchange to<br />

enhance local accessibility and support the development of a more sustainable<br />

public transport network in the local area. This will include a new Fastlink bus<br />

service route – a regional bus rapid transit system serving key sites along the<br />

northern and southern banks of the River Clyde including Braehead, Glasgow<br />

City and Paisley town centre.<br />

Maximising the Impacts<br />

4.38 Whilst the socio-economic impacts of the proposals will largely be positive, the<br />

pro-active use of a number of approaches and measures could enhance and<br />

P22 3366706v3


Proposed Mixed Use Development, Braehead: Socio-Economic Impact Report<br />

maximise the extent of these benefits upon the local economy. Specific<br />

measures that could be adopted are indicated below.<br />

During construction<br />

4.39 The main socio-economic impacts from construction will relate to employment<br />

generation and investment in the scheme. These positive aspects may be<br />

maximised by encouraging local recruitment and identifying any current training<br />

initiatives that could be tapped into.<br />

4.40 As indicated previously, national construction firms often use their own<br />

permanent workforce on projects, but also employ contractors with a proportion<br />

of construction workers drawn locally. CSC has engaged in discussion with a<br />

number of potential construction firms, and whilst no firm agreement with any<br />

one has been reached, a number of measures have been discussed such as:<br />

i Providing the opportunity for local labour resources to be used<br />

where possible, including sub-contracting of construction services<br />

to local firms, encouraging recruitment through local press and local<br />

job centres and introducing community benefit clauses in<br />

construction contracts;<br />

ii Providing apprenticeships and work experience opportunities, with<br />

initial estimates that circa 5% of the peak construction labour<br />

demand could be filled by apprentices from the local labour force<br />

and a large number of work experience days could be supported for<br />

NEETs and other young people. There is the opportunity for this to<br />

be undertaken in conjunction with local skills partners; and<br />

iii Promoting sub-contract and supply opportunities to local firms to<br />

seek to establish a supply chain based in the <strong>Renfrewshire</strong> and<br />

wider Glasgow area both encouraging sustainable sourcing of<br />

materials/labour (short transport distances) as well as retaining<br />

economic benefits locally.<br />

4.41 These measures are typically subject to discussion with the relevant authority<br />

with targets for local recruitment set and may form part of any planning<br />

obligations agreed between CSC and <strong>Renfrewshire</strong> <strong>Council</strong>. However, CSC are<br />

committed to providing measures for such local employment and training<br />

support, recognising the benefits this can provide to the local area.<br />

After completion<br />

4.42 While the proposed development is anticipated to deliver a range of local<br />

economic benefits, these could be maximised through measures to encourage<br />

local recruitment for the new job opportunities offered in the longer term<br />

operation of the proposed development.<br />

4.43 For example, CSC are committed to promoting a package of measures to<br />

promote jobs in the retail industry and enhance skills. It is anticipated that this<br />

will follow CSC’s programmes at a number of their other shopping centre<br />

3366706v3 P23


Proposed Mixed Use Development, Braehead : Socio-Economic Impact Report<br />

developments, including most recently where the Retail Gold scheme has been<br />

established by CSC and the Newcastle Education Business Partners as part of<br />

CSC’s interests in Eldon Square shopping centre in Newcastle and the<br />

MetroCentre shopping centre in Gateshead. The scheme aims to support upskilling<br />

in the labour force by providing retail placements for students studying<br />

vocational retail based qualifications (e.g. BTECs) as well as providing support<br />

for students with CVs and interview skills etc.<br />

4.44 More specifically, CSC will work with <strong>Renfrewshire</strong> <strong>Council</strong> and the local<br />

Employability Partnership to promote and maximise the new employment<br />

opportunities generated by the proposed development in order to benefit local<br />

people. Together with local job centres, the <strong>Council</strong> will play a key role in<br />

assisting this process with increased support for pre vocational training to<br />

ensure that appropriate skills are available to the local workforce. Potential<br />

measures could include an Employment Recruitment Centre to ensure new job<br />

opportunities are accessible to local communities (a model which has been run<br />

successfully at Glasgow Airport and is about to be delivered in Hillington<br />

Industrial Park) and tapping into the <strong>Council</strong>’s £2.5million Invest in<br />

