road construction department jharkhand bill of quantity - Information ...
road construction department jharkhand bill of quantity - Information ...
road construction department jharkhand bill of quantity - Information ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
ROAD CONSTRUCTION DEPARTMENT<br />
JHARKHAND<br />
BILL OF QUANTITY<br />
NAME OF WORK : M/R OF PATRATU- SAUNDA”D” ROAD IN<br />
KM 7(500 M), 8, 9, 10, 11, 12(305M) FOR<br />
THE YEAR 2010-11<br />
ESTIMATED AMOUNT : RS. 21,15,417.00<br />
DIVISION : ROAD DIVISION, RAMGARH<br />
CIRCLE : ROAD CIRCLE, HAZARIBAG<br />
STATE : JHARKHAND
OFFICE OF THE EXECUTIVE ENGINEER<br />
ROAD CONSTRUCTION DEPARTMENT<br />
ROAD DIVISION, RAMGARH<br />
NOTICE INVITING TENDER<br />
1. Sealed tenders on approved <strong>bill</strong> <strong>of</strong> <strong>quantity</strong> to be eventually drawn in PWD From-F2 will be<br />
received upto 3.00 PM on 12.10.11 in the Office <strong>of</strong> the Chief Engineer(C),R.C.D, Jharkhand,<br />
Ranchi or Superintending Engineer, Road Construction Department, Road Circle, Hazaribag<br />
or Executive Engineer, Road Construction Department, Road Division, Ramgarh, for the<br />
work <strong>of</strong> M/R OF PATRATU-SAUNDA ‘D’ ROAD IN KM 7(500 Mtr), 8, 9, 10, 11 & 12(305<br />
Mtr) KM FOR YEAR 2011-12 will be opened by the <strong>of</strong>ficer receiving the tender in presence<br />
<strong>of</strong> the tenders or their authorised agent on the same day at 3.30 PM.<br />
2. (a) B.O.Q. may be received after payment <strong>of</strong> Rs. 5,000.00 as cost (Non-refundable) <strong>of</strong> B.O.Q. on<br />
11.10.11 during <strong>of</strong>fice hours upto 3.00 PM from <strong>of</strong>fice <strong>of</strong> the Chief Engineer(C),R.C.D,<br />
Jharkhand, Ranchi or Superintending Engineer, Road Construction Department, Road Circle,<br />
Hazaribag or Executive Engineer, Road Construction Department, Road Division, Ramgarh.<br />
No B.O.Q. will be sold on the date <strong>of</strong> receiving the tender. The Bill <strong>of</strong> Quantity will be made<br />
available to the tenders on producing the certified copy <strong>of</strong> the registration and other relevant<br />
papers.<br />
(b) Other details can be seen in the <strong>of</strong>fice <strong>of</strong> the undersigned on any working day.<br />
3. Tendereres are required to deposit Earnest Money amounting to-<br />
Rs. 42,500.00 on the estimated cost <strong>of</strong> Rs. 21,15,417.00<br />
4. Earnest money can be deposited in shape <strong>of</strong> 6 years N.S.C., 8 th issue, Bank Guaranty, Post<br />
<strong>of</strong>fices time deposit pass book <strong>of</strong> 3/5 years from Jharkhand state duly pledged to the<br />
Executive Engineer, R.C.D., Road Division, Ramgarh in the specific work. Tenderers must<br />
enclosed Earnest Money in the said form with their bidding document, otherwise their<br />
tenders may be out rightly rejected, N.S.C. or other deposit furnished after the receipt <strong>of</strong><br />
tender on specific date time will in no case be entertained.<br />
5. The work shall to be completed within Three Months from the date <strong>of</strong> issue <strong>of</strong> the work<br />
order.<br />
6. No relaxation in depositing initial security money will be given.<br />
7. Tenderers should quote their rates (In figures and Words) on percentage basis on the amount<br />
mentioned on the B.O.Q. cutting and overwriting must be signed by the tenderers. The rate<br />
quoted less than 15% that <strong>of</strong> the amount <strong>of</strong> B.O.Q. calculated on the basis <strong>of</strong> current schedule<br />
