FY2009 - Former Fort Ord - Environmental Cleanup
FY2009 - Former Fort Ord - Environmental Cleanup
FY2009 - Former Fort Ord - Environmental Cleanup
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
closeout is attained, which is expected in FY14.<br />
Site ID: FTO-001-R-01<br />
Site Name: BLM-EAST<br />
The site strategy for the remaining portion of the range complex includes:<br />
- Track 1 sites: No further RA is required for this portion of the range complex based on the Track 1 ROD (MRS-27X, MRS-<br />
32A/B, MRS-63, MRS-69 and MRS-70; 239 acres). LTM measures are required based on Track 1 ROD. The LTM requirement<br />
will end based on the 2012 five-year review.<br />
- Track 1 future sites: site assessment and Track 1 approval memorandum are required for 939 acres (MRS-17, MRS-<br />
27J/K/L/M/N/O/P/Q/R/S/T/U/V/W, MRS-61, MRS-64, MRS-65, MRS-67 and MRS-68). LTM will be required through 2017 five-year<br />
review.<br />
- Track 2 future sites: site assessment, Track 2 RI/FS, proposed plan and ROD are required for 664 acres (MRS-32C, MRS-<br />
14B/C/D/E, MRS-25, MRS-26, MRS-12 and MRS-21). LTM will be required.<br />
Final FORT ORD Installation Action Plan - 30