<strong>Renfrewshire</strong> programme whereby local companies provide opportunities for 18-<br />

24 year-olds in return for wage and apprenticeship subsidies, small loan funds<br />

and retail improvement grants.<br />

4.45 These measures will help maximise the benefits to the local labour market by<br />

ensuring people with the right skills are matched to the retail jobs created and<br />

creating a structured placement scheme to develop skills in the local workforce.<br />

4.46 In addition, CSC will endeavour (and encourage its sub-contractors) to source<br />

goods and services from local suppliers to support its ongoing programme of<br />

capital expenditure and development at Braehead. For example, this could<br />

include:<br />

Taking active steps to inform companies in the <strong>Renfrewshire</strong> and wider<br />

Glasgow area of opportunities to tender for the supply of ongoing goods<br />

and services once the proposed development is operational.<br />

Advertising tendering opportunities to small and medium sized<br />

enterprises that are based in the <strong>Renfrewshire</strong> and wider Glasgow area<br />

through local business networks.<br />

P24 3366706v3


Proposed Mixed Use Development, Braehead: Socio-Economic Impact Report<br />

5.0 Wider Economic Role & Attraction of<br />

Investment<br />

5.1 This section identifies the wider economic role that the development of<br />

Braehead has had in supporting the regeneration of the Clyde waterfront and<br />

attracting additional investment to the area. It draws on earlier economic<br />

analysis of the Centre prepared by NLP and OXIRM. 10<br />

Origins of the Braehead Shopping Centre<br />

5.2 The site on which the Braehead development is now located was once<br />

industrial land and part of the former Braehead Power Station, but had largely<br />

become vacant and neglected by the 1990s. The location was surrounded by<br />

large-scale industrial activities such as scrap metal processing, steel<br />

fabrication, whisky bottling, animal feed processing and a container depot. The<br />

site was environmentally unattractive with a line of electricity pylons, presenting<br />

high remediation and development costs. It also formed part of an extensive<br />

area of partly derelict former industrial land running along the south bank of the<br />

River Clyde following the long period of decline of ship building and port-related<br />

industries that commenced from the 1960s onwards.<br />

5.3 A planning application for the Braehead complex, including the shopping centre,<br />

was first submitted by the Clyde Port Authority in 1987. Permission was granted<br />

by the then Secretary of State for Scotland on appeal in 1990, after initial<br />

refusal by the then Strathclyde Regional <strong>Council</strong>, identifying the following<br />

factors in support of the proposals:<br />

a restoring and making positive use of a large unused site, largely through<br />

private investment, that would otherwise be unlikely to be achieved in the<br />

near future without considerable public expense;<br />

b the creation of in excess of 1,000 net jobs;<br />

c providing an attractive, high quality development with leisure elements<br />

that would attract visitors from a wide area and would contribute towards<br />

urban renewal and regeneration of the area; and<br />

d providing retail facilities that would more than compensate for any<br />

deterioration in existing centres and the net overall gain in the range and<br />

attractiveness of the shopping facilities serving the area.<br />

5.4 In 1992, the site was acquired from the Clyde Port Authority by Marks &<br />

Spencer plc and J. Sainsbury plc. A detailed masterplan for the site was<br />

submitted in 1993 and full planning permission was granted in May 1996.<br />

10<br />

Economic Study of Braehead Shopping Centre, Nathaniel Lichfield & Partners and Oxford Institute of Retail<br />

