2. Work Strategy and Schedule:<br />

All TAB shall be done in full accordance with the NEBB<br />

.methods and procedures as hereinafter described.<br />

It has been assumed by the TAB contractor that the<br />

existing equipment and the chilled and heating water<br />

systems were and are operating satlsfactorily and<br />

performing as intended. No adjustments to any of this<br />

equipment (nor cost for same) has been included in this<br />

TAB Contractors price. Any adjustments that may be<br />

required on the existing equipment shall be performed by<br />

others or as an add to the TAB Contract.<br />

The TAB work shall be performed on each of the air<br />

distribution systems (meaning all areas supplied by<br />

individual air handling system) as a separate TAB<br />

operation. This method will provide the least amount of<br />

disturbance to the activities of the facillty while<br />

performing the TAB. However, because each air handling<br />

units serves several different rooms it will not be<br />

possible to completely balance one room at a time. The<br />

TAB work may require re-balanclng each room two or three<br />

times untll the entire system is balanced. The areas<br />

constituting systems are as follows:<br />

Equipment Area Served TAB Time<br />

New AHU-I:<br />

Air Apparatus Test<br />

Apparatus Coll Test<br />

"Air Outlet Test<br />

New AHU-2:<br />

Air Apparatus Test<br />

Apparatus Coll Test<br />

Air Outlet Test<br />

Exlstinq AHU-I:<br />

*Air Outlet Test<br />

Existlnq AHU-2:<br />

*Air Outlet Test<br />

Exlstinq AHU-3:<br />

*Air Outlet Test<br />

Existing AHU-4:<br />

*Air Outlet Test<br />

Dry Storage 67 1 Day<br />

Womens Dressing Room 81<br />

Womens Toilet 82<br />

Mens Toilet 80<br />

Mens Dressing Room 83<br />

Snack Bar 84<br />

i Day<br />

International Bar 19 2 Days<br />

Den Bar 30 I Day<br />

Carolina Room 42<br />

Dining Room 43<br />

Cafeteria 44<br />

Service Corridor 41<br />

LeJeune Room Lobby 35<br />

LeJeune Room 36<br />

LeJeune Room Bar 37<br />

1 Day<br />

2 Days