<strong>Paisley</strong> <strong>Gilmour</strong> <strong>Street</strong> <strong>Railway</strong> <strong>Station</strong> <strong>Canopy</strong> <strong>Renewal</strong><br />

Contents<br />

<strong>Canopy</strong> <strong>Renewal</strong><br />

GILMOUR STREET STATION, PAISLEY.<br />

1. <strong>Station</strong> description<br />

2. Brief history<br />

3. <strong>Canopy</strong><br />

4. Proposal<br />

5. Detail of proposal design and materials<br />

5.1. Glazing<br />

5.2. Foundations and substructure<br />

5.3. Superstructure<br />

5.4. Painting scheme<br />

5.5. Roof access<br />

5.6. Roof access system<br />

5.7. Drainage<br />

Acknowledgements:<br />

This report was prepared with the assistance of documentation provided by<br />

WYG and gm+ad architects.<br />

Laura Mitchell for NETWORK RAIL Page 1 of 6


<strong>Paisley</strong> <strong>Gilmour</strong> <strong>Street</strong> <strong>Railway</strong> <strong>Station</strong> <strong>Canopy</strong> <strong>Renewal</strong><br />

<strong>Paisley</strong> <strong>Gilmour</strong> <strong>Street</strong> – <strong>Canopy</strong> <strong>Renewal</strong> Proposal.<br />

1. <strong>Station</strong> Description.<br />

<strong>Paisley</strong> <strong>Gilmour</strong> <strong>Street</strong> is a busy railway station carrying approximately 12,000<br />

passengers daily.The <strong>Station</strong> is also an important transport interchange for<br />

other local destinations including Glasgow Airport, <strong>Paisley</strong> town centre,<br />

Braehead Shopping Centre, St Mirren Football Club and Hillington Industrial<br />

Estate.<br />

<strong>Paisley</strong> <strong>Gilmour</strong> <strong>Street</strong> is a Grade B Listed <strong>Railway</strong> <strong>Station</strong>. The <strong>Station</strong><br />

building comprises three levels of which the topmost (2nd floor) is platform/<br />

station level. The lower floors are generally tenanted units in use as shops<br />

with access to the <strong>Station</strong> available at ground/ street level from Old Sneddon<br />

<strong>Street</strong> and County Square. Platform 1 is located adjacent to the north<br />

boundary. Platform 4 is located adjacent to the south boundary. Platform’s 2<br />

and 3 are set on a centrally located island. <strong>Gilmour</strong> <strong>Street</strong> Bridge is located<br />

towards the east end of the station.<br />

The existing roof canopy structure consists of a series of main and<br />

intermediate metallic lattice girders supported on cast iron support columns.<br />

There is a profiled valance with polycarbonate roofing. The three canopies at<br />

the <strong>Station</strong> are in a state of disrepair and will be the focus of this Listed<br />

Building Consent application.<br />

2. Brief History.<br />

The Application Documentation provides a thorough insight into the historic<br />

development of the <strong>Station</strong>. This report refers to the history in so far as it<br />

relates to the development of the <strong>Station</strong> canopies.<br />

The <strong>Station</strong> was opened on 14 July 1840 on the Glasgow, <strong>Paisley</strong>,<br />

Kilmarnock and Ayr <strong>Railway</strong>. At this time <strong>Paisley</strong> <strong>Gilmour</strong> <strong>Street</strong> <strong>Station</strong><br />

possessed only two through platforms and no roof canopy, with the tracks<br />

diverging at the west end of the station as currently to direct services towards<br />

Ayr and Gourock.<br />

The <strong>Station</strong> was expanded in 1883 as part of the improvements to the<br />

Glasgow and <strong>Paisley</strong> Joint line to include four platforms and it is believed that<br />

the first roof canopies were erected at the station around that time. The early<br />

canopy roof was a hipped-end multi-ridged roof with transverse gutters<br />

located on the main lattice girders, ridges running from North to South across<br />

the platforms. The track was not covered.<br />

The station was electrified as part of the 1967 Inverclyde Line improvements.<br />

It is believed that around this time the roof cladding was also changed to the<br />

existing arrangement of steel and translucent sheeting panels supported on<br />

steel purlins.<br />

Laura Mitchell for NETWORK RAIL Page 2 of 6


<strong>Paisley</strong> <strong>Gilmour</strong> <strong>Street</strong> <strong>Railway</strong> <strong>Station</strong> <strong>Canopy</strong> <strong>Renewal</strong><br />

