NEPS = North East Power System<br />
Afghanistan<br />
Power Sector Needs<br />
Uzbekistan Imports<br />
100MW to 470MW<br />
$20M ($.06/KwH)<br />
SEPS = South East Power System<br />
Uzbekistan<br />
Turkmenistan<br />
Sheberghan<br />
Qal'a-i Mamay<br />
445<br />
Tajikistan Imports<br />
300MW<br />
April- October<br />
ADB - Construction Un<strong>der</strong>way<br />
($0.035 KwH)<br />
200<br />
48<br />
400<br />
54<br />
Kelegai<br />
Iran<br />
Shiberghan Gas Field<br />
Thermal Power Plants Power and<br />
Gas Lines<br />
200MW + 48MW<br />
$440M ($.06/KwH)<br />
24 Months<br />
Sheberghan Gas<br />
Field<br />
NEPS 2<br />
NEPS 2 Expansion<br />
600MW 600MW Capacity<br />
$400-600M Capacity<br />
48 Months $400M<br />
48 Months<br />
Fertilizer Plant<br />
Aynak Coal<br />
Tarakhil<br />
Pul-e-Khumri Substation<br />
105<br />
250<br />
66<br />
100<br />
400<br />
Baghdara<br />
Naghlu<br />
Northern Run-of-River<br />
Hydropower Untapped<br />
600- 1,200MW<br />
$2.5 to $3B<br />
48 Months<br />
Gamberi<br />
Shal<br />
800<br />
36<br />
Proposed 500kV Line<br />
Existing 220kV 2 Circuit<br />
Proposed 22okV 2 Circuit<br />
Existing 110kV Line<br />
Proposed 110kV Line<br />
Kajaki Power and<br />
Irrigation Expansion<br />
60-100MW<br />
$400 to $500M<br />
60-84 Months<br />
NEPS<br />
Hajigak Iron<br />
22<br />
Aynak Copper<br />
Sarubi<br />
180<br />
Sarubi 2<br />
11<br />
Darunta<br />
Existing 20kV Import Line<br />
Proposed 500/220kV Substation<br />
Existing/Proposed 220kV Substation<br />
Existing/Proposed 110kV Substation<br />
Existing Natural Gas Pipeline<br />
27<br />
SEPS<br />
52<br />
34<br />
Kajaki<br />
Transmission and Distribution to<br />
Eastern Populations 400MW Capacity<br />
$280M<br />
24-30 Months<br />
Proposed Natural Gas Pipeline<br />
TPP<br />
Thermal Power Plant<br />
Hydropower Plant (proposed)<br />
Natural Gas Field<br />
SEPS Expansion<br />
Kajaki Unit 2<br />
from 34 to 52MW<br />
Kandahar Upgrades<br />
Plus Transmission and<br />
Distribution<br />
$442M<br />
32-38 Months<br />
Dala<br />
NEPS-Kandahar Tactical<br />
Tie-in<br />
30MW-150MW<br />
$480M<br />
36 Months<br />
Pakistan