Deutsch-Afghanische Freundschaft Gesellschaft eV - bei der ...
Deutsch-Afghanische Freundschaft Gesellschaft eV - bei der ...
Deutsch-Afghanische Freundschaft Gesellschaft eV - bei der ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Near- Medium Term Power Sector Needs<br />
<strong>Deutsch</strong>-<strong>Afghanische</strong> <strong>Freundschaft</strong> <strong>Gesellschaft</strong> e.V.<br />
Energy Project Projected Cost Timeframe<br />
Near Term (0-5 years)<br />
Component Total<br />
• DABS Commercialization: Kabul, Kandahar $59,000,000 2009-2012<br />
• Kandahar-Helmand Power Initiative $512,000,000 2010-2013<br />
• Kandahar SIP/Silo + Fuel $410,000,000 2010-2013<br />
• NEPS to SEPS Engineering Design $70,000,000 2009-2011<br />
• NEPS to SEPS Transmission Backbone $380,000,000 2010-2013<br />
• NE Transmission and Distribution (Kabul to Khost) $376,800,000 2011-2013<br />
• Kabul Distribution Connections $60,000,000 2011<br />
• Sheberghan Gas and Thermal Power $499,000,000 2011-2012<br />
• NEPS Expansion (Hairatan, Salang by pass, Turkmen) $905,000,000 2011-2014<br />
• Transmission Improvement/Efficency (NLCC/SCADA) $102,000,000 2009-2012<br />
• Hydropower Studies/Design (Surobi, Baghdara, Kajaki 2) $80,000,000 2011<br />
• Darunta (11MW) Cascade Hydropower Rehabilitation $11,000,000 2009-2011<br />
• Surobi (180MW) Cascade Hydropower Plant $445,000,000 2012-2015<br />
• 100 MW Expansion at Kajaki HPP $500,000,000 2012-2016/8<br />
• Baghdara (200+100+100 MW) Cascade Hydropower System $900,000,000 2014-2019<br />
• Power and Gas Sector Capacity Building $163,000,000 2011-2015<br />
• Clean Energy Initiatives $83,000,000 2010-2014<br />
• Multi-purpose Dams $322,000,000 2011-2012<br />
• Construction Oversight and Engineering $250,000,000 2011-2015<br />
• Nationwide Distribution Connections $500,000,000 2014-2019<br />
• Near and Medium Term Costs $6,627,800,000 2009 - 2019<br />