3. <strong>Canopy</strong>.<br />

There are three canopies covering the platform area. The existing roof canopy<br />

framework structure is approximately 150m long and 38m wide and consists<br />

of a series of 17 main and intermediate metallic lattice girders. The main<br />

transverse lattice girders are supported centrally on cast iron columns<br />

founded within the platforms and upon masonry corbels within the north and<br />

south station boundary walls. The canopies on platform 1 and 4 consists of a<br />

mono-pitch structure. The canopy covering the island platform 2 and 3 is a<br />

inverse low pitched roof. The materials are translucent fibre composite panels<br />

forming the top with grey panel valances. The canopies are shaped slightly to<br />

follow the bowing shape of the platforms.<br />

4. Proposal.<br />

The existing roof structure is dilapidated and requires replacement. Our<br />

proposals will entirely remove the existing roof canopies from the <strong>Station</strong>. A<br />

new single roof canopy will be created covering from boundary to boundary<br />

across the majority of platforms 1 to 4. Running to approximately 150 metres<br />

long the design will reflect the original with glazing, hipped-end, multi-ridged<br />

roof with transverse gutters located on the main lattice girders, ridges running<br />

from North to South across the platforms however the current proposal runs<br />

across the tracks to create a single roof structure for the <strong>Station</strong>. The existing<br />

lattice metalwork superstructure and cast iron support columns are retained in<br />

the design.<br />

The existing roof canopy structure is proposed to be renewed. This includes<br />

the following works:<br />

Replacing the entire roof cladding and secondary steelwork with a<br />

transverse single glazed multi-pitched roof spanning between the main<br />

lattice girders, encompassing both the platforms and track areas.<br />

The new roof will be approximately 40% greater in plan area than the<br />

existing as areas occupied by the tracks shall be covered and therefore<br />

the existing lattice roof structure will be strengthened to cater for the<br />

additional loads.<br />

New drainage will be installed which will direct flows to the existing<br />

outfalls at both the north and south sides of the station.<br />

A new roof access system will be provided to the roof. Access to the<br />

new system will be from staircases/ladders on platform 1.<br />

Laura Mitchell for NETWORK RAIL Page 3 of 6


<strong>Paisley</strong> <strong>Gilmour</strong> <strong>Street</strong> <strong>Railway</strong> <strong>Station</strong> <strong>Canopy</strong> <strong>Renewal</strong><br />

5. Details of proposal design and materials.<br />

5.1. Glazing.<br />

The roof glazing system consists of 6.4mm laminated planar glass supported<br />

and restrained by PL6 glazing bars and supported by steel purlins which span<br />

between new steel pitched roof beams.<br />

5.2. Foundations and substructure.<br />

It is anticipated that existing column foundations which are supported on fill<br />

between the retaining walls of the original station will require strengthening.<br />

The form of strengthening is envisaged to be enlargement of the existing pad<br />

foundations using dowels and reinforced concrete to reduce bearing<br />

pressures on the substructures.<br />

5.3. Superstructure.<br />

The existing lattice girders will be strengthened using the following<br />

techniques:<br />

Additional flange plates will be bolted to the soffit of the main lattice girders<br />

in order to enhance the bending capacity of the girders.<br />

The main lattice girder web members will be strengthened by the addition<br />

of angles or channels to the end members in order to carry the shear<br />

forces from the end of the beam down to the supports.<br />

The main strengthening works involve the addition of a rolled steel beam<br />

section above the main lattice girders in order to significantly increase the<br />

section depth. The beam will be bolted at approximately 150mm centres to<br />

the top flange of the girder in order to provide a longitudinal shear<br />

connection. The soffit of the proposed rolled steel section will be notched<br />

over the locations where the OHLE supports are positioned above the top<br />

flange of the lattice girders.<br />

The rolled steel beams will act as valley girders and will accept the main<br />

pitched roof beam sections. The roof beams will be tied in order to limit<br />

lateral loading effects on the existing lattices during construction.<br />

The existing columns have been found to be inadequate to resist wind<br />

loading effects and therefore horizontal plan bracing will be introduced in<br />

the end bays in order to carry the loads back to the main masonry<br />

supporting walls. These loads will be distributed along the length of the<br />

wall by longitudinal beams positioned just in front of the masonry walls.<br />

Additional longitudinal beams will be included along platform 2/3 above the<br />

existing bow tie members in order the distribute loads down the length of<br />

the station.<br />

The roof is joined to the wall of the building with lead capping to the<br />

cornice and blocking course to parapet. This is detailed in drawing<br />

A057311-31-A-301.<br />

Laura Mitchell for NETWORK RAIL Page 4 of 6


<strong>Paisley</strong> <strong>Gilmour</strong> <strong>Street</strong> <strong>Railway</strong> <strong>Station</strong> <strong>Canopy</strong> <strong>Renewal</strong><br />

5.4. Painting scheme.<br />

The existing cast iron columns will be predominantly blast cleaned (except for<br />

capitals) and repainted with an M24 paint system tested in accordance with<br />

NR/L3/CIV/040 Issue 1 to give a design life of 25 years. Refer to drawing<br />

A057311-31-R-122 contained within Appendix B.<br />

It is traditional for the <strong>Station</strong> to be painted in the livery colours of the<br />

operating company; this has seen paisley <strong>Gilmour</strong> <strong>Street</strong> change colours from<br />

several times in the past. Given the extent of the works at <strong>Paisley</strong> <strong>Gilmour</strong><br />

<strong>Street</strong> it is considered this is an appropriate time to re-brand the <strong>Station</strong> with<br />

the Saltire livery. This means a change from carmine and cream to blue, grey<br />

and white. We have provided details on the proposed appearance in the<br />

application pack. External steelwork will be matt finish which will prevent a<br />

reflective appearance.<br />

5.5. Roof access points.<br />

Two new roof accesses will be created by the project. Refer to drawing<br />

A057311-31-A-304 and 305 for details.<br />

The first will be a simple steel staircase provided on Platform 1 in the area<br />

between the existing platform buildings. The metal stair will be constructed<br />

within a new enclosure formed at platform level, replicating the façade of<br />

the existing masonry and decorative Victorian timber screen frontage of<br />

the platform buildings on either side of the gap. A mesh screen extending<br />

to roof level will be provided above the fascia line of the enclosure. This<br />

will ensure security and to limit the impact of any falling objects by those<br />

using the stair.<br />

Emergency escape companionway ladders will be provided within the<br />

existing ‘kiosk’ building at the east end of Platform 1. A matching mesh<br />

screen extending the access point at roof level will be provided above the<br />

fascia line.<br />

5.6. Roof Access system.<br />

A bespoke roof access system designed in association with The Clow Group<br />

Ltd. is proposed in all areas of the roof. This has been used elsewhere<br />

including the Glasgow Central <strong>Station</strong> Roof and has successfully been<br />

accepted for use at Edinburgh Waverley. The proposed system consists of<br />

mobile safety cages which run along tracks on both the north and south sides<br />

of the roof and down each of the valleys. In addition, the hip ended multiridged<br />

roofs are accessed by a travelling inverted ‘V’ gantry sliding on the<br />

integral walkway tracks. Gutter walkways are 600mm wide aluminium open<br />

tread format, hinged to facilitate cleaning of the gutters and gutter outlets<br />

below. The walkways are supported on galvanised metal ‘T’ section straps<br />

mechanically fixed to the bottom glazing purlin. Mobile safety cages are<br />

provided with ‘pockets’ and straps for transporting replacement glass panels.<br />

The length of the safety cage permits two operatives to move safely along the<br />

Laura Mitchell for NETWORK RAIL Page 5 of 6


<strong>Paisley</strong> <strong>Gilmour</strong> <strong>Street</strong> <strong>Railway</strong> <strong>Station</strong> <strong>Canopy</strong> <strong>Renewal</strong><br />

gutters simultaneously. The system is constructed from mill finish aluminium<br />

this will have a dull grey appearance.<br />

5.7. Drainage.<br />

The new roof will be drained via a series of valley gutters to carrier pipes<br />

running along the northern and southern facades below the lattice girders.<br />

Additional gutters will be provided to drain the hipped ends of the roof along<br />

the facades. The system will be a conventional gravity system.<br />

New outfall pipes will be installed at each end of the northern façade on Old<br />

Sneddon <strong>Street</strong> which will direct flows to existing combined sewer pipes<br />

located within the roadway. A replacement outfall within the station car park<br />

located to the southwest corner of the station is proposed.<br />

Laura Mitchell for NETWORK RAIL Page 6 of 6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!