3. Simulated Loads:<br />

All simulated loads shall be accomplished through the<br />

control system by introducing a false slgnal to the<br />

control device. The controls on ths Job are existing<br />

pneumatic, and the various control valves can be<br />

positioned ether fully open or closed by varying the<br />

control air pressure to the device with a pneumatic<br />

"squeeze bulb" The performance of the equipment can<br />

then be measured to establish its full heating and<br />

cooling capabilities.<br />

4. Seasonal Restrictions:<br />

The TAB work will be performed during August which will<br />

fully demonstrate theequlpment performance during the<br />

cooling season. At some time during the month of<br />

February, the TAB Contractor shall re-vlslt the facility<br />

and check the operation of the new HVAC equipment (AHU-I,<br />

AHU-2, FC-1 thru FC-5, steam-HW converter). A11<br />

necessary adjustments and TAB should be accomplished<br />

within a three day period. It should be noted that the<br />

TAB contractor is not responsible for the TAB of the<br />

existing equipment but will so notify the owner of any<br />

problems found so discovered.<br />

Support Required:<br />

During the TAB operations the TAB Contractor will need<br />

assistance from the government personnel the chiller and<br />

boiler plants and some one to make necessary adjustments<br />

to the existing AHU that may be required.