12)<br />
B<br />
lurn or exlra[tsl air system should be balanced<br />
before Ihe supply syslem is balanced,In conlinualion<br />
of Ihis procedural oulline, Ihe assumplion<br />
Is made Ihal Ihe supply syslem balance is<br />
nol reslrained by Ihe ehausl syslem or Ibe<br />
relurn syslem: tlowever, if such a reslrainl<br />
exisls, Ibe exhausl syslem or Ibe rehfrn syslem<br />
should be balanced prior 1o conlittuing will) lira<br />
supply syslem.<br />
The syslem is considered balanced in accordance<br />
will) Ibese procedural slandards when<br />
lbe value ol Ibe air q[fanlily ol each inlel or<br />
device is measured and found Io be wilhin 10%<br />
ot Ibe design air fluanlilies (unles Ilmre are<br />
reasons beyond lira conhol of lhe TAB lirm--<br />
SUPPI.Y AIR SYSTEM<br />
PROCEDUFIES<br />
1) Make Pilol lube Iraverses on all main s=pply<br />
and major branch ducls 1o delermine Ihe air<br />
dislribulion, h|vesligale any branch Ihal is very<br />
low in capacily Io make sure Ihal no blockage<br />
exisls.<br />
2) Adjusl Ibe vohJm, P. dampers in life main and<br />
branch ducls Io Ihe approximale airflow (clm)<br />
requirement.<br />
3) Wilhoul adjusling any lerminal device, measure<br />
and record Ibe airllow al each leminal in Ihe<br />
syslem. Sludy any radical condilions and correcl<br />
Ibem. Plan Ihe se(llmnce el branch balanc<br />
Ing. In making adjushrmnls, it is preferable Io<br />
adjusl volume dampers inslead of exlraclors (il<br />
inslalled) or Ibe dampers al Ibe air lerminals. If<br />
Ihe lhrollling process at Ibe lerminal involves<br />
closing Ibe damper !o a degree lhal generales<br />
noise, evaluale the design chn capacily of<br />
branch ducl.<br />
,4) Working from Ihe branch wilh Ibe bighesl measured<br />
capaclly 1o the branch wilh Ihe Iowesl<br />
measured capacity, make adj|Jshnenls in each<br />
branch. Beginning wilh Ibe oullel mosl dislanl<br />
Item Ihe branch conneclion and proceeding Ioward<br />
Ihe branch conneclion, make volume adlustmenls<br />
al each lerminal as necessary. I! is<br />
Impodanl Ihal lbe balancer uses Ibe proper "k"<br />
lacier prescribed by Ibe air lerminal manufaclurer<br />
for use in conjunclion wilb a padiculnr<br />
tnslrumenl. In addilion, il is necessmy Ibal Ibe<br />
readings al grilles, registers and diffusers be<br />
FIGURE 5-3 A Typical Air Diffuser Velocity<br />
Measurement<br />
taker) in a position or number of positions prescribed<br />
by the manufacturer of lhe air lerminal<br />
device.<br />
5) Flepr:nl the branch balancing unlil Ihe syslem is<br />
it) balm)ca.<br />
6) Verity Ihe tan capacity and operating condilions<br />
again and make a final adjuslment in the fan<br />
drive if necessary.<br />
7) If the supply system was tested with dry cob -"<br />
surface and is designed for dehumldificalion,<br />
the air quanlily should be checked under wet<br />
coil conditions. (Often, 10% to 15% Is added Io<br />
lhe system setting Instead.)<br />
8) After the supply and return exhaust systems are<br />
balanced, the supply fan capacity should be ,<br />
checked wilh 100% oulside air operation if Ibis<br />
alternalive is included in system design. Appropriale<br />
damper adjuslmenls should be made if<br />
necessary.<br />
9) Record Ihe "as balanced" slate of the syslem<br />
on reporl forms for all terminals and ducl appartlus.