TT225 StageIII+ Installation Manual.pdf - APR
TT225 StageIII+ Installation Manual.pdf - APR
TT225 StageIII+ Installation Manual.pdf - APR
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
13. Install oil feed and return line from bag 8 and 12 onto turbo. With the gaskets supplied bolt<br />
the larger oil line, with fl anges, to the bottom of the turbo. Connect the thinner longer line to the<br />
top of the turbo.<br />
14. With the supplied gasket and hardware in bag 3, install turbo. Install lock washers as indicated in<br />
diagram and torque nuts to 40nm/30ft-lbs<br />
15. Route oil feed line around driver’s side of engine and connect to oil cooler. Be careful not to route<br />
line were it may contact rubber components.<br />
16. With supplied fl ange and hardware, connect oil return line to oil pan.<br />
17. Connect the shorter of the two coolant lines to the engine block where you removed the existing<br />
line.<br />
18. Route the remaining coolant line around the passenger’s side of the engine and connect to the<br />
stock location.<br />
19. With supplied hardware in bag 4, install turbo exhaust downturn onto turbo. The large threaded<br />
hole is to access the inside bolt. Once it has been tightened, install the primary O2 sensor to seal it.<br />
Use the O2 sensor extention cable to allow the sensor to reach the new location.<br />
20. Lift car and remove fuel fi lter. In it’s place install the fuel pump supplied with hardware found in bag<br />
5. Be sure the arrow is pointing towards the front of the car and the sound-dampening boot is installed<br />
over the pump. The bundy fi ttings will allow the existing fuel lines to connect directly to the new pump<br />
in the same way the fi lter was connected.<br />
AUDI PERFORMANCE & RACING<br />
1027-B Opelika Road Auburn Alabama 36830