<strong>of</strong> rates in absence <strong>of</strong> the same Analysis rate wherever applicable will not be entertained and<br />
tender will be rejected.<br />
8. The rate quoted by the tenderers should be inclusive <strong>of</strong> all taxes, royalty and other incidental<br />
charges.<br />
9. The contractors must furnish with their bidding document:-<br />
(a) The plants and machineries they posses for execution <strong>of</strong> work.<br />
(b) Experience they have with details <strong>of</strong> works and its locations.<br />
(c) Certificate if any about the capacity <strong>of</strong> Executive work.<br />
(d) Technical staff they have.<br />
Executive Engineer,<br />
R.C.D, Road Division<br />
Ramgarh
fufonk ds “krsZ %&<br />
1- ifjek.k foi= dz; gsrq vkosnu i= ds lkFk i- fu- fo-] >kj[k.M jkT; ds leqfpr<br />
Js.kh esa iFk fuekZ.k foHkkx >kj[k.M jkT; esa fucaf/kr @uohd`r<br />
fucaa/ku v?;ru vk;dj okf.kT;dj lQkbZ izek.k i= ,oa LoPN pfj= izek.k i=<br />
dh vfHkizekf.kr Nk;k izfrLi"V layXu djuk vfuok;Z gSA<br />
2- fufonk vfHkys[k Ø- 5 ij vafdr dk;kZy; ls dk;kZy; v<strong>of</strong>/k esa mi;qZDr cSad<br />
MªkV lefiZr dj izkIr fd;s tk ldrs gSa vFkok >kj[k.M ljdkj ds website (i)<br />
www.<strong>jharkhand</strong>.gov.in (ii) www.<strong>jharkhand</strong>. nic.in ls MkmuyksM fd;s tk ldrs<br />
gSaA fufonk vfHkys[k] csclkbV ls izkIr djus dh fLFkfr esa fufonk ds<br />
lkFk fufonk vfHkys[k dk ewY; fufonk vfHkys[k Øe 7 dk dkWye ¼vii½<br />
ds vuqlkj tek djuk vfuok;Z gksxk vU;Fkk fufonk dks (Invalid) vekU; ekuk<br />
tk,xkA lkFk gh ;fn MkmuyksM fd;s x;s fufonk izi= esa dksbZ<br />
tksM@cnyko fd;k x;k rks oSls fufonk dks Hkh vekU; (Invalid) ekuk<br />
tk,xkA<br />
3- bl fufonk ds lEca/k esa foLr`r tkudkjh ds fy, v/kksgLrkk{kjh ds dk;kZy;<br />
esa dk;Z v<strong>of</strong>/k esa lEidZ djsa ,oa lwpuk iV ij ns[ksa A<br />
4- fufonk dh vU; 'krsZ fufonk i= ds lkFk layXu jgsxk tks fufonknkrkvksa<br />
dks ekU; gksxkA<br />
5- vkosnu i= ds lkFk ifjek.k foi= dk ewY; cSad MªkQV ;k cSadlZ psd ds :i<br />
esa ekU; gksxk tks dk;Zikyd vfHk;ark iFk fuekZ.k foHkkx iFk ize.My<br />
jkex
Loa; laosnd dk QksVks ,oa gLrk{kj uohd`r fuca/ku dkxtkr esa gksxk A<br />
fdlh vU; O;fDr dks fufonk dkxtkr fdlh Hkh 'krZs ij fuxZr ugha fd;k tk;sxk<br />
A<br />
8- foHkkx }kjk dksbZ Hkh fuek.kZ lkexzh ,oa midj.k tSls<br />
lhesUVNMHkkbcszVj e'khu] vydrjk (60/70)/(V.G.30)] iFk csyu vkfn ugha<br />
fn;k tk;sxk A<br />
9- fufonknkrkvksa ds iFk csyu vkfn dk LokfeRo izek.k&i= izLrqr djus ds<br />
i'pkr gh ifjek.k foi= fuxZr fd;k tk;sxkA<br />
10- fufonk [kksyus ds le; laosnd Lo;a ;k muds }kjk izkf/kd`r izfrfuf/k mifLFkr<br />
jg ldrs gSA<br />
11- dk;Z Hkwry ifjogu ea=ky; Hkkjr ljdkj ,oa Hkkjrh; jksM dkWxzsl }kjk<br />
fu/kkfjZr f<strong>of</strong>'kf"V;ksa ,oa ekudks ds vuq:i gksxk A<br />
12- dk;Z gsrq bPNwd laosnd fufonk Mkyus ds iwoZ vius [kpZ ij dk;Z LFky<br />
,oa LFkkuh; fLFkfr rFkk ifjfLFkfr;ksa ls vo’; gh Loa; voxr gks ysxs A<br />
ckn esa mlls lacaf/kr dksbZ Hkh nkok ekU; ugha gksxk A<br />
13- fcVqfeu ewY; gsrq Hkkjr ljdkj ds vkW;y dEifu;kas }kjk izHk`r nj<br />
vuqekU; gksxhA<br />
14- ,djkjukek ds le; fcVqfeul dk;Z dk ekfld odZ izksxzke laosnd }kjk lefiZr<br />
fd;k tkuk gksxkA ftl ekg esa fcVqfeul dk;Z fu/kkZfjr gS] ml DokVZj esa<br />
fcVqfeu ds Ø; ds lanHkZ esa ewY;o`f) rHkh vuqekU; gksxk tc okLro<br />
eas ml v<strong>of</strong>/k esa fcVqfeu dk Ø; dj mldk iz;ksx fd;k x;k gksA bl izdkj<br />
vUrj jkf'k dh izfriwfrZ okLrfod Ø; ds fo:) fuxZr ewy *,uok;l* (Invoice) ds<br />
vk/kkj ij ns; gksxkA<br />
15- izfriwfrZ dh jkf'k ds Hkqxrku gsrq lacaf/kr dk;Zikyd vfHk;ark lHkh<br />
vfHkys[kksa ds lkFk izLrko dks mfpr ek/;e ls l{ke inkf/kdkjh dks lefiZr<br />
djsaxs ,oa bldh LohÑfr ,oa vkoaVu izkIr gksus ds i'pkr~ gh Hkqxrku<br />
