DEVELOPMENT REPORT TO ENVIRONMENT, PLANNING AND<br />

ADMINISTRATIVE SERVICES COMMITTEE MEETING<br />

HELD ON TUESDAY 1 AUGUST 2006 Page 17<br />

P06/53 DEVELOPMENT APPLICATION NO: 861/06– BROULEE 02.6410.D<br />

MULTI-PURPOSE HARDCOURT & CLASSROOM ADDITIONS 02.6410.B<br />

1. This development is to be carried out in accordance with the plans stamped and<br />

numbered 06/861 and supporting specifications and documentation or as modified by<br />

these conditions or as noted in red by <strong>Council</strong> on the approved plans.<br />

Note: Any alteration to the plans and/or documentation shall be submitted for the<br />

approval of <strong>Council</strong>. Such alterations may require the lodgement of an<br />

application to amend the consent under s96 of the Act, or a fresh development<br />

application. No works, other than those approved under this consent, shall be<br />

carried out without the prior approval of <strong>Council</strong>.<br />

Where there is an inconsistency between the documents lodged with this<br />

application and the following conditions, the conditions shall prevail to the<br />

extent of that inconsistency. [ 2.05 ]<br />

2. Inspections & Certificates<br />

For the purposes of section 109E(3)(d) of the Environmental <strong>Planning</strong> and Assessment<br />

Act, the following are occasions on which building work must be inspected. These<br />

inspections are the critical stage inspections.<br />

The critical stage inspections may be carried out by the Principal Certifying Authority<br />

or, if the Principal Certifying Authority agrees, by another certifying authority. The<br />

last critical stage inspection required to be carried out for the class of building<br />

concerned must be carried out by the Principal Certifying Authority.<br />

In the case of a class 5, 6, 7, 8 or 9 building, the development site must be inspected:<br />

(a) at the commencement of the building work, and<br />

(b) prior to covering any stormwater drainage connections, and<br />

(c) after the building work has been completed and prior to Occupation Certificate<br />

being issued for the building.<br />

3. All building work must be carried out in accordance with the provisions of the<br />

Building Code of Australia (BCA).[23.01]<br />

4. Hardcourt - Hours of Use<br />

Use of the hardcourt is restricted to between the hours of 8.00am - 5.00pm Monday to<br />

Saturday only.<br />

5. Tree Preservation Order<br />

The land is within an area over which a Tree Preservation Order has been gazetted and<br />

this Order prohibits the ringbarking, cutting down, topping, lopping, removing,<br />

injuring or willful destruction of any tree without the consent of <strong>Council</strong>. [16.01]