Management, 2005.<br />

3366706v3 P25


Proposed Mixed Use Development, Braehead : Socio-Economic Impact Report<br />

5.5 In January 1995, CSC bought the site and announced a partnership with Marks<br />

& Spencer plc and J. Sainsbury to develop it. Planning permission for an<br />

amended scheme was granted in May 1997. Initial work on site had<br />

commenced in 1996 and the Centre opened in 1999, at a cost of about £285<br />

million to build.<br />

Catalyst for Regeneration<br />

5.6 Braehead Shopping Centre and Retail Park now has over one million square<br />

feet of shopping and leisure facilities and attracts 17 million visitors annually. It<br />

has provided the catalyst for one of the largest privately funded waterside<br />

regeneration projects in the country.<br />

5.7 The construction of Braehead Shopping Centre constituted the first significant<br />

new development in the area for many years, and also brought substantial new<br />

transport infrastructure to the location including new road links and bus station<br />

with a range of routes to the surrounding area. More generally, the initial<br />

development was able to raise both developer and occupier confidence in the<br />

area and fund the large amount of infrastructure needed to kick-start<br />

regeneration. It also helped change the image and perceptions of the area from<br />

one of dereliction and distinguish it from other areas of vacant brownfield land<br />

along the Clyde. The scope of the investment at Braehead now extends much<br />

further than the original shopping centre complex, and across a full range of<br />

land-uses and supporting infrastructure.<br />

5.8 The original shopping centre was immediately followed by a first phase of other<br />

investments:<br />

a £35 million IKEA store, with an estimated 500 jobs, was developed on an<br />

adjoining site one year after Braehead opened;<br />

b £15 million Audi ‘Centre of Excellence’ opened in 2004, creating the<br />

world’s largest Audi retail venue, alongside restaurant and conferencing<br />

facilities;<br />

c £65 million Xscape leisure complex opened in 2006, generating 800<br />

jobs; and<br />

d £12.5 million Scottish headquarters for Porcelanosa was completed in<br />

2008.<br />

5.9 Subsequent investments were not just limited to retail and leisure activities,<br />

but also included new provision for business space. Titanium Business Park<br />

was the first phase of what has subsequently expanded into<br />

braehead4business, marketed as Scotland’s “Premier Business Quarter.” This<br />

comprises a further three business parks – Riverside, Platinum and Shiel’s<br />

Gate. Braehead now has a significant track record in attracting corporate<br />

occupiers, including:<br />

a Ceridian, one of the largest providers of HR outsourcing services in the<br />

world, created 200 new jobs when it located at Titanium Business Park in<br />

2011;<br />

P26 3366706v3


Proposed Mixed Use Development, Braehead: Socio-Economic Impact Report<br />

b relocation of Campbell Dallas LLP, one of Scotland’s leading accountancy<br />

firms, to Titanium 1 in 2011;<br />

c one of Scotland’s fastest growing software development businesses, The<br />

Solution Works, moved to new offices at Riverside Business Park in<br />

2010.<br />

5.10 Taken together, these developments illustrate the broad appeal of this location<br />

for a range of investment. This reflects the commercial success, range of<br />

facilities, improved infrastructure and good transport links that have derived<br />

from the presence of the Braehead Shopping Centre.<br />

Conclusions<br />

5.11 Alongside public sector initiatives, the development at Braehead has stimulated<br />

the wider regeneration of the Clyde Waterfront. Two decades ago, the area was<br />

characterised by high unemployment, a lack of investment and large areas of<br />

derelict land.<br />

5.12 The original Braehead Shopping Centre scheme which opened in 1999 was<br />

entirely the result of private sector investment, delivering significant new<br />

infrastructure and providing a clear signal of investor confidence in the area.<br />

The Centre’s development provided a critical mass of investment at an early<br />

stage able to help address the substantial remediation challenges that existed.<br />

The development also came at a time when the regeneration of the wider Clyde<br />

Waterfront was still very much in its infancy. The Centre has since provided the<br />

platform for further public sector initiatives, through Renfrew Riverside and its<br />

partners.<br />

5.13 Significant further investment has been attracted around the Braehead site in<br />

which CSC continues to have a leading role. The Centre appears to have<br />

accelerated development activity on surrounding sites, significantly enhancing<br />

investor confidence through its scale, profile and success in commercial terms.<br />