djsaxsA<br />
16- fdlh Hkh ifjfLFkfr esa izfriwfrZ dh jkf'k dk Hkqxrku ,djkjukek ds vuqlkj<br />
le; lhek ds ckn ds dk;ksZ ds fy, vuqekU; ugha gksxkA ekfld odZ<br />
izksxzke ds vuqlkj dk;Z ugha fd;s tkus ij mrus ek=k ds dk;ksZa ds fy,<br />
izfriwfrZ dh jkf'k dk Hkqxrku vuqekU; ugha gksxkA
17- ;fn fcVqfeu dh dher esa gªkl gksrk gS rc rnuq:i ,djkjukek dh jkf'k ls<br />
dVkSrh dh tk;sxhA<br />
18- l'krZ fufonk fdlh Hkh gkyr esa ekU; ugha gksxk A<br />
19- izkDdyu dh jkf'k ?kVus ;k c
SPECIAL CONDITIONS<br />
1. The contractor should satisfy themselves fully with the nature and site <strong>of</strong> work before<br />
<strong>of</strong>fering their tenders. Any ignorance afterwards will not be considered.<br />
2. Tenders without earnest money or insufficient earnest money will be out rightly rejected and<br />
there will be no in position on the body <strong>of</strong> the contractor statement.<br />
3. Contractors are required to furnish up to date tax clearance certificates in respect <strong>of</strong> I.T. &<br />
S.T. copy <strong>of</strong> registration <strong>of</strong> contract failing which their may be rejected.<br />
4. Conditionals tenders may be our rightly rejected.<br />
(a) If the tenderers is company or firm, copy <strong>of</strong> partnership deed <strong>of</strong> attorney must be enclosed<br />
with the tenders.<br />
5. After approval <strong>of</strong> rate by the competent authority, contractor shall have to deposit the initial<br />
security money in shape <strong>of</strong> N.S.C. (Post <strong>of</strong>fice time deposit pass book) duly pledged to the<br />
Executive Engineer, R.C.D, Road Division, Ramgarh within 7 days from the date <strong>of</strong> receipt<br />
<strong>of</strong> the written order from the Engineer-In-charge failing which earnest money will be<br />
forfeited.<br />
6. Authority reserves right to reject any or all <strong>of</strong> the tenders or to distribute the work among<br />
more contractors without assigning any reason.<br />
7. No claim for idle labour due to stoppage <strong>of</strong> work or non-supply <strong>of</strong> materials drawings and<br />
designs or any delay due to condition beyond the control <strong>of</strong> <strong>department</strong> shall be entertained.<br />
8. The contractor shall have to arrange necessary site for accommodation and the facilities ie.<br />
medical etc for their labours or other staff cost and initiatives as well and will abide by the<br />
labour rules enforces under labour act as amended from time to time.<br />
9. The contractor shall be soley responsible for any damage to loss to the public properly due to<br />
negligence <strong>of</strong> their labours or other staffs and the damage shall be made good at their own<br />
cost.<br />
10. The specification <strong>of</strong> Road Circle, Hazaribag and I.R.C. specification shall be followed during<br />
the execution <strong>of</strong> the work. In case <strong>of</strong> any difference <strong>of</strong> opinion between the <strong>department</strong> and<br />
the contractor concerning works the direction and the orders <strong>of</strong> the Superintending Engineer,<br />
R.C.D., Road Circle, Hazaribag will be final and conclusive.<br />
11. No claim shall be entertained due to fluctuation in rates <strong>of</strong> labour and materials at any time<br />
during the period <strong>of</strong> the work.<br />
12. Materials recoverable on non recoverable (direct issued to work) shall be issued to the<br />
contractor on proper hand receipt. Recovering <strong>of</strong> cost <strong>of</strong> materials will be made for the gross<br />
