South Coast Metropole South Coast Metropole - King Sturge
South Coast Metropole South Coast Metropole - King Sturge
South Coast Metropole South Coast Metropole - King Sturge
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Office market review<br />
In any property cycle the office sector tends to be<br />
the last to recover and the first fall. To date there<br />
is little sign of any faltering, with strong demand,<br />
record rents and significant pipeline schemes across<br />
the region. The structural shortage of good quality<br />
space in the <strong>Metropole</strong> region has at last been<br />
recognised by the development sector, and the<br />
rewards are there for those prepared to take some<br />
risk, with occupier demand remaining buoyant.<br />
It took almost all of 2007 for Ordnance Survey<br />
to obtain detailed consent for a new 13,656 m²<br />
headquarters on the Adanac Park site adjacent to<br />
the M271 to the west of the city. Construction of<br />
the infrastructure road is now under way although<br />
it is likely to be mid-2010 before Ordnance Survey<br />
can take occupation. The remainder of Adanac Park<br />
has outline consent for a further 69,676 m² which<br />
with a restrictive covenant restricting any further<br />
development to a large space user. The owners, The<br />
Barker Mill Trust, are seeking a developer partner to<br />
assist them in the marketing of this site through the<br />
latter part of 2008.<br />
Street art, <strong>South</strong>ampton<br />
Over the past two years we have reported a very<br />
upbeat message on take-up which has increased<br />
year on year since 2005. The five year average of<br />
30,000 m² up to 2005 was exceeded in 2006 by<br />
around 17.5%; 2007 continued the upward trend<br />
with a record year seeing the average annual takeup<br />
increase by 100% above the five-year norm. If<br />
we take into account the two largest pre-lets to<br />
Ordnance Survey and Carnival UK in 2007 a further<br />
30,000 m² can be added to these take up figures.<br />
This would give us a total increase closer to 200%<br />
over the five-year norm.<br />
Carnival UK headquarters, <strong>South</strong>ampton<br />
Carnival UK’s new <strong>South</strong>ampton headquarters is<br />
now under construction after receiving planning<br />
in the second quarter of 2007. This 13,656 m²<br />
headquarters building on part of West Quay 3 will<br />
certainly kick-start the look of this area; however,<br />
with the site being adjacent to the new IKEA<br />
store, the location may not be as attractive as first<br />
thought.<br />
The construction of Number One Dorset Street in<br />
<strong>South</strong>ampton was well under way at the beginning<br />
15