The proposed mixed use development will cement Braehead’s position as a<br />

focus for growth, anchor further investment, and support the diversification of<br />

the centre in support of its role as a new Strategic Town Centre in<br />

<strong>Renfrewshire</strong>.<br />

3366706v3 P27


Proposed Mixed Use Development, Braehead : Socio-Economic Impact Report<br />

6.0 Conclusions<br />

6.1 Overall, the proposals will deliver an expanded Centre at Braehead, cementing<br />

its status as one of Scotland’s leading retail and leisure destinations. The<br />

development will generate a wide range of direct, indirect and catalytic<br />

economic effects, both quantifiable and non-quantifiable. These effects will be<br />

spread over a wide area, but are likely to be focused on the local authority<br />

areas of <strong>Renfrewshire</strong> and Glasgow City which is taken to be the main impact<br />

area.<br />

6.2 The labour catchment area is characterised by population decline, high levels of<br />

unemployment and localised incidences of deprivation. However, the Clyde<br />

Waterfront area – which in the past has been characterised by a lack of<br />

investment and large areas of derelict land – has undergone significant<br />

regeneration in recent years, with the shopping and leisure facilities at<br />

Braehead at the heart of this transformation, stimulating confidence and further<br />

investment in the area.<br />

6.3 Based on the preceding sections, the most significant impacts of the proposed<br />

development on the local economy would be:<br />

a A capital investment of approximately £200 million over 5 years;<br />

b Up to 2,310 person-years of temporary construction work spread over a<br />

c.5 year period;<br />

c Approximately 2,650 direct permanent job opportunities to be created<br />

directly on site once the development is complete, in an area which has<br />

undergone recent employment decline;<br />

d 2,920 net additional direct and indirect job opportunities in total in the<br />

local area and 3,320 net additional direct and indirect job opportunities<br />

spread across the region (including those in the local area and on the<br />

site);<br />

e GVA generated by the construction and operational phases of the<br />

development amounting to £55.6 million per annum, providing a<br />

significant boost to the local economy;<br />

f Wider economic benefits, including maintaining and enhancing<br />

Braehead’s role as a Strategic Centre, providing major employment<br />

benefits to the local labour market and providing a catalyst for wider<br />

regeneration of the surrounding Clyde Waterfront area.<br />

6.4 The proposals will have substantial beneficial economic impacts in the labour<br />

catchment area (<strong>Renfrewshire</strong> and Glasgow City) through the creation of a<br />

range of new jobs at both construction and operational stages and the<br />

implications of these on addressing unemployment and skills deprivation within<br />

the local labour force. These impacts will help tackle deprivation and underpin<br />

regeneration on Renfrew Riverside, complementing regeneration activity within<br />

other parts of the wider Clyde Waterfront area.<br />

P28 3366706v3


Proposed Mixed Use Development, Braehead: Socio-Economic Impact Report<br />

6.5 The proposed development will also contribute positively to the retail offer in<br />

<strong>Renfrewshire</strong>, providing new retail and leisure facilities to help enhance both<br />

the daytime and evening economy. It will also help to maintain Braehead’s role<br />

as a strategic centre and act as a catalyst to attract new operators and<br />

investment to the area.<br />

6.6 Overall, the proposals represent a significant new capital investment in the<br />

area and will raise the overall level of economic activity and expenditure in the<br />

local area, helping to achieve the socio-economic policy objectives of economic<br />

prosperity and delivering access to job opportunities. The development will<br />

expand the range of facilities at Braehead and help to further diversify the<br />

