South Side - <strong>Vernon</strong> <strong>High</strong> <strong>School</strong><br />
2 Junction Boxes & 1 Utility Disconnect (Proposed Location)<br />
1 Junction Box to Critical Load Panel<br />
1 Utility Disconnect to Main Distribution Panel<br />
1 Junction Box to Monitoring system<br />
Conduit Path (Proposed)<br />
46'x 70' (Approx) 4ft - 6ft <strong>High</strong> Fencing Surrounding Array<br />
With Access Gate<br />
Provided by others<br />
Equipment Location<br />
SCALE: NTS<br />
N<br />
<strong>Solar</strong> Equipment Enclosure<br />
36'4"<br />
18'<br />
<strong>Solar</strong> Array<br />
46' x 16'6" Array<br />
Note:<br />
1. Array Location Dimensions and Wire Run Distances and routes are<br />
approximations. Minor Adjustments left to the discretion of the<br />
Contractor may be necessary pending the identification of any<br />
underground utilities and unforeseen obstructions.<br />
2. A double barrier fence no less than 10 ft apart is required around the<br />
perimeter of the construction site during construction.<br />
3. The location of all underground utilities must be performed by the<br />
contractor prior to any construction.<br />
4. Final Array Fencing must be spaced 11' Min from East West and South<br />
sides of Array for a 6ft fence and a 3' Min for a 4ft high fence.<br />
Legend:<br />
Electrical Room Location:<br />
Bldg 400 Electrical Room<br />
<strong>Solar</strong> World SW240<br />
Module<br />
PV Array<br />
Location<br />
Trench Distance: 189ft & Directional Boring: 0ft<br />
Wire Run - Enclosure to Electrical Room: 229ft<br />
<strong>Solar</strong> Equipment Enclosure<br />
N<br />
3232 Moss Hill Road, <strong>Vernon</strong>, FL 32462<br />
Design for:<br />
I CERTIFY THAT THIS PV<br />
SYSTEM FULLY COMPLIES<br />
WITH THE REQUIREMENTS<br />
OF NEC 690.<br />
PV SYSTEM<br />
Total Output:<br />
# Modules:<br />
Manufacturer:<br />
Model:<br />
<strong>Vernon</strong> <strong>High</strong> <strong>School</strong><br />
<strong>Solar</strong> <strong>School</strong> Shelters<br />
Battery Backup PV System<br />
Equipment Location<br />
SCALE: NTS<br />
DRAWN BY: RB,HB<br />
CHECKED BY: EC<br />
DATE: 10/03/11<br />
SHEET 3 OF 20<br />
Revision:<br />
00<br />
10.08 kW<br />
42<br />
<strong>Solar</strong> World<br />
240<br />
Sheet:<br />
E.E. Castillo, PE<br />
Licensed Engineer #: PE52590<br />
Certification of Authorization #28406<br />
3601 N. DIXIE HWY, BAY 16 BOCA RATON, FL 33431<br />
PHONE: 561.750.8677 FAX:561.750.0518<br />
A-02