3. It is assumed that all existing AHU coll are<br />
balanced and no work will be required on those<br />
units<br />
4. It is assumed that the existing pumps have the<br />
capacity and pressures required to deliver the<br />
specified flow rates to the equipment.<br />
It is assumed that all existing fan systems<br />
which were not changed under this contract will<br />
be functioning but the time the TAB operations<br />
begin<br />
It is assumed that all existing control systems<br />
which were not changed under this contract will<br />
be functioning but the time the TAB operations<br />
begin.<br />
It is assumed that the contractor shall have<br />
full access during normal working hours to all<br />
areas involved for the TAB operations.<br />
*The owner’s maintenance personnel will have to<br />
perform some work before these systems are fully<br />
functlonable.<br />
E. Adequacy of Design:<br />
General The plans and specifications (along<br />
with on site observations) have been reviewed<br />
for the purpose of determining the procedures<br />
and techniques required for proper TAB of the<br />
various air and water systems.’" (No<br />
consideration have been given to testing steam<br />
rates, condensate flow rates, quallty of steam,<br />
etc., as that is beyond this contract<br />
requirements.<br />
No evaluations of heating and cooling loads, air<br />
and water flows requirements, comfort<br />
conditions, etc., have been made as it is<br />
assumed these were taken into consideration by<br />
the design engineer. From our examinations we<br />
have found several pieces of equipment that have<br />
not been provided with sufficient devices to<br />
enable an accurate TAB. While close TAB can be<br />
performed, which is common in the commercial<br />
industry, the requirements to meet NEBB or AABC<br />
standards will require that additional devices<br />
be added as follows:<br />
a) Balancing Value and Flow Sensors on<br />
steam/hot water converter