functions of the centre in support of its role as a new town centre in<br />

<strong>Renfrewshire</strong>.<br />

3366706v3 P29


Proposed Mixed Use Development, Braehead: Socio-Economic Impact Report<br />

7.0 Abbreviations<br />

1 CSC - Capital Shopping Centres<br />

2 ABI - Annual Business Enquiry<br />

3 BRES - Business Register and Employment Survey<br />

4 SPD - Strategic Development Plan<br />

5 LDP - Local Development Plan<br />

6 SDS - Spatial Development Strategy’<br />

7 BR - Background Report<br />

8 VAT - Value Added Tax<br />

9 SIMD - Scottish Index of Multiple Deprivation<br />

10 SEPA - Scottish Environment Protection Agency<br />

11 JSA - Job Seekers Allowance<br />

12 GB - Great Britain<br />

13 FTE - Full Time Equivalent<br />

14 NVQ - National Vocational Qualification<br />

15 GVA - Gross Value Added<br />

16 NEET - Not in Education, Employment or Training<br />

17 BTEC - Business and Technology Education <strong>Council</strong><br />

18 ONS - Office for National Statistics<br />

P30 3366706v3


Proposed Mixed Use Development, Braehead: Socio-Economic Impact Report<br />

8.0 References<br />

1 Glasgow and The Clyde Valley Strategic Development Plan (SDP), Glasgow<br />

and the Clyde Valley Strategic Development Planning Authority, May 2012<br />

2 <strong>Renfrewshire</strong> Local Plan, <strong>Renfrewshire</strong> <strong>Council</strong>, Adopted March 2006<br />

3 The Economic Contribution of Braehead Shopping Centre, Glasgow, NLP<br />

December 2012<br />

4 2001 Census, ONS, 2001<br />

5 Business Register and Employment Survey (BRES), ONS, 2008-2011<br />

6 Annual Business Inquiry (ABI), ONS, 1998-2008<br />

7 Annual Population Survey, Nomis, 2008<br />

8 Annual Survey of Hours and Earnings, ONS, 2011<br />

9 VAT registrations/de-registrations by industry, BERR 1997-2007<br />

3366706v3 P31


Proposed Mixed Use Development, Braehead: Socio-Economic Impact Report<br />

Appendix 1 Socio Economic Data<br />

Table 1: Area of Residence of <strong>Renfrewshire</strong> based Employees (Census 2001)<br />

Area<br />

% of<br />

Employees<br />

living in Area<br />

Cumulative %<br />

<strong>Renfrewshire</strong> 60.7 60.7<br />

Glasgow City 25.6 86.3<br />

Various other districts 13.7 100.0<br />

Source: 2001 Census Scottish travel flows (local authority) for full and part time employed<br />

Table 2: Area of Residence for <strong>Renfrewshire</strong> based Employees (APS 2008)<br />

Area<br />

% of<br />

Employees<br />

living in Area<br />

Cumulative %<br />

<strong>Renfrewshire</strong> 60.3 60.3<br />

Glasgow City 13.2 73.5<br />

Various other districts 26.5 100.0<br />

Source: 2008 Annual Population Survey<br />

Table 3: Changes in Employment 2001-2011<br />

Area 2001 2011 % Change<br />

<strong>Renfrewshire</strong> 82,207 72,698 -11.6<br />

Glasgow City 394,698 384,867 -2.5<br />

Source: 2001 Annual Business Inquiry and 2011 Business Register and Employment Survey (2001<br />