<strong>quantity</strong> issued and not for the <strong>quantity</strong> consumed in proportion to the work <strong>bill</strong>ed for the<br />
materials issued in excess <strong>of</strong> requirement beyond the circle analysis the recovery <strong>of</strong> the cost<br />
<strong>of</strong> excess materials will be double the issue rates as stipulates in the agreement.<br />
13. The contractor deploying trucks for carriage <strong>of</strong> materials and other work shall be to abide by<br />
the latest rules <strong>of</strong> Motor Vehicle Act, Bihar.<br />
14. It will be obligatory on the part or the tenderers to keep his tender open for a period <strong>of</strong> 6<br />
months (180 days) from the date <strong>of</strong> opening <strong>of</strong> tender for acceptance.
15. The contractor shall not be entitled to any claim or compensation for any loss sustained by<br />
him due to.<br />
(a) Natural Calamities.<br />
(b) Difficulties in procurement transportation and<br />
(c) Circumstances beyond the control <strong>of</strong> the state government.<br />
16. "Site order book" with numbered pages and bearing the certificate <strong>of</strong> the E/I containing so<br />
much pages shall have to be maintained by the contractor at site <strong>of</strong> work and it will have to<br />
be produced to the E/I or inspecting authorities as desired for any instruction concerning the<br />
work. This shall be the properly <strong>of</strong> the Department after completion <strong>of</strong> the work.<br />
17. No work beyond agreement shall be executed by the contractor unless specifically ordered by<br />
the E/I in writing. Claim for extra work beyond agreement shall have to be submitted<br />
regularly otherwise it will as time barred and may be disallowed.<br />
18. The following materials will be supplied by the <strong>department</strong> on rate noted against each item. If<br />
available in stock Ex. R.C.D. Godown or store.<br />
(a) Bitumen (60/70) Supplied by Agency packed Rs. ………………… Per MT.<br />
Bulk Rs. …………………………..<br />
(b) Cement Supplied by Agency Rs. ………………… Per MT.<br />
(c) M.S. Rod (plain) Supplied by Agency<br />
(i) 6 mm dia @ Rs. ……………….. Per MT.<br />
(ii) 8 mm to 12 mm dia @ Rs……………….... Per MT.<br />
(d) Tor Rod Supplied by Agency<br />
(i) 8 mm dia @ Rs……………….... Per MT.<br />
(ii) 10 mm to 12 mm dia @ Rs……………….... Per MT.<br />
(iii) 16 mm to 36 mm dia @ Rs……………….... Per MT.<br />
(iv) 40 mm and above @ Rs……………….... Per MT.<br />
(e) On non return <strong>of</strong> empty bitumen drums and empty cement bags in R.C.D. godown <strong>of</strong> Road<br />
Division, Ramgarh on Rs.160.00 per drum and Rs. 3.00 per empty cement bag will be<br />
recovered respectively.<br />
19. On account <strong>of</strong> Income Tax 2.266% will be deducted from the Bill <strong>of</strong> the contractor, 2% Sale<br />
Tax also be deducted form the <strong>bill</strong> <strong>of</strong> the Contractor, 1% will be deducted on the <strong>bill</strong> value as<br />
the building and other <strong>construction</strong> works welfare cess vide Letter No.- 3707(S), Ranchi<br />
dated 20.07.09 <strong>of</strong> Engineer-in-Chief, Road Construction Department, Jharkhand, Ranchi.<br />
20. On- non production <strong>of</strong> royalty clearance certificate necessary recovery on account <strong>of</strong> royalty<br />
chargers will be made from the <strong>bill</strong> <strong>of</strong> contractor at the rate presented by Mining Department.<br />
21. Notice Inviting Tender and special condition will be a part <strong>of</strong> the agreement.<br />
22. The progress <strong>of</strong> the work should strictly be maintained proportionately with respect to time <strong>of</strong><br />
