Heat Exchangers/Converlers<br />

a) Determine Ihe water flow pressure drop<br />

through the heal exchanger for nil circuits. With<br />

Ihe measured dilferonlinl pres.guro, Ihe wnler<br />

flow can be ollainerl from tim mnr.fnchrnr’<br />

submillnl dale ctwos or Inblns. Adj,l lhn<br />

wler IIo to design co,diIions nnd record flow<br />

data.<br />

b) After nil fan-coil lype trails hnvn been pd<br />

oporlion wilh ntdomnllc vnlv Ndly elm. wilh<br />

flow Ihrough Ihe coil nn(! nflr lira locifio(I<br />

flow over the coil hns bee ostnblishod,<br />

Ihe enlerlng and leaving wnlor Iompornl.ro<br />

all chillers, boilers, Imnl oxchnngors nnd coils.<br />

Record and compete wilh design condilior.<br />

Hydronlc syslems inslnlled wilh reverse<br />

plplng are less difficull Io balnico Ihnn<br />

direcl relum sysloms. When Inn-coil unil or<br />

induclion traits nr uso(I wilh n cliecl<br />

piping system, a flow clmck lhrolh nch<br />

should be mnde, eilhor hem pmssre<br />

ncross each coil, from pressure<br />

acoss each ulomlic wnter vnlve, or (n<br />

Ist resorl) Irom wlor or ir<br />

readings Io dale.nine Ihe wnlor flow<br />

When n reverse relearn rier pil)inl Syslm is<br />

Inslalled, a dislHbdion flow chock cn bo<br />

nl each sel of risos fo mnkn s,n llmI nll<br />

d)<br />

e)<br />

lalrly uniform wInr lemp-nh,e II. All<br />

eulomalic walor wives mJsl Im Ien nrl :rils<br />

musl have the rnled nit flow whe. waler hmperalures<br />

are being checked.<br />

When syslems have nudIipIo coil socIion,<br />

where possible, halnnce Ilm wnlnr flow by<br />

IobIishing the desiIn wnler pressIro drop<br />

across each coil. An nIIernaln melhnd<br />

balancing mulIiiIo sqclios inv(Ivns nlii<br />

the wnler Iompelah,es nl ench coil<br />

with Insertion lhormomolors or<br />

pyromeler probes, n(I ndjtJsIing the bIncinl<br />

rocks unlit uniform Iomperalures re oblained.<br />

Complele the proco(IJrs hy rr:nrdh(i<br />

dnln. proprlng the TAB report Ioms lo sIinitial<br />

as reqylred.<br />

SECTION<br />

b) lnkn Inlet mr+d otdlet ,waler lemperalure<br />

.:ndi.gs; check againsl design dale and rec-<br />

c) Gheck and record Ihe sleam pressure; check<br />

!11o soiling mdlor operalion of nulomallc lemlmrnhre<br />

conlrol vnlves, qlf-conlnlned conlrol<br />

vnlvns, or prnsure reducing valves here<br />

d)<br />

o) Gonlhm Ihal 11 ptpo slrainers are doan.<br />

l) Check Ihe operalion of sleam lrap8,<br />

g) Clmck 11 automatic air venls; manually vent air<br />

ns required.<br />

h) Follow lira bnslc procedures for hot waler or<br />

tnnm system TAB woik for ilems not menli.nod<br />

nbovo.<br />

i) l’elnm all<br />

quiod.<br />

0pod forms and sbmll s re-<br />

lnc,d sgloly valve sellllgs.