ABI data scaled to be consistent with current BRES estimates)<br />

P32 3366706v3


Proposed Mixed Use Development, Braehead: Socio-Economic Impact Report<br />

Table 4: Employment by Main Industrial Sectors<br />

Sector<br />

Agriculture, forestry,<br />

fishing, mining and utilities<br />

Labour Catchment<br />

Area (%)<br />

Scotland<br />

(%)<br />

Great Britain (%)<br />

2001 2011 2011 2001 2011<br />

1.1 1.5 4.2 1.7 2.1<br />

Manufacturing 9.2 6 7.7 14.1 8.7<br />

Construction 4.8 4.6 5.5 4.5 4.6<br />

Wholesale and retail trade;<br />

repair of motor vehicles,<br />

motorcycles and personal<br />

and household goods<br />

Transport, storage and<br />

communication<br />

14.9 13.5 14.7 17.8 16.1<br />

7 7.4 6.6 6.1 8.5<br />

Hotels and restaurants 6.1 6.2 7.1 6.5 6.8<br />

Financial intermediation 6.7 12.1 9.8 4.3 11.2<br />

Real estate, renting and<br />

business activities<br />

Public administration and<br />

defence<br />

15.7 14.6 9 15.3 9.7<br />

7.7 6.5 6.4 5.1 5.2<br />

Education 8.4 7.4 8.2 8.4 9.4<br />

Health and social work 12.9 15.7 16.3 10.8 13.2<br />

Other community, social<br />

and personal service<br />

activities<br />

5.5 4.5 4.5 5.2 4.5<br />

Source: 2001 Annual Business Inquiry and 2011 Business Register and Employment Survey (2001<br />

ABI data scaled to be consistent with current BRES estimates)<br />

3366706v3 P33


Proposed Mixed Use Development, Braehead: Socio-Economic Impact Report<br />

Table 5: Change in Employment Structure in Labour Catchment Area<br />

Sector<br />

Agriculture, forestry, fishing,<br />

mining and utilities<br />

2001<br />

(000s)<br />

Labour Catchment Area Scotland<br />

2011<br />

(000s)<br />

% change<br />

2001 – 2011<br />

(% change)<br />

5,289 6925 +30.9 +10.7<br />

Manufacturing 43,838 27,382 -37.5 -41.2<br />

Construction 22,866 20,894 -8.6 +0.1<br />

Wholesale and retail trade;<br />

repair of motor vehicles,<br />

motorcycles and personal and<br />

household goods<br />

Transport, storage and<br />

communication<br />

70,933 61,855 -12.8 -15.2<br />

33,768 33,978 +0.6 +11.5<br />

Hotels and restaurants 29,281 28,582 -2.4 -7.5<br />

Financial and insurance,<br />

scientific and technical<br />

Real estate, renting and<br />

business activities<br />

Public administration and<br />

defence<br />

31,776 55,219 +57.2 +103.5<br />

74,767 66,679 -10.8 -32.4<br />

36,624 29,737 -18.8 -5.5<br />

Education 40,101 33,906 -15.4 -4.5<br />

Health 61,346 71,875 +17.2 +24.7<br />

Other services 26,314 20,535 -21.2 -21.8<br />

Total 476,903 457,567 -4.1 -5.3<br />

Source: 2001 Annual Business Inquiry and 2011 Business Register and Employment Survey (2001<br />