completion.<br />
Executive Engineer,<br />
R.C.D., Road Division,<br />
Ramgarh
SPECIAL CONDITIONS FOR SUPPLY OF MATERIALS<br />
1. Tenderes shall have to furnish samples <strong>of</strong> materials such as metal, stone chips and moorum<br />
etc. in sealed packets weighting not less than one Kg. with name <strong>of</strong> parties from which<br />
supplies will have to be made for approval & the supply for materials strictly confirming to<br />
the approval samples, will only be taken.<br />
2. Supply <strong>of</strong> Bricks shall be taken at site work and will be stacked in countable stacks as per<br />
direction <strong>of</strong> E/I which shall be approved by the competent authority.<br />
3. Supply <strong>of</strong> materials will always be taken in standard stack mentioned in the agreement or as<br />
directed by the E/I.<br />
4. The <strong>quantity</strong> <strong>of</strong> supply may increase or decrease as per requirement and direction <strong>of</strong> E/I.<br />
5. If the stacks <strong>of</strong> materials supplied do not confirm to the quality as per approved samples and<br />
size as per I.R.C. and circle specification they will be out rightly rejected and the contractor<br />
at his own cost will have remove these materials from the site failing which the materials<br />
would be thrown away by Departmental labour and the cost incurred shall be recovered from<br />
him.<br />
6. No credit will be issued by the <strong>department</strong> in any case.<br />
7. Supply shall be proportionate to the time <strong>of</strong> completion mentioned in the agreement.<br />
8. The supply should be uniform in the entire length or as directed by the E/I.<br />
9. Collection <strong>of</strong> materials will not allowed on the flanks unless written permission <strong>of</strong> E/I. in<br />
special circumstances.<br />
10. No stacks to materials should be consumed in the work they are measured on measurement<br />
book and duly checking <strong>of</strong>ficers.<br />
11. The contractor shall have to <strong>of</strong>fer all the facilities to the <strong>department</strong>al <strong>of</strong>ficers at the time <strong>of</strong><br />
supervision, measurement and checking to the <strong>bill</strong>s and shall have to restack if desired by<br />
them.<br />
ADDITIONAL SPECIAL CONDITIONS<br />
1. Contractor will be held responsible for supply <strong>of</strong> defective materials and their use in work. In<br />
the case <strong>of</strong> contractors (doing work more than Rs. Ten Lakh) who have to employ their<br />
Junior Engineer/Assistant Engineer. If they will be doing defective work the concerned<br />
Junior Engineer/Assistant Engineer will be held responsible.<br />
2. Contractors having their own Hot mix Plant, Road Roller, Tar Boiler, Paver Tipper, Sprayer<br />
etc. will be given priority.<br />
3. laosnd dks iSDM fcVqesu 60@70 xzsM ;k V.G. 30 dh [kjhnkjh Hkkjr ljdkj<br />
ds fdlh miØe ls Lo;a djuh gksxh rFkk fcVqesu dh xq.koÙkk dk izek.k i=<br />
,oa [kjhn dk izek.k i=@jlhn nsuk vfuok;Z gksxkA [kkyh fcVqesu Mªe<br />
ize.Myk/khu xksnke eas tek djus ds ckn gh muds }kjk dk;Z eas yxk, x,<br />
fcVqesu dk Hkqxrku fd;k tk;sxkA [kkyh fcVqesu Mªe laosnd dks ykSVkuk<br />
vko';d gSA [kkyh fcVqesu Mªe ugha ykSVkus ij :ñ 160-00 :ñ ek=½ dh nj<br />
ls foi= eas dVkSrh gksxkA<br />
4- laosnd dks f<strong>of</strong>'kf"V ds vuq:i Ordinary Port Land cement IS Gr.- 53 dk gh mi;ksx<br />
fd;k tk,xk ,oa [kkyh flesUV cksjk ize.Myh; xksnke esa ykSVkuk vko';d<br />
gksxkA [kkyh flesUV cksjk ugha ykSVkus ij 3-00 ¼rhu½ :ñ izfr [kkyh<br />
cksjk dh nj ls foi= esa dVkSrh gksxhA<br />
Executive Engineer,<br />
R.C.D., Road Division,<br />
Ramgarh
