Heat Exchangers/Converlers<br />
a) Determine Ihe water flow pressure drop<br />
through the heal exchanger for nil circuits. With<br />
Ihe measured dilferonlinl pres.guro, Ihe wnler<br />
flow can be ollainerl from tim mnr.fnchrnr’<br />
submillnl dale ctwos or Inblns. Adj,l lhn<br />
wler IIo to design co,diIions nnd record flow<br />
data.<br />
b) After nil fan-coil lype trails hnvn been pd<br />
oporlion wilh ntdomnllc vnlv Ndly elm. wilh<br />
flow Ihrough Ihe coil nn(! nflr lira locifio(I<br />
flow over the coil hns bee ostnblishod,<br />
Ihe enlerlng and leaving wnlor Iompornl.ro<br />
all chillers, boilers, Imnl oxchnngors nnd coils.<br />
Record and compete wilh design condilior.<br />
Hydronlc syslems inslnlled wilh reverse<br />
plplng are less difficull Io balnico Ihnn<br />
direcl relum sysloms. When Inn-coil unil or<br />
induclion traits nr uso(I wilh n cliecl<br />
piping system, a flow clmck lhrolh nch<br />
should be mnde, eilhor hem pmssre<br />
ncross each coil, from pressure<br />
acoss each ulomlic wnter vnlve, or (n<br />
Ist resorl) Irom wlor or ir<br />
readings Io dale.nine Ihe wnlor flow<br />
When n reverse relearn rier pil)inl Syslm is<br />
Inslalled, a dislHbdion flow chock cn bo<br />
nl each sel of risos fo mnkn s,n llmI nll<br />
d)<br />
e)<br />
lalrly uniform wInr lemp-nh,e II. All<br />
eulomalic walor wives mJsl Im Ien nrl :rils<br />
musl have the rnled nit flow whe. waler hmperalures<br />
are being checked.<br />
When syslems have nudIipIo coil socIion,<br />
where possible, halnnce Ilm wnlnr flow by<br />
IobIishing the desiIn wnler pressIro drop<br />
across each coil. An nIIernaln melhnd<br />
balancing mulIiiIo sqclios inv(Ivns nlii<br />
the wnler Iompelah,es nl ench coil<br />
with Insertion lhormomolors or<br />
pyromeler probes, n(I ndjtJsIing the bIncinl<br />
rocks unlit uniform Iomperalures re oblained.<br />
Complele the proco(IJrs hy rr:nrdh(i<br />
dnln. proprlng the TAB report Ioms lo sIinitial<br />
as reqylred.<br />
SECTION<br />
b) lnkn Inlet mr+d otdlet ,waler lemperalure<br />
.:ndi.gs; check againsl design dale and rec-<br />
c) Gheck and record Ihe sleam pressure; check<br />
!11o soiling mdlor operalion of nulomallc lemlmrnhre<br />
conlrol vnlves, qlf-conlnlned conlrol<br />
vnlvns, or prnsure reducing valves here<br />
d)<br />
o) Gonlhm Ihal 11 ptpo slrainers are doan.<br />
l) Check Ihe operalion of sleam lrap8,<br />
g) Clmck 11 automatic air venls; manually vent air<br />
ns required.<br />
h) Follow lira bnslc procedures for hot waler or<br />
tnnm system TAB woik for ilems not menli.nod<br />
nbovo.<br />
i) l’elnm all<br />
quiod.<br />
0pod forms and sbmll s re-<br />
lnc,d sgloly valve sellllgs.