3. It is assumed that all existing AHU coll are<br />

balanced and no work will be required on those<br />

units<br />

4. It is assumed that the existing pumps have the<br />

capacity and pressures required to deliver the<br />

specified flow rates to the equipment.<br />

It is assumed that all existing fan systems<br />

which were not changed under this contract will<br />

be functioning but the time the TAB operations<br />

begin<br />

It is assumed that all existing control systems<br />

which were not changed under this contract will<br />

be functioning but the time the TAB operations<br />

begin.<br />

It is assumed that the contractor shall have<br />

full access during normal working hours to all<br />

areas involved for the TAB operations.<br />

*The owner’s maintenance personnel will have to<br />

perform some work before these systems are fully<br />

functlonable.<br />

E. Adequacy of Design:<br />

General The plans and specifications (along<br />

with on site observations) have been reviewed<br />

for the purpose of determining the procedures<br />

and techniques required for proper TAB of the<br />

various air and water systems.’" (No<br />

consideration have been given to testing steam<br />

rates, condensate flow rates, quallty of steam,<br />

etc., as that is beyond this contract<br />

requirements.<br />

No evaluations of heating and cooling loads, air<br />

and water flows requirements, comfort<br />

conditions, etc., have been made as it is<br />

assumed these were taken into consideration by<br />

the design engineer. From our examinations we<br />

have found several pieces of equipment that have<br />

not been provided with sufficient devices to<br />

enable an accurate TAB. While close TAB can be<br />

performed, which is common in the commercial<br />

industry, the requirements to meet NEBB or AABC<br />

standards will require that additional devices<br />

be added as follows:<br />

a) Balancing Value and Flow Sensors on<br />

steam/hot water converter