OFFICE OF THE EXECUTIVE ENGINEER<br />
ROAD CONSTRUCTION DEPARTMENT<br />
ROAD DIVISION, RAMGARH<br />
1. Name <strong>of</strong> the Work : M/R OF PATRATU-SAUNDA ‘D’ ROAD IN<br />
KM 7(500 Mtr), 8, 9, 10, 11 & 12(305 Mtr)<br />
FOR YEAR 2011-12<br />
2. Amount <strong>of</strong> Bill <strong>of</strong> Quantity : Rs. 21,15,417.00<br />
3. Rate <strong>of</strong> be tendered by tenderer :<br />
(a) …………………………………… Percent above the amount <strong>of</strong> B.O.Q.<br />
(b) …………………………………… Percent below the amount <strong>of</strong> B.O.Q.<br />
(c) …………………………………… On B.O.Q rate.<br />
4. Time <strong>of</strong> completion <strong>of</strong> work………………………………………………………................<br />
5. E.M. Deposited vide ………………………………………………………………...<br />
………………………………………………………………...<br />
………………………………………………………………...<br />
………………………………………………………………...<br />
………………………………………………………………...<br />
6. Name and Address <strong>of</strong> the Tenderer ………………………………………………………...<br />
………………………………………………………...<br />
………………………………………………………...<br />
………………………………………………………...<br />
7. Registration:<br />
(a) Present Registration No. ………………………………………………………...<br />
(b) In the category <strong>of</strong> the Tenderer ………………………………………………………<br />
8. Income Tax and Sales Tax, Labour Licences Certificates<br />
Note :- Item Rate Quoted by the Tenderer will be rejected.<br />
9. Issued to Mr./Mrs. ………………………………………………………..........................<br />
Signature <strong>of</strong> the Tenderer<br />
………………………………………………………..........................<br />
Executive Engineer<br />
R.C.D., Road Division<br />
Ramgarh
BILL OF QUANTITY FOR M/R OF PATRATU-SAUNDA ‘D’ ROAD IN<br />
KM 7(500 Mtr), 8, 9, 10, 11 & 12(305 Mtr) FOR YEAR 2011-12<br />
Item<br />
No.<br />
Description Unit Quantity Rate Amount<br />
1. Providing 50mm thick compacted built up<br />
spray grout over old bitumen in grade<br />
camber or super evaluation with stone<br />
aggregates and key aggregates @ 0.66 cum<br />
and 0.13 cum per 10M2 and as per MOST<br />
table 500-7 and bitumen 20 Kg including<br />
tack coat all 10 M2 including cost <strong>of</strong> heating<br />
bitumen to required temp. in proper grade<br />
camber <strong>of</strong> super evaluation and rolling the<br />
same with powder <strong>road</strong> roller and finishing<br />
the surface with temple including the coat <strong>of</strong><br />
barriers, danger signal, choukidar making<br />
and maintaining diversion cost <strong>of</strong> carriage <strong>of</strong><br />
full bitumen drums from Bokaro to work<br />
site and returning empty bitumen drums in<br />
good condition including cost <strong>of</strong> all labours<br />
cost <strong>of</strong> POL and all other lubricants & also<br />
hire charges <strong>of</strong> <strong>road</strong> roller all complete job<br />
as per MORTH specification and direction<br />
<strong>of</strong> E/I and cost <strong>of</strong> all materials, carriage with<br />
all lead.<br />
M 2 508.44 197.61 100472.83<br />
2. Providing 20mm thick open graded<br />
premixed carpet over bituminous surface on<br />
proper grade, camber <strong>of</strong> super elevation<br />
with mini hot mix plants with stone chips <strong>of</strong><br />
13.2 mm and 11.2 mm size in ratio <strong>of</strong> (2:1)<br />
@ 0.27 M3 and bitumen @ 19.6 @ Kg per<br />
including cost <strong>of</strong> required temperature in<br />
plant with cost <strong>of</strong> fuel, cleaning the surface<br />
properly with iron brush and broom rolling<br />
providing light barrier m danger signal<br />
M<br />
chowkidar making and maintaining<br />
diversion, carriage <strong>of</strong> bitumen drums up to<br />
8.0 Km leads from go down to work site and<br />
returning the empty bitumen drums in good<br />
condition to the go down and higher charge<br />
<strong>of</strong> <strong>road</strong> roller, mini hot mix plant, tar boiler,<br />
with M.S. trolley etc all complete as per<br />
specification and direction <strong>of</strong> E/I. including<br />
cost <strong>of</strong> stone aggregate.<br />
2 13359.50 147.00 1963846.50
3. Jungle clearance in borrow area, building<br />
premises, flanks ands slops on the <strong>road</strong>s<br />
canals and embankment by removing the<br />
grass and the jungle bushes from the top<br />
including weeding out shrubs including<br />
roots and leveling etc. complete as per<br />
direction <strong>of</strong> E/I.<br />
4. Earth work in repair <strong>of</strong> <strong>road</strong> embankment<br />
with ordinary soil (vide classification <strong>of</strong> soil<br />
item-A) obtained from borrow pits or any<br />
other sources free from logs, stump. Roots,<br />
rubbish or any ingredients likely to<br />
deteriorate or effect the stability <strong>of</strong> the<br />
embankment, including breaking with all<br />
leads and lifts including breaking the clods<br />
maximum to 60mm cube, placing the earth<br />
in layer not exceeding 225 mm in loose<br />
thickness, rough dressing including cost <strong>of</strong><br />
cutting and removing shrubs and roots,<br />
falling in borrow area all complete job as<br />
per approved design, specification and<br />
direction <strong>of</strong> E/I. (Mode <strong>of</strong> measurement<br />
sectional measurement after required<br />
compaction)<br />
5. Providing dressing natural stone set<br />
pavement with stone bricks <strong>of</strong> hard igneous<br />
rock <strong>of</strong> size 250mm x 125mm x 100mm<br />
over 12mm thick local sand <strong>of</strong> F.M. 1.8 as<br />
cushion including watering stone bricks<br />
palced true to line level, grade, camper or<br />
super elevation keeping gap at least 8mm<br />
space in between the sets as joint, staged<br />
and filled with cement mortar (1:4)<br />
6.<br />
including curing, cost <strong>of</strong> water and its<br />
carriage with cost <strong>of</strong> all labours & materials<br />
all complete job as per MORT specification<br />
and direction <strong>of</strong> E/I.<br />
Providing and fixing at site precast RCC<br />
(1:2:4) ordinary post (missing) with nominal<br />
size graded stone chips and clean sand<br />
including cost <strong>of</strong> earth cutting fixing the<br />
post properly in cement concrete block<br />
(1:4:8) with 40mm nominal size graved<br />
stone metal and clean coarse sand <strong>of</strong><br />
approved quality including cost <strong>of</strong><br />
shuttering curing finishing making platform<br />
including bending, binding and cost <strong>of</strong><br />
reinforcement all complete as per I.R.C.<br />
specification and direction <strong>of</strong> E/I.<br />
M 2<br />
M 3<br />
M 2<br />
Each<br />
5600.00<br />
225.00<br />
135.50<br />
1 Nos.<br />
1.20<br />
48.85<br />
229.37<br />
1080.10<br />
6720.00<br />
10991.25<br />
31079.63<br />
1080.10
7. Paining, numbering and writing posts with 2<br />
coats <strong>of</strong> enamel paint <strong>of</strong> approved shade and<br />
make after cleaning the surface thoroughly<br />
and writing with necessary information at<br />
site all complete as per specification and<br />
direction <strong>of</strong> E/I.<br />
a) 5 th Km posts (Old)<br />
b) Ordinary Km. posts<br />
Each<br />
Each<br />
1 Nos.<br />
4 Nos.<br />
401.36<br />
206.22<br />
401.36<br />
824.88<br />
Total Amount 21,15,416.55<br />
Say 21,15,417.00<br />
Executive Engineer<br />
R.C.D, Road Division,Ramgarh