- Page 1 and 2: SENTRON Power Monitoring Device SEN
- Page 3 and 4: Table of contents 1 Introduction...
- Page 5 and 6: Table of contents 8.3 Special displ
- Page 7 and 8: Table of contents Table A- 4 Modbus
- Page 9 and 10: Table of contents Figure 6-18 Conne
- Page 11 and 12: Introduction 1 1.1 Purpose of this
- Page 13: Contacts in the region Contacts in
- Page 17 and 18: Description 3 3.1 Features SENTRON
- Page 19 and 20: Counters Description 3.1 Features
- Page 21 and 22: See also 3.2 Measuring inputs Curre
- Page 23 and 24: Designation Root-meansquare value V
- Page 25 and 26: Designation Root-meansquare value A
- Page 27 and 28: Description 3.3 Measured variables
- Page 29 and 30: Description 3.4 Load profile Parame
- Page 31 and 32: Description 3.4 Load profile Rollin
- Page 33 and 34: Description 3.4 Load profile Access
- Page 35 and 36: Description 3.4 Load profile Impact
- Page 37 and 38: Description 3.6 Technical features
- Page 39 and 40: Phase angles Unbalance Description
- Page 41 and 42: Description 3.8 Limit values Combin
- Page 43 and 44: Digital Inputs The output of pulses
- Page 45 and 46: Description 3.11 Slots for expansio
- Page 47 and 48: Description 3.12 Serial gateway Con
- Page 49 and 50: 3.14 Password protection Scope Form
- Page 51 and 52: 3.16 Events Displaying events Descr
- Page 53 and 54: Event Event class LIMIT LOG. OP=1 O
- Page 55 and 56: Operation planning 4 4.1 Operation
- Page 57 and 58: Installation 5 5.1 Unpacking Observ
- Page 59 and 60: Procedure See also Installation 5.2
- Page 61 and 62: Installation 5.3 Mounting on the sw
- Page 63 and 64: Installation step B Installation st
- Page 65 and 66:
Deinstallation steps 1. Discharge a
- Page 67 and 68:
Connecting 6 6.1 Safety notes Instr
- Page 69 and 70:
DIC DI1 DI0 DOC DO1 DO0 Figure 6-2
- Page 71 and 72:
DIC DI1 DI0 DOC DO1 DO0
- Page 73 and 74:
Protecting the current measuring in
- Page 75 and 76:
Figure 6-8 Connecting the cables to
- Page 77 and 78:
Connecting 6.4 Connection examples
- Page 79 and 80:
Connecting 6.4 Connection examples
- Page 81 and 82:
(11) Two-phase measuring, three con
- Page 83 and 84:
Design Connecting 6.5 Grounding of
- Page 85 and 86:
Startup 7 7.1 Overview Prerequisite
- Page 87 and 88:
7.3 Parameterizing the device 7.3.1
- Page 89 and 90:
7.3.3 Date and time Procedure Start
- Page 91 and 92:
7. Open edit mode of the "CONNECTIO
- Page 93 and 94:
7.3.4.4 Setting the voltage input P
- Page 95 and 96:
7.4 Apply the measuring voltage See
- Page 97 and 98:
Operator control 8 8.1 Device inter
- Page 99 and 100:
Operator control 8.1 Device interfa
- Page 101 and 102:
Operator control 8.1 Device interfa
- Page 103 and 104:
Operator control 8.1 Device interfa
- Page 105 and 106:
Display title The display title in
- Page 107 and 108:
8.1.3 Display of the "MAIN MENU" Di
- Page 109 and 110:
Function keys See also Table 8- 2 A
- Page 111 and 112:
Function keys See also Operator con
- Page 113 and 114:
8.2.2 Operator input steps in the "
- Page 115 and 116:
8.2.5 Operator input steps in edit
- Page 117 and 118:
Table of instantaneous values The t
- Page 119 and 120:
Parameterizing 9 9.1 Introduction D
- Page 121 and 122:
9.2.3 Language and regional setting
- Page 123 and 124:
Parameterizing 9.2 Parameterizing t
- Page 125 and 126:
9.2.5 Power demand POWER DEMAND See
- Page 127 and 128:
9.2.7 Integrated I/Os DIGITAL OUTPU
- Page 129 and 130:
Parameterizing 9.2 Parameterizing t
- Page 131 and 132:
9.2.8 Communication Parameterizing
- Page 133 and 134:
9.2.10 Advanced Parameterizing 9.2
- Page 135 and 136:
Parameterizing 9.2 Parameterizing t
- Page 137 and 138:
LIMIT LOGIC Parameterizing 9.2 Para
- Page 139 and 140:
Parameterizing 9.2 Parameterizing t
- Page 141 and 142:
NOTICE 9.2.11 External modules Para
- Page 143 and 144:
To switch password protection on, p
- Page 145 and 146:
9.2.12.5 Password lost - what to do
- Page 147 and 148:
Service and maintenance 10 10.1 Cal
- Page 149 and 150:
3. Switch the system and the device
- Page 151 and 152:
10.5 Repair Procedure See also NOTI
- Page 153 and 154:
Technical data 11 11.1 Technical da
- Page 155 and 156:
Power supply Battery Design of the
- Page 157 and 158:
Communication Displays and controls
- Page 159 and 160:
Dimensions of the ring lug Dimensi
- Page 161 and 162:
Degree of protection and safety cla
- Page 163 and 164:
11.2 Labeling Labels on the housing
- Page 165 and 166:
Dimension drawings 12 Panel cutout
- Page 167 and 168:
Clearance measurements Clearances F
- Page 169 and 170:
Appendix A.1 Measured variables A M
- Page 171 and 172:
Name Abbrev. DE + IEC Abbrev. EN +
- Page 173 and 174:
Name Abbrev. DE + IEC Abbrev. EN +
- Page 175 and 176:
Name Abbrev. DE + IEC Abbrev. EN +
- Page 177 and 178:
Name Abbrev. DE + IEC Abbrev. EN +
- Page 179 and 180:
Name Abbrev. DE + IEC Abbrev. EN +
- Page 181 and 182:
Name Abbrev. DE + IEC Abbrev. EN +
- Page 183 and 184:
Name Abbrev. DE + IEC Harmonics Vol
- Page 185 and 186:
Name Abbrev. DE + IEC Harmonics Cur
- Page 187 and 188:
Name Abbrev. DE + IEC Harmonics Cur
- Page 189 and 190:
Name Abbrev. DE + IEC Abbrev. EN +
- Page 191 and 192:
Name Abbrev. DE + IEC Abbrev. EN +
- Page 193 and 194:
Name Abbrev. DE + IEC Minimum slidi
- Page 195 and 196:
Name Abbrev. DE + IEC Abbrev. EN +
- Page 197 and 198:
Appendix A.3 MODBUS Offset Number o
- Page 199 and 200:
Appendix A.3 MODBUS Offset Number o
- Page 201 and 202:
Appendix A.3 MODBUS Offset Number o
- Page 203 and 204:
Appendix A.3 MODBUS A.3.2 Structure
- Page 205 and 206:
Appendix A.3 MODBUS A.3.4 Structure
- Page 207 and 208:
Offset Number of registers 523 2 In
- Page 209 and 210:
Appendix A.3 MODBUS Offset Number o
- Page 211 and 212:
Appendix A.3 MODBUS Offset Number o
- Page 213 and 214:
A.3.9 Minimum values with a time st
- Page 215 and 216:
Appendix A.3 MODBUS Offset Number o
- Page 217 and 218:
Appendix A.3 MODBUS Offset Number o
- Page 219 and 220:
Appendix A.3 MODBUS Offset Number o
- Page 221 and 222:
Appendix A.3 MODBUS Offset Number o
- Page 223 and 224:
Appendix A.3 MODBUS Offset Number o
- Page 225 and 226:
Appendix A.3 MODBUS Offset Number o
- Page 227 and 228:
Appendix A.3 MODBUS Offset Number o
- Page 229 and 230:
Appendix A.3 MODBUS Offset Number o
- Page 231 and 232:
Value Assignment 8 = Current c 9 =
- Page 233 and 234:
Value Assignment 92 = Amplitude Unb
- Page 235 and 236:
Value Assignment 176 = 21st Harmoni
- Page 237 and 238:
A.3.14 Communication settings with
- Page 239 and 240:
A.3.15 I&M settings Addressing the
- Page 241 and 242:
Offset Number of registers Name For
- Page 243 and 244:
ESD guidelines B.1 Electrostatic se
- Page 245 and 246:
List of abbreviations C.1 Abbreviat
- Page 247 and 248:
Glossary 100BaseT 10BaseT Autonegot
- Page 249 and 250:
Index A Acknowledgable events, 51 A
- Page 251 and 252:
Terminal labeling, 70 Serial gatewa