ABI data scaled to be consistent with current BRES estimates)<br />

P34 3366706v3


Proposed Mixed Use Development, Braehead: Socio-Economic Impact Report<br />

Table 6: Number of VAT Registered Businesses<br />

Area 1997 2007 % Change<br />

<strong>Renfrewshire</strong> 3,130 3,670 17.3<br />

Glasgow City 12,190 13,750 12.8<br />

Scotland 122,840 141,895 15.5%<br />

Great Britain 1,619,470 1,964,920 21.3%<br />

Source: BERR vat registrations/de-registrations by industry 1997/2007<br />

Table 7: Sought Occupation of Claimant Unemployed Workers<br />

Sought Occupation<br />

Labour Catchment<br />

Area<br />

(no. / %)<br />

Scotland<br />

(no. / %)<br />

Occupation unknown 295 (1) 1,975 (1.5)<br />

Managers and Senior Officials 520 (1.8) 2,750 (2)<br />

Professional Occupations 570 (2) 2,785 (2.1)<br />

Associate Professional and<br />

Technical Occupations<br />

Administrative and Secretarial<br />

Occupations<br />

1,325 (4.6) 5.905 (4.4)<br />

2,340 (8.1) 10,250 (7.6)<br />

Skilled Trades Occupations 2,615 (9.1) 14,615 (10.8)<br />

Personal Service Occupations 1,740 (6) 8,725 (6.4)<br />

Sales and Customer Service<br />

occupations<br />

Process, Plant and Machine<br />

Operatives<br />

8,055 (28) 36,735 (27.1)<br />

2,275 (7.9) 11,695 (8.6)<br />

Elementary Occupations 9,080 (31.5) 40,005 (29.5)<br />

Total 28,810 135,440<br />

Source: NOMIS ONS September 2012<br />

3366706v3 P35


Proposed Mixed Use Development, Braehead: Socio-Economic Impact Report<br />

Table 8: Unemployment Rates and Long Term Unemployment<br />

Area<br />

No. Claimant<br />

Unemployed *<br />

Claimant<br />

Unemployment<br />

Rate (%) *<br />

Long Term<br />

Claimant<br />

Rate (%) #<br />

Unemployment<br />

Rate (%) †<br />

<strong>Renfrewshire</strong> 5,175 4.6 1.4 9.3<br />

Glasgow City 23,635 5.7 1.7 10.8<br />

Scotland ~ 3.9 1.1 7.9<br />

Source: * NOMIS ONS Claimant Count September 2012<br />

Source: # NOMIS ONS September 2012 over 12 months unemployed, (% is number of persons<br />

claiming JSA as a proportion of resident population of the same age).<br />

Source: † NOMIS ONS Employment and Unemployment (Jul 2011 – Jun 2012)<br />

Table 9: Job Vacancies and Unemployment Indicators<br />

Area<br />

Live Unfilled<br />

Vacancies<br />

No. of<br />

Claimant<br />

Unemployed<br />

Unemployed/<br />

Vacancy<br />

Ratio<br />

<strong>Renfrewshire</strong> 726 5,175 7.1<br />

Glasgow City 2,948 23,635 8.0<br />

Scotland 26,862 ~ 5.1<br />

Great Britain 385,746 ~ 3.9<br />

Source: NOMIS ONS September 2012<br />

Table 10: Average Gross Weekly Earnings of Full Time Employees by Workplace<br />

Area<br />

Average Weekly<br />

Earnings<br />

As a % of GB<br />

Average<br />

<strong>Renfrewshire</strong> 505.9 100.6<br />

Glasgow City 460.4 91.5<br />

Source: ONS Annual Survey of Hours and Earnings - workplace analysis 2011<br />

P36 3366706v3


Proposed Mixed Use Development, Braehead: Socio-Economic Impact Report<br />

Table 11: Occupational Breakdown of Labour Force<br />

Occupational Group<br />

Labour<br />

Catchment<br />

Area<br />

(no. / %)<br />

Scotland<br />

(%)<br />

Great<br />

Britain<br />

(%)<br />

Managers/senior officials 25,700 (7.6) 8.3 10.1<br />

Professional occupations 72,300 (21.4) 19.0 19.1<br />

Associate professional &<br />

technical<br />

Administrative & secretarial<br />

occupations<br />

43,700 (12.9) 12.9 14.0<br />

35,900 (10.6) 10.9 11.0<br />

Skilled trades 29,800 (8.8) 11.4 10.8<br />

Personal service occupations 35,100 (10.4) 9.8 9.1<br />

Sales and customer service<br />

occupations<br />

Process plant & machine<br />

operatives<br />

32,100 (9.5) 9.2 8.1<br />

19,500 (5.8) 6.6 6.4<br />

Elementary occupations 44,300 (13.1) 11.5 10.9<br />

Source: Annual Population Survey, NOMIS ONS January 2010/December 2010<br />

Table 12: Qualifications of Residents<br />

Area<br />

% of Residents with<br />

no Qualifications *<br />

% of Residents with<br />

NVQ4 or Higher<br />

Qualification *<br />

<strong>Renfrewshire</strong> 15,000 (13.6) 41,400 (37.5)<br />

Glasgow City 68,100 (16.6) 163,900 (40.1)<br />

Scotland (11.6) (37.2)<br />

Great Britain (10.6) (32.9)<br />

Source: Annual Population Survey January 2011 / December 2011, * proportion of working age<br />

population<br />

3366706v3 P37


(Computer generated images are for